    CORPORATE PRESENTATION PASE BLOCK, ACEH PROVINCE, INDONESIA EXTENSION PHASE 2012 - 2032 FEBRUARY 2015

  2. Slide 2: Important Notice

    Slide 2: Important Notice

    Important Notice The informa-on in this presenta-on is in summary form and should not be relied upon as a complete and accurate representa-on of any ma7ers that a poten-al investor should consider in evalua-ng Triangle Energy (Global) Ltd. While management has taken every effort to ensure the accurac

  3. Slide 3: The New Indonesian Energy Sector

    Slide 3: The New Indonesian Energy Sector

    The New Indonesian DRAFT Energy Sector Recently elected Indonesian President Joko Widodo’s is a strong political leader focused on accelerating the country’s energy sector to satisfy growing consumption. Government Initiates: Open the Indonesian economy; investment & Encouraging Improve underdevelop

  4. Slide 4: The New Indonesian Energy Sector

    Slide 4: The New Indonesian Energy Sector

    The New Indonesian DRAFT Energy Sector 4

  5. Slide 5: The New Indonesian Energy Sector

    Slide 5: The New Indonesian Energy Sector

    The New Indonesian DRAFT Energy Sector 5

  6. Slide 6: The Company

    Slide 6: The Company

    The Company Triangle has been awarded a 20 year extension to the Pase Production Sharing Contract (PSC) with effect from February 2012. Triangle has been the successful operator of the PSC from August 2009 to current. The Pase PSC is located in Aceh Province, North Sumatra, Indonesia and covers a bl

  7. Slide 7: Pase PSC Operational Background

    Slide 7: Pase PSC Operational Background

    Pase PSC Operational Background Triangle purchased the PSC from Exxon-Mobil in Feb 2009 and has since achieved operational excellence § Developed the project from shut-in / brownfield stage to production within 6 months § Generated over $65mm in revenue from a project depleated in by a multi natio

  8. Slide 8: Aceh & Sumatra Region: The Energy Shortage

    Slide 8: Aceh & Sumatra Region: The Energy Shortage

    Aceh & Sumatra Region DRAFT THE ENERGY SHORTAGE Pase is located in the Aceh region in North Sumatra which has an established gas infrastructure and supply facilities to cater to the growing Asian energy markets as well gas markets. as local The Aceh region is now linked to the central Sumatra Corrid

  9. Slide 9: Prolific Oil and Gas production fields surrounding Pase

    Slide 9: Prolific Oil and Gas production fields surrounding Pase

    Prolific Oil and Gas DRAFT production fields surrounding Pase Offshore North Gas condensate Onshore South Shallow Oil Pase I & II Gas / Condensate Oil New 24” gas transmission line 9

  10. Slide 10: Existing Seismic Coverage

    Slide 10: Existing Seismic Coverage

    Pase DRAFT Existing Seismic Coverage Extensive 2D and 3D seismic data over Pase I & Pase II acquired by Mobil in 1990s Pase II Pase I 10

  11. Slide 11: Pase Block Multiple Opportunities

    Slide 11: Pase Block Multiple Opportunities

    Pase Block Multiple Opportunities Pase I Arun Pase II Pase I & II working area is 922km² located adjacent to Block B which is operated by ExxonMobil & contains the Arun mega gas field (approx. 20Tcf) 11

  12. Slide 12: Pase Block Proven Petroleum System

    Slide 12: Pase Block Proven Petroleum System

    Pase Block Proven Petroleum System Source Rocks: Lacustrine black shale Bampo Formation Maturation/Migration Maturation began at about 11 Ma and continues. Migration in the early Miocene and during Plio-Pleistocene Reservoir Rocks: Miocene platform carbonates and reefs of the Belumai and Peutu Forma

  13. Slide 13: Carbonate Reef XK / XL & SLS EXT Summary

    Slide 13: Carbonate Reef XK / XL & SLS EXT Summary

    Pase Carbonate Reef XK / XL & SLS EXT Summary Substan-al Reef Plays proven by surrounding gas fields discovery: Ø Arun 20 TCF (10 kilometers NW) (3,500 mmscfd*) Ø SLSD (250 mmscfd*) Ø SLSA (200 mmscfd*) Ø SLSB (250 mmscfd*) peak produc-on rates *note The prospects are all located close in close p

  14. Slide 14: Carbonate Reef XK Prospect line 69-4

    Slide 14: Carbonate Reef XK Prospect line 69-4

    Pase Carbonate Reef XK Prospect line 69-4 14

  15. Slide 15: Carbonate Reef XK Prospect Plan

    Slide 15: Carbonate Reef XK Prospect Plan

    Pase Carbonate Reef XK Prospect Plan XK 15

  16. Slide 16: Carbonate Reef XK Prospect Plan

    Slide 16: Carbonate Reef XK Prospect Plan

    Pase Carbonate Reef XK Prospect Plan Exploration Plan Economic Indicator • Drill 1 Exploration Well, 1 Appraisal Well IRR 47% • Acquire 150 sq.km 3D Seismic Development Plan NPV (10%) $294 MM • Drill 6 Development Wells, 1 Injector Well • Production Facilities, Pipeline tie into Exxon Mobil’s NCF $7

  17. Slide 17: Pase Block Proven Oil Discovery

    Slide 17: Pase Block Proven Oil Discovery

    Pase Block Proven Oil Discovery CLASTIC JULURAYEU- KETAPANG PLAY SHALLOW OIL <1000 mtrs tvd MULTIPLE TARGETS 17

  18. Slide 18: Pase Block Proven Oil Discovery – XF

    Slide 18: Pase Block Proven Oil Discovery – XF

    Pase Block Proven Oil Discovery – XF • The play was proven by Pase Old Oil Field in B Block, discovered in 1935. • Produc-on commenced in 1937 with a peak produc-on reaching 3,000 BOPD. • Pase old oil field was abandoned in 1943 due to WWII with cumula-ve produc-on of 600,000 bbls. Es-mate remaining

  19. Slide 19: Pase Production Field Three Infill Opportunities

    Slide 19: Pase Production Field Three Infill Opportunities

    Pase Production Field DRAFT Three Infill Opportunities Opportunity 1: BP-­‐2 Sidetrack-­‐1 BP-­‐2 3 aZc gas opportuniEes A-­‐8 ST3 already idenEfied by A-­‐9 preliminary technical studies Opportunity 2: and further 3D seismic studies A-­‐10 planned. A-­‐6 Opportunity 3: A-­‐1 Sidetrack-­‐1 A-­‐5 A-­‐

  20. Slide 20: Pase Production Field Infill Opportunity #1

    Slide 20: Pase Production Field Infill Opportunity #1

    Pase Production Field DRAFT Infill Opportunity #1 • Ajc gas accumula-on immediately adjacent and up dip from exis-ng well A1 which ini-ally produced 100mmscfd • 8” flow line and produc-on facili-es connected to adjacent well A1 Reserves (in BCF) GIIP GIIP TOTAL PORE FRACTURE PASE A&B 265 325 590 RF,

  21. Slide 21: Pase 3 Year Exploration Work Plan

    Slide 21: Pase 3 Year Exploration Work Plan

    Pase DRAFT 3 Year Exploration Work Plan Years AcGviGes DescripGon Budget ($MM) Remarks 2015 G&G Studies Seismic Repro, Passive 0.50 Seismic 3D Seismic Survey & 235.0 km² 8.50 To cover all prospect and Processing leads in Pase Block 1 2016 G&G Studies Seismic Interpreta-on, 0.25 Reprocessing Explora-

  22. Slide 22: Pase 1st Oil and Gas Test Work Schedule

    Slide 22: Pase 1st Oil and Gas Test Work Schedule

    Pase 1st Oil and Gas Test DRAFT Work Schedule 22

  23. Slide 23: Aceh Corporate and Social Responsibility (CSR)

    Slide 23: Aceh Corporate and Social Responsibility (CSR)

    Aceh Corporate and DRAFT DRAFT Social Responsibility (CSR) Triangle’s Acehnese Community Development Program focuses on local health, education and economic development. Triangle continues to carry out regular CSR support: • Maintenance on roads, bridges and local infrastructure • Provide medical su

  24. Slide 24: Goshawk Energy - ATP1186

    Slide 24: Goshawk Energy - ATP1186

    Goshawk Energy - ATP1186 Triangle farms into ATP1186 in the Surat Basin, Queensland DRIVERS Proven oil producing area Large licence area (936km2) located in proven oil system in the Surat Basin in which over 100 hydrocarbon accumula-ons have been discovered High working interest in highly prospec-ve

  25. Slide 25: Goshawk Energy - ATP1186

    Slide 25: Goshawk Energy - ATP1186

    eng Mo, triangle energy oil gas energy Goshawk Energy =AWiPRAagi66 ee ._ ~——)- Bridgeport>|: pence 8) | Fe ST pe Bridgeport’| ‘A New Hope Greub Corny cc Eee: riangle energy ot om onary] aN Pisa ee ALO Gosnani Eversy

  26. Slide 26: Triangle Energy (Global) Limited Corporate Structure

    Slide 26: Triangle Energy (Global) Limited Corporate Structure

    Triangle Energy (Global) Limited Corporate Structure Issued Capital Market CapitalisaGon Ordinary Shares 2,704m @0.001 cents per share $2.705m Unlisted rights 59.55m ASX Code TEG 26

  27. Slide 27: Board of Directors

    Slide 27: Board of Directors

    Board of Directors Board of Directors Edward Farrell (Non-Executive Chairman) Robert Towner (Managing Director & CEO) Darren Bromley (Executive Director, Company Secretary & CFO) Contact Details: Tele. +61 8 9286 8300 robtowner@triangleenergy.com.au www.triangleenergy.com.au PO Box 377, Co7esloe, We