Slide 1: Developing a World-Class Titanium Project
Supplying the Future Developing a World-Class Titanium Project A Massive High-purity TiO 2 Deposit in Western Australia Corporate Presentation – Q2 2026 LON : EEE OTCQX : EPMLF
Slide 2: Disclaimer and Statements
Disclaimer and Statements This presentation (“Presentation”) has been prepared by Empire Metals Limited Competent Persons Statement (“Empire” or the “Company”) for information purposes only and may be subject to material updates, revision and further amendment. This Presentation does not The technic
Slide 3: A Once-in-a-Generation Titanium Opportunity
A Once-in-a-Generation Titanium Opportunity Globally Significant Tier-1 Western Australia Jurisdiction Western Mineral Resource Estimate 1 Established mining and infrastructure hub with export access Australia 2.2Bt at 5.1% TiO 2 Politically stable, strong government support, for 113Mt contained TiO
Slide 4: Titanium is a Strategic Commodity Powering Critical Industries
Titanium is classified as a Critical Mineral by the U.S., EU, Titanium is a Strategic Commodity UK, Canada, South Korea, Australia, and Japan Powering Critical Industries Aerospace & Defense • Aircraft engines & landing gear • Missiles • Armoured vehicles & submarines • Critical Metal needed now and
Slide 5: Low Cost, Sustainable Premium Titanium is in Short Supply
Titanium demand is growing, while the industry Low Cost, Sustainable needs production from a new source* Premium Titanium 1200 0 is in Short Supply 100 00 '000 Tonnes TiO2 800 0 600 0 $20B Market Size in 2025* (USD) 3.4% CAGR from 2025-2030* 40 00 200 0 Pigment 0 Sponge 202 3 202 4 202 5 202 6 202 7
Slide 6: Tier-1 Jurisdiction of Western Australia
Tier-1 Jurisdiction of Western Australia De-risked development in a proven mining region with direct access to port, power and transport → Mid-West region is a mining and agricultural hub – offering skilled labour services and clear permitting pathway → Export ready location - 320 km from Perth and
Slide 7: One of the Largest & Highest-Grade Titanium Resources Reported Globally
One of the Largest Exceptional Drill Results & Highest-Grade Titanium informed the MRE 44m at 7.87% TiO2 Resources Reported Globally1 from surface [AC25TOM159] 98m at 7.05% TiO2 A giant high-grade titanium deposit with exceptional continuity from 2m depth [RC25TOM062] 148m at 6.49% TiO2 from surface
Slide 8: High-Value In-Situ Weathered Cap
High-Value In-Situ Weathered Cap High-purity titanium dioxide minerals at surface MRE* contains an in-situ weathered zone of 1.3Bt at 5.2% TiO 2 containing 66Mt TiO 2 → Highest TiO2 grades within in-situ weathered cap, 40-60m deep from surface, containing primary anatase and rutile → Anatase and rut
Slide 9: Most Titanium Starts as Low-Grade Ore and Requires Costly, Polluting Processes. Not Ours.
Most Titanium Starts as Low-Grade Ore and Requires Costly, Polluting Processes. Not Ours. Pitfield offers a better alternative for direct high-purity titanium supply to the market ✓ High-Purity Ore, ✓ Minimal waste, High Purity 99.25% lower CO2 TiO 2 Product ✓ Higher continuous ✓ Multi-generational
Slide 10: +99% TiO2 Product Achieved
Rapid Product Development Success: +99% TiO2 Product Achieved Advancement of a pathway to a high-value commercial product based on conventional metallurgical processing steps Reviewing data from the SEM at the AMI laboratory in Perth → High-purity final product achieved: TiO2 grading 99.25% with neg
Slide 11: Processing – Mine to Final Product
Processing – Mine to Final Product An efficient and simplified pathway to a high-purity titanium dioxide product → Low-Energy Processing Scrubbing and desliming take advantage of Pitfield's friable, in-situ weathered saprolite and sandstone, reducing energy costs → Conventional Separation Methods Gr
Slide 12: Catalysts Over Next 12 Months
Catalysts Over Next 12 Months 2026 Work Program Value-Added Project Advancement z De-Risking for Development Active 41,250m drill program with MRE infill drilling at Thomas and Industry engagement Cosgrove (H1 2026) for pigment and sponge markets Active exploration drill program to explore for exten
Slide 13: Capital Structure
Capital Structure → Constituent of the AIM 100 Index → OTCQX-quoted → Raised £7m in Oct '25 Ticker LON:EEE OTCQX:EPMLF from institutional shareholders → Planning ASX dual listing in 2026 Market Cap* £213M $282M USD Share Price* 30.00p $0.39 USD Major Shareholders Shares on Issue 710,893,221 710,893,
Slide 14: Board and Senior Management
Board and Senior Management Focused on execution and value creation Neil O’Brien Non-Executive Chairman Phil Brumit Non-Executive Director Former SVP Exploration & New Business Development Mining engineer and operations expert, delivering at Lundin Mining (Retired 2018). Extensive global major globa
Slide 15: Technical Excellence
Technical Excellence An exceptional technical team in Perth, WA Process Andrew Faragher Exploration Manager Narelle Marriott Development Manager Former Rio Tinto Exploration Manager with Former BHP Snr Process Engineer and recently over 25 years’ experience working across General Manager Process Dev
Slide 16: Empire Metals: The Next Generation for Titanium
Empire Metals: The Next Generation for Titanium Pitfield is exceptional and capable of meeting future Giant scale, long life growth in world demand over a multi-generational timeline Titanium metal and high-purity TiO2 feedstocks High-value high-purity attract premium pricing – high demand, end prod
Slide 17: Disclaimer
Disclaimer Continued from Page 2 This Presentation has not been approved by any authorised person pursuant to Section 21(2)(b) of the Financial Services and Markets Act This Presentation contains confidential information regarding the 2000 ("FSMA") and is therefore being issued for information purpo
Slide 18: Appendix: Pitfield Project Mineral Resource Statement
Appendix: Pitfield Project Mineral Resource Statement Effective October 2025 Indicated Inferred Total Mineral Resource Cut-Off Tonnes Grade Tonnes Tonnes Grade Tonnes Tonnes Grade TiO2 Tonnes Material Type TiO2 (%) (Mt) (%) (kt) (Mt) (%) (kt) (Mt) (%) (kt) Thomas Deposit, Pitfield Laterite 33 3.0 1,
Slide 19: info@empiremetals.com
info@empiremetals.com London: 6 Heddon Street, London W1B 4BT, UK Perth: 506A Hay Street, Subiaco WA 6008, Australia +44 (0) 20 4583 1440 www.empiremetals.com LON : EEE OTCQX : EPMLF