Magnetite Mines Ltd. · ASX:MGT

Magnetite Mines — IMARC Conference 2024

19 slides from Magnetite Mines's conference presentation, Oct 29, 2024

  1. Slide 1: Premium Iron Ore ... for steel sector decarbonisation

    For personal use only Premium Iron Ore ... for steel sector decarbonisation IMARC Conference 29 October 2024

  2. Slide 2: Disclaimer

    Disclaimer For personal use only IMPORTANT NOTICE ADDITIONAL INFORMATION The purpose of this presentation is to provide general information about This presentation should be read in conjunction with MGT’s Annual Report at 30 Magnetite Mines Limited ("MGT"). It is not recommended that any person make

  3. Slide 3: Increasing global steel demand is a certainty

    Increasing global steel demand is a certainty Steel is also critical to tackling climate change For personal use only Steel is used in all aspects of the built environment Production has doubled every 20 years since 1950 … Source: World Steel Association … and more steel is necessary for energy tran

  4. Slide 4: Challenging steel decarbonisation targets have been set

    Challenging steel decarbonisation targets have been set Steel industry now committed and making transition investment decisions For personal use only Steel industry produces 8% of global carbon emissions Major steel producer carbon reduction targets Source: Company filings 1. by 2030 compared to 201

  5. Slide 5: The transition away from coal has commenced

    The transition away from coal has commenced Razorback to supply high-grade, low-impurity iron ore for replacement technologies For personal use only Coal-using blast furnaces replacement to EAFs has commenced and forecast to accelerate Iron ore grade required Feed Iron Reduction Melting Carbon emiss

  6. Slide 6: New premium-grade iron ore supply critical to transition

    New premium-grade iron ore supply critical to transition Razorback Project positioned to meet urgent new demand For personal use only Razorback >68% Fe concentrates positioned in DR-grade range* High-grade iron ore demand-supply gap to increase Exported Iron Ore – Fe Grade Comparison Australian Hema

  7. Slide 7: Australia is now recognising the green iron opportunity

    Australia is now recognising the green iron opportunity Realising the economic advantage of Australia’s world-leading renewables For personal use only The Malinauskas Labor Government will officially The Australian Government has identified green metals begin its search for partners to kickstart Sou

  8. Slide 8: The South Australia advantage

    The South Australia advantage SA is leading the way to a future green iron economy For personal use only Attracting international investment Value adding Australia’s opportunity can be realised through collaboration and investment in green iron hubs Magnetite + Renewable Energy + Green Hydrogen Tie

  9. Slide 9: Green Iron SA consortium formed

    Green Iron SA consortium formed Accelerating South Australia’s Green Iron opportunity For personal use only Green Iron SA plans to transform the strategic location of Port Pirie into a green iron production & export hub5  Development of the Razorback Iron Ore Project  Delivery of 5Mtpa – DR-Grade

  10. Slide 10: Razorback: Expansive, soft, outcropping iron ore

    Razorback: Expansive, soft, outcropping iron ore South Australia’s Braemar Iron Formation – a globally significant magnetite province For personal use only The Braemar advantage  Outcropping ore: very low strip ratio Iron Peak  Siltstone-hosted iron ore, not BIF*  Soft relative to WA magnetite or

  11. Slide 11: Outstanding project location in the undeveloped Braemar

    Outstanding project location in the undeveloped Braemar Close to potential future green iron hubs at Whyalla & Port Pirie For personal use only Adelaide 240km Open-access rail ~50km Whyalla Port 315km Port Pirie 180km Grid Power 100% renewable by 2027 1111 ~125km

  12. Slide 12: Positive Razorback Project Optimisation Study economics

    Positive Razorback Project Optimisation Study economics Results leading to larger scale production and staged expansion strategy For personal use only Staged development pathway manages risk Key project metrics 9 Expansion Physical Metrics Unit Base Case Option dry Concentrate production rate 5 10 M

  13. Slide 13: Razorback Project economics globally competitive

    Razorback Project economics globally competitive Highly-competitive cost base on a standardised basis For personal use only Wood Mackenzie 2027 VIU-adjusted (62% Fe eq.) cost curve (US$/t)a,b 1st quartile 2nd quartile 300 250 US$/t (real 2023$) 200 150 10Mtpa 5Mtpa 100 50 - 0% 5% 100% 10% 15% 20% 25

  14. Slide 14: Razorback Project financing approach

    Razorback Project financing approach Joint venture with motivated offtakers For personal use only UNINCORPORATED JOINT VENTURE (JV) JV PARTNER 1 Joint Ventures (JV) Potential partners $  World-class asset has attracted  Well-proven model for big Australian iron ore projects over global steel indus

  15. Slide 15: Corporate overview

    Corporate overview (ASX:MGT) Recent corporate transformation in readiness to develop project For personal use only Board Management Market Cap Paul White Chair of the Board Tim Dobson Managing Director MBA, MAICD $21M BAppSc (Ext.Metallurgy), GAICD, FAusIMM  Background of driving organisational per

  16. Slide 16: Magnetite Mines

    Magnetite Mines For personal use only Decarbonisation Outstanding Project Progressing to Substantial re-rating Tailwind Credentials Development potential  Premium-grade iron ore  Tier 1 location  Partnering in progress  Project set for long life needed now to enable  Close to port & rail  Expe

  17. Slide 17: References

    For personal use only References 1. World Steel Association – 18/05/2023 – World Steel in figures 2023 2. Metalmorphosis: How decarbonisation is transforming the iron and steel industry | Wood Mackenzie 3. https://www.premier.sa.gov.au/media-releases/news-items/global-call-to-arms-for-sas-push-to-de

  18. Slide 18: Contact

    For personal use only Contact gemma.brosnan@magnetitemines.com +61 8 8427 0516 www.magnetitemines.com 18

  19. Slide 19: Appendix: Mineral Resources and Reserves

    Appendix 1 Mineral Resources and Reserves1,3 For personal use only Razorback Iron Ore Project (Razorback & Iron Peak deposits combined)a Classification Tonnes (Mt) Mass Rec % Fe % SiO2 % Al2O3 % P% LOI % Magnetite % Indicated 1,675 15.95 18.36 48.02 8.06 0.18 5.46 15 Inferred 1,570 16.09 17.74 48.6