Coelacanth Energy, Inc. · TSXV:CEI

Coelacanth Energy — Investor Presentation (October 2025)

19 slides from Coelacanth Energy's investor presentation, Oct 10, 2025

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    CORPORATE PRESENTATION OCT 10, 2025 TSXV:CEI

  2. Slide 2: Corporate Snapshot

    Slide 2: Corporate Snapshot

    CORPORATE SNAPSHOT A pure play Montney investment opportunity with a proven management team. Corporate Information TSXV Trading Symbol CEI Shares Outstanding Basic 533 million Two Rivers region Shares Outstanding FD 592 million of NEBC Market Capitalization $437 million (over 150 sections of contigu

  3. Slide 3: CEI Montney Investment Thesis

    Slide 3: CEI Montney Investment Thesis

    CEI MONTNEY INVESTMENT THESIS PREMIUM ASSET BASE MANAGEMENT • Over 150 contiguous Montney sections • Six successful prior entities • Substantial hydrocarbons in place • Added value through diverse economic • Multiple development zones conditions over many years • Located in light oil window • Contin

  4. Slide 4: Montney Growth & Resource Value Strategy

    Slide 4: Montney Growth & Resource Value Strategy

    MONTNEY GROWTH & RESOURCE VALUE STRATEGY Two-fold strategy will allow shareholders to participate in both short-term increase in cash flow and long-term increase in resource value. Continued Pad Two Rivers East battery Development and pipelines completed. Two Rivers East Pad on Production Starting J

  5. Slide 5: Coelacanth - Small Fish?

    Slide 5: Coelacanth - Small Fish?

    COELACANTH - SMALL FISH? At $437 million market cap, CEI is one of the smallest Montney players in the British Columbia pond BUT:  Top 10 in Montney landholdings  #1 landholder in the light oil window Halfway River FN Substantial multizonal Montney resource in place: 6.9 Bbbl Discovered Oil PIIP,

  6. Slide 6: Two Rivers Asset Advantage

    Slide 6: Two Rivers Asset Advantage

    TWO RIVERS ASSET ADVANTAGE Status Next Steps Sales Pipeline 10-08 Pad Productivity & Further Upper commerciality 30m Project 16-03 delineation Battery Montney proven Facility Emulsion Future potential, Obtain cores and Middle assess future Line no current wells 130m Montney drilling tested 325m 05-1

  7. Slide 7: CEI Pipelines to Markets

    Slide 7: CEI Pipelines to Markets

    CEI PIPELINES TO MARKETS CEI lands are directly connected to LNG Canada via Coastal Gaslink for potential future delivery. NRM Gathering Line NRM McMahon Plant, STN 1 CEI Westcoast Alliance NGTL Pembina CGL To AECO and TCPL Mainline STN 2 Westcoast to CGL Connection 7 7

  8. Slide 8: Two Rivers Montney Project – Status Report

    Slide 8: Two Rivers Montney Project – Status Report

    TWO RIVERS MONTNEY PROJECT – STATUS REPORT Where are we now? Completed In Process • Land secured (150 sections acquired) • Geological delineation (initial mapping and coring) • Proof of commerciality o Two Rivers East Pad tested o Two Rivers West Pad tested and on-stream • Infrastructure financing s

  9. Slide 9: Two Rivers East 5-19 Pad – Results Exceed Expectations

    Slide 9: Two Rivers East 5-19 Pad – Results Exceed Expectations

    TWO RIVERS EAST 5-19 PAD – RESULTS EXCEED EXPECTATIONS Initial Production Rates exceeded GLJ type curves* Original Discovery Well, 2017 6 additional wells expected to be on production before year-end 3 wells expected to be drilled and Q4 2025 drills completed prior to year-end, onstream Q1 2026 Test

  10. Slide 10: Management Historical Returns Versus Index

    Slide 10: Management Historical Returns Versus Index

    MANAGEMENT HISTORICAL RETURNS VERSUS INDEX Management has built and sold 6 prior entities. Graph below illustrates $1 dollar invested in Company #1 and the proceeds re-invested sequentially through Company #6*. The STENRS Index that includes Canadian large producers has also been illustrated for com

  11. Slide 11: Accelerated Growth with ESG Advantage

    Slide 11: Accelerated Growth with ESG Advantage

    ACCELERATED GROWTH WITH ESG ADVANTAGE Environment • New pad projects and infrastructure are ‘greenfield’ and built with ESG principles (use of instrument air, no retrofits needed) • Reduced surface footprint through use of multi-well pads • Reduced drilling and completions emissions through use of d

  12. Slide 12: Board of Directors

    Slide 12: Board of Directors

    BOARD OF DIRECTORS Board Member Principal Occupation President and a Director of GMT Exploration Company LLC ("GMT Exploration”). Prior thereto, Mr. Lancaster held position of Vice President Exploration William Lancaster, P. Geol. and Production at GMT Exploration. Mr. Lancaster is a former presiden

  13. Slide 13: Management Team

    Slide 13: Management Team

    MANAGEMENT TEAM MANAGEMENT TEAM EMPLOYMENT HISTORY Robert J. Zakresky, CA, Former President & CEO of Leucrotta Exploration Inc., Crocotta Energy Inc., Chamaelo Exploration Ltd., Chamaelo Energy Inc., Viracocha Energy Inc., President & CEO & Bellator Exploration Inc. Bret Kimpton, P. Eng., Former Vic

  14. Slide 14: Corporate Information

    Slide 14: Corporate Information

    CORPORATE INFORMATION Corporate Contact Info Analyst Service Coverage Providers Address Institution: Analyst Auditors • 2110, 530-8th Avenue • Acumen Capital: • KPMG LLP SW Trevor Reynolds Legal Calgary, AB T2P 3S8 • Gowling WLG (Canada) Telephone: (403) 705- • ATB Capital Markets: LLP 4525 Amir Ari

  15. Slide 15: Advisories

    Slide 15: Advisories

    ADVISORIES Forward Looking Information This document contains forward-looking statements and forward-looking information within the meaning of applicable securities laws. The use of any of the words “expect”, “anticipate”, “continue”, “estimate”, “may”, “will”, “should”, “believe”, “intends”, “forec

  16. Slide 16: Advisories, Cont'd

    Slide 16: Advisories, Cont'd

    ADVISORIES, CONT’D This production growth profile specifically contains expectations and assumptions relating to prevailing commodity prices and exchange rates, applicable royalty rates and tax laws, future well production rates, the success of drilling new wells, the availability of capital to unde

  17. Slide 17: Advisories, Cont'd

    Slide 17: Advisories, Cont'd

    ADVISORIES, CONT’D TEST RESULTS AND INITIAL PRODUCTION RATES, CONT’D The E5-19 Lower Montney well was production tested for 11.4 days and produced at an average rate of 312 bbl/d oil and 890 mcf/d gas (net of load fluid and energizing fluid) over that period which includes the initial cleanup where

  18. Slide 18: Advisories, Cont'd

    Slide 18: Advisories, Cont'd

    ADVISORIES, CONT’D RESOURCES DATA, CONT’D Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be commercial

  19. Slide 19: Thank you

    Slide 19: Thank you

    ESN Ag Thank you

Source: Internet Archive copy of coelacanth.ca

More decks from Coelacanth Energy, Inc.

All 9 Coelacanth Energy decks