Regis Resources Limited · ASX:RRL

Regis Resources — Q2 FY2018 Earnings Presentation

24 slides from Regis Resources's earnings presentation, Jan 30, 2018

  1. Slide 1: Regis Resources December 2017 Quarterly Report & Exploration Update

    For personal use only 1 1 REGIS RESOURCES LTD DECEMBER 2017 QUARTERLY REPORT & EXPLORATION UPDATE

  2. Slide 2: Disclaimer & Competent Persons Statement

    DISCLAIMER & COMPETENT PERSONS 22 STATEMENT For personal use only This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to

  3. Slide 3: Review of FY2018 Q2 Operations

    REVIEW OF FY2018 Q2 OPERATIONS For personal use only 3 3 DUKETON CONTINUES TO DELIVER STRONG CASHFLOW Q2 Q1 OPERATIONS FY18 FY18  Q2 gold production 92,113 ounces, a Regis record Ore mined (Mbcm) 1.3 1.4  Consistent with Q1 (91,921 oz)  Run rate at top end of FY18 guidance of 335-365koz Waste min

  4. Slide 4: Duketon

    For personal use only DUKETON 4 4

  5. Slide 5: FY2018 Q2 Operating Results

    FY2018 Q2 OPERATING RESULTS For personal use only 5 5 Duketon Northern Duketon Southern Operations Operations Total Q2 Q1 Q2 Q1 Q2 Q1 Ore mined (Mbcm ) 0.6 0.6 0.7 0.8 1.3 1.4 Waste mined (Mbcm) 1.2 1.2 2.9 3.9 4.2 5.1 Stripping ratio (w:o) 2.2 2.2 4.3 4.5 3.3 3.6 Ore mined (Mtonnes) 1.0 1.0 1.8 2.2

  6. Slide 6: FY2018 Q2 Operating Results – Duketon Northern Operations

    FY2018 Q2 OPERATING RESULTS For personal use only 6 6 Duketon Northern Duketon Southern Operations Operations Total Q2 Q1 Q2 Q1 Q2 Q1 Ore mined (Mbcm ) 0.6 0.6 0.7 0.8 1.3 1.4 Waste mined (Mbcm) 1.2 1.2 2.9 3.9 4.2 5.1 Stripping ratio (w:o) 2.2 2.2 4.3 4.5 3.3 3.6 Ore mined (Mtonnes) 1.0 1.0 1.8 2.2

  7. Slide 7: FY2018 Q2 Operating Results – Duketon Southern Operations

    FY2018 Q2 OPERATING RESULTS For personal use only 7 7 Duketon Northern Duketon Southern Operations Operations Total Q2 Q1 Q2 Q1 Q2 Q1 Ore mined (Mbcm ) 0.6 0.6 0.7 0.8 1.3 1.4 Waste mined (Mbcm) 1.2 1.2 2.9 3.9 4.2 5.1 Stripping ratio (w:o) 2.2 2.2 4.3 4.5 3.3 3.6 Ore mined (Mtonnes) 1.0 1.0 1.8 2.2

  8. Slide 8: Cashflow Waterfall

    8 CASHFLOW WATERFALL 8 For personal use only $230.0m Cash & Gold on Hand - Q2 Movements $83.8m $210.0m ($11.2m) $190.0m ($9.2m) $172.0 ($8.4m) $170.0m ($11.7m) ($2.7m) $150.0m $131.3m $130.0m $110.0m $90.0m $70.0m $50.0m Record quarterly cash-flow from operations of $83.8m (Q1: $62.9m)  Higher deli

  9. Slide 9: Exploration Update – Duketon Significant Results in Q2

    9 EXPLORATION UPDATE 9 For personal use only DUKETON - SIGNIFICANT RESULTS IN Q2 Drilled 62,210m (Q1: 48,806m) on 17 gold projects  Rosemont Underground  6 DD holes drilled at RMT South  19 RC & DD holes at RMT Main  Strong results & confirming geometry  Maiden u/g resource pending  Baneygo sa

  10. Slide 10: Rosemont South & Main Underground Opportunities

    ROSEMONT SOUTH & MAIN 10 10 UNDERGROUND OPPORTUNITIES For personal use only 3D long section from south east showing planned Rosemont South & Main drilling, phase 1 and 2 Phase 1 drill programmes underway at Rosemont South and below Rosemont Main Pit:  Returning numerous high grade intercepts  Dril

  11. Slide 11: Rosemont Underground Project – Main Pit

    ROSEMONT UNDERGROUND 11 11 PROJECT – MAIN PIT For personal use only POTENTIAL FOR UNDERGROUND MINING INVENTORY EXTENSION  Testing high grade shoots 100-200m vertically below ultimate open pit design depth  Holes drilled to date are encouraging for underground opportunities  RMT Main & South - 25

  12. Slide 12: Rosemont Underground Project – South Pit

    ROSEMONT UNDERGROUND 12 12 PROJECT – SOUTH PIT For personal use only POTENTIAL FOR UNDERGROUND MINING INVENTORY EXTENSION  Testing high grade shoots 100-200m vertically below ultimate open pit design depth  Holes drilled to date are encouraging for underground opportunities  RMT Main & South - 25

  13. Slide 13: Rosemont Underground Project – Main Pit Drill Results in Q2

    ROSEMONT UNDERGROUND 1313 PROJECT – MAIN PIT DRILL RESULTS IN Q2 For personal use only  Gold hosted in a steeply east dipping 345° trending quartz-dolerite unit  Gold mineralised quartz-dolerite unit is up to 80m wide.  Q2 drilling 19 DD & RC holes for 4,423m  Q2 Results (all outside reserves):

  14. Slide 14: Rosemont Underground Project – South Pit Drill Results in Q2

    ROSEMONT UNDERGROUND 14 14 PROJECT – SOUTH PIT DRILL RESULTS IN Q2 For personal use only  Gold hosted in a steeply east dipping 345° trending quartz-dolerite unit  Gold mineralised quartz-dolerite unit is up to 80m wide.  Q2 drilling 6 DD holes for 1,648m  Q2 Results (all outside reserves):  5.

  15. Slide 15: Garden Well Underground Project

    GARDEN WELL 15 15 UNDERGROUND PROJECT For personal use only TARGETING HIGH GRADE ZONE BELOW GARDEN WELL PIT  Very significant underground target below southern end of GW open pit  Zone of continuous mineralisation 4-10m true widths & 300m N-S strike  100 – 300m below surface, dipping east and ope

  16. Slide 16: Garden Well Underground Project – Significant Underground Target

    GARDEN WELL 16 16 UNDERGROUND PROJECT For personal use only SIGNIFICANT UNDERGROUND TARGET  Two sections 6911600mN & 6911680mN  Regis earlier drill results below pit in southern area include:  19.6m @ 9.47g/t Au from 318m  19m @ 6.38g/t Au from 131m  12m @ 9.52g/t Au from 179m  5m @ 22.48g/t A

  17. Slide 17: Garden Well Underground Project – Significant Underground Target

    GARDEN WELL 17 17 UNDERGROUND PROJECT For personal use only SIGNIFICANT UNDERGROUND TARGET  Two sections 6911600mN & 6911680mN  Regis earlier drill results below pit in southern area include:  19.6m @ 9.47g/t Au from 318m  19m @ 6.38g/t Au from 131m  12m @ 9.52g/t Au from 179m  5m @ 22.48g/t A

  18. Slide 18: McPhillamys (NSW) Organic Growth Project

    18 McPHILLAMYS (NSW) 18 For personal use only ORGANIC GROWTH PROJECT  Located in Central-West NSW  Well established gold mining district  Cadia, Cowal, Northparkes +45Moz*  Gold resource 2.31Moz  Gold reserve 2.03 Moz  One of Australia’s larger undeveloped open pit opportunities  PFS complete

  19. Slide 19: McPhillamys Infill and Extensional Drilling

    19 McPHILLAMYS 19 For personal use only INFILL AND EXTENSIONAL DRILLING 8 diamond holes (3,953m) were drilling during the quarter:  Infill of deeper parts of reserve model  Add drilling data beyond current pit design Significant results included:  134m @ 1.24g/t Au from 399m  143m @ 1.14g/t Au f

  20. Slide 20: McPhillamys EIS and DFS Update

    20 McPHILLAMYS 20 For personal use only EIS AND DFS UPDATE EIS – work continuing with most areas nearing completion Draft PEA submitted to regulators for review during quarter:  Allowed meetings with key regulators involved in assessment of project  Formal submission targeted for Q3 – triggers DPE

  21. Slide 21: McPhillamys Discovery Ridge Expected to Deliver Significant Value

    21 McPHILLAMYS 21 For personal use only DISCOVERY RIDGE EXPECTED TO DELIVER SIGNIFICANT VALUE TO MGP  100% owned Discovery Ridge deposit located 32km away from McPhillamys by major highway  MRE of 13.84Mt @ 1.1g/t for 501koz*  Completed 1,930m of a 6,000m RC infill drilling programme in Q2 for ma

  22. Slide 22: Recap of Presentation

    RECAP OF PRESENTATION For personal use only 22 22  Q2 gold production an all time Regis record of 92,113 ounces at AISC of A$855/oz  Production in line with Q1 (91,921oz) and run rate at top of FY18 guidance  Q2 AISC below bottom of guidance range  Record H1 production of 184,034 ounces at AISC

  23. Slide 23: Appendix: JORC Compliant Ore Reserve Estimates March 2017

    APPENDIX 1 JORC COMPLIANT 23 23 ORE RESERVE ESTIMATES 31 MARCH 2017 For personal use only Gold Proved Probable Total Ore Reserve Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Type Person3 (g/t)2 (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt)

  24. Slide 24: Appendix: JORC Compliant Mineral Resources March 2017

    APPENDIX 2 24 24 JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2017 For personal use only Gold Measured Indicated Inferred Total Resource Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Type Person2 (g/t) (Mt)

Regis Resources — Q2 FY2018 Earnings Presentation on 6ix