  1. Slide 1: April 11, 2018

    heel IVANHOEMINES N E—E W HORIZON S

  2. Slide 2: Forward-looking statements & Qualified Person

    Forward-looking statements & Qualified Person Certain statements in presentation constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including, without limitation, the timing and results of: (i) statements regarding the ongoing d

  3. Slide 3: Building futures for our stakeholders, today, and writing new stories

    Building futures for our stakeholders, today, and writing new stories KAMOA-KAKULA of epic discoveries Copper discoveries in Southern Africa’s & mine development Democratic Republic legendary mineral fields of Congo’s Central African Copperbelt KIPUSHI PLATREEF Zinc, copper, silver Platinum-group el

  4. Slide 4: Appointment of Kgalema Motlanthe as non-executive director

    April 10, 2018: Appointment of former South African President Kgalema Motlanthe as non-executive director “Mr. Motlanthe is widely recognized as one of the African continent’s wise men. We are honoured to be able to welcome to our board an individual with such respected credentials in the internatio

  5. Slide 5: Platreef Discovery & Mine Development

    Platreef Discovery & Mine Development South Africa

  6. Slide 6: Shaft 1 has reached a depth of more than 70% of plan

    April 8, 2018: Shaft 1 has reached a depth of more than 730 metres below surface, more than 70% to the planned final depth of 980 metres, at Ivanhoe’s Platreef platinum, palladium, rhodium, nickel, copper, and gold mine. Development work focused on initial production by early 2022. 6

  7. Slide 7: Box-cut construction of Shaft 2

    Box-cut construction of Shaft 2 7

  8. Slide 8: Definitive feasibility study issued for Platreef Project

    July 31, 2017: Definitive feasibility study issued for Platreef Project  First phase envisages annual throughput rate of 4Mtpa, producing 476,000 ounces of platinum, palladium, rhodium and gold, plus 33 million pounds of nickel and copper.  Projected to be Africa’s lowest-cost producer of PGMs, wi

  9. Slide 9: Platreef's potential cash cost at the bottom of the cost curve

    Platreef’s potential US$351 per 3PE+Au ounce (net of base-metal by-products) at the bottom of the world’s cash-cost curve 1,600 1,400 1,200 Ivanhoe’s Platreef Project 1,000 at the bottom of the cash-cost curve. 800 600 400 200 0 4E oz production Platreef 4Mtpa FS Northern limb Zimbabwe Eastern Limb

  10. Slide 10: Platreef will be world's largest platinum-group metals mine

    At 12 million tonnes/year, Platreef will be world’s largest platinum-group metals mine 1,400 Platreef Phase 3 (12 Mtpa) Ni + Cu + Cr production (eq. Pt oz) 1,200 Ir + Ru production (eq. Pt oz) 1,000 Platreef Phase 2 (8 Mtpa) 4E production (eq. Pt oz) 800 Platreef Phase 1 (4 Mtpa) 600 400 200 - Ruste

  11. Slide 11: Platreef Project Financing Progressing

    Platreef Project Financing Progressing: German, Swedish and Canadian government institutions appointed to arrange debt financing for Platreef. Expressions of interest received for approximately US$900 million of a US$1 billion finance package. 11

  12. Slide 12: Shaft 2 concrete headgear illustration

    Illustration shows two perspectives of Shaft 2’s 103-metre- tall concrete headgear and internal permanent hoisting facilities. 12

  13. Slide 13: Ivanhoe's Shaft 2 vs. Impala's Shaft 16

    Ivanhoe’s Shaft 2 vs. Impala’s Shaft 16 Conceptual Purpose Production shaft Production shaft Northern Limb of Bushveld Western Limb of Bushveld Location Complex Complex Total depth Approx. 1,100 metres 1,657 metres Diameter 10 metres 10 metres Hoisting capacity 6 million tonnes/year 2.7 million tonn

  14. Slide 14: Platreef's B-BBEE deal is a top performer

    Platreef’s B-BBEE deal is a top performer in South Africa’s platinum sector BEE partner’s 26% ownership stake in Platreef Project is one of the broadest empowerment transactions ever done in South African mining. • 20% held by a trust to benefit 20 local host communities, with estimated combined pop

  15. Slide 15: Ongoing Shaft 1 development by shaft-sinking team

    Ongoing Shaft 1 development by members of Platreef’s shaft-sinking team Shaft 1 is expected to reach its projected, final depth of 980 metres below surface in 2019 15

  16. Slide 16: Removal of broken rock from shaft-sinking development

    Removal of broken rock from shaft-sinking development 16

  17. Slide 17: Flatreef mining method: long-hole stoping

    Flatreef mining method: long-hole stoping Highly mechanized Safe working mining conditions Blast-hole drifts 5m 5m The Flatreef Deposit average thickness of 24 metres = 8 storeys Mucking drifts Highly skilled operators 17

  18. Slide 18: The future of underground mining is automation

    The future of underground mining is automation Ivanhoe’s Platreef Platinum Project in South Africa is ideally suited for mechanized, autonomous mining. Source: ASI Robots Illustration source: ABB Mining. Source: MINEX Forum 18

  19. Slide 19: The looming platinum supply cliff

    The looming platinum “supply cliff” for Southern Africa’s existing producing mines (’000 oz.) Southern Africa’s projected platinum production plunge PwC, Sept. 2016  Existing shafts alone will barely maintain current production to 2021.  Then, closures of mined-out shafts will help trigger a long

  20. Slide 20: New production likely to provide only short-lived lift in platinum output

    Even new production now under development likely to provide only short-lived lift in platinum output (’000 oz.) Southern Africa’s projected platinum production plunge 2022: EXPECTED START OF INITIAL PRODUCTION FROM IVANHOE’S PLATREEF PROJECT PwC  Ivanhoe’s Platreef is among new projects whose ramp-

  21. Slide 21: Kamoa Mine Development & Kakula Discovery

    Kamoa Mine Development & Kakula Discovery Democratic Republic of Congo

  22. Slide 22: Kamoa, Kakula and Kakula West

    Kamoa, Kakula and Kakula West Indicated and Inferred Mineral Resource areas, with existing power and rail infrastructure 22

  23. Slide 23: New resource estimate: world's fourth largest copper discovery

    February 2018: A new resource estimate establishes Kamoa-Kakula as the world’s fourth largest copper discovery. Copper grades at the two adjacent deposits are the highest, by a wide margin, of the world’s top 10 copper deposits. 23

  24. Slide 24: Indicated Mineral Resources, Kamoa-Kakula Project, February 2018

    Indicated Mineral Resources, Kamoa-Kakula Project, February 2018 Cut-off Contained Contained Tonnes Area Copper Category Grade Copper Copper (millions) (Sq. km) Grade (Cu%) (kTonnes) (billion lbs) Indicated 3.0 396 33.2 4.79% 19,000 41.8 Indicated 2.5 535 44.0 4.25% 22,800 50.2 Indicated 2.0 780 53.

  25. Slide 25: Kamoa-Kakula has the highest copper grades among largest deposits

    Among the world’s largest copper deposits, Kamoa-Kakula also has the highest copper grades Measured & Indicated Resource and Grade Inferred Resource and Grade 150 3.0% Contained Copper (Mt) 125 2.5% Copper Grade (%) 100 2.0% 75 1.5% 50 1.0% 25 0.5% - - Source: Wood Mackenzie *Note: Selected based on

  26. Slide 26: Largest undeveloped copper deposit in the world

    Kamoa-Kakula is the largest undeveloped copper deposit in the world Measured & Indicated Resource and Grade Inferred Resource and Grade 45 3.0% 40 Contained Copper (Mt) 2.5% Copper Grade (%) 35 30 2.0% 25 1.5% 20 15 1.0% 10 0.5% 5 - - Source: Wood Mackenzie *Note: Contained copper in undeveloped dep

  27. Slide 27: Largest high-grade copper deposit in the world

    Kamoa-Kakula is the largest high-grade copper deposit in the world 45 Measured & Indicated Resource Inferred Resource 40 5.9 Contained Copper (Mt) 35 30 25 11.7 20 36.6 15 6.4 10 16.9 4.8 0.0 0.4 5 10.2 0.4 0.1 0.0 0.0 0.3 4.6 1.4 0.9 0.7 0.5 0.3 0.4 0.3 - Source: Wood Mackenzie *Note: Contained cop

  28. Slide 28: Largest copper discovery ever made on the African continent

    Kamoa-Kakula is the largest copper discovery ever made on the African continent Measured & Indicated Resource Inferred Resource Historical Production 45 40 Contained Copper (Mt) 35 30 25 20 15 10 5 - Source: Wood Mackenzie and USGS 28

  29. Slide 29: Extent of Kakula / Kakula West Discovery

    Extent of Kakula / Kakula West Discovery Kakula West discovery extends known mineralization to more than 13 km, and remains open. 29

  30. Slide 30: Kakula and Kakula West grades at 3% copper cut-off

    Kakula and Kakula West discovery areas showing grades of Indicated and Inferred Mineral Resource blocks at a 3% copper cut-off 30

  31. Slide 31: Kakula and Kakula West grade at 1% copper cut-off

    Kakula and Kakula West discovery areas showing grade of Indicated and Inferred Mineral Resource blocks at a 1% copper cut-off 31

  32. Slide 32: Kakula and Kakula West thickness at 1% copper cut-off

    Kakula and Kakula West discovery areas showing the thickness of Indicated and Inferred Mineral Resource blocks at a 1% copper cut-off 32

  33. Slide 33: Expansion of Mineral Resources since May 2017

    Kakula and Kakula West discovery areas showing expansion of Indicated and Inferred Mineral Resources since May 2017 33

  34. Slide 34: Development options: up to six-million-tonne-per-year mines

    Development options: Up to six-million- tonne-per-year mines! That’s 18 million tonnes per year! 1. Kakula Mine − being fast tracked to production with capacity of 6 Mtpa. 2. Kansoko Mine − development ready, also with capacity of 6 Mtpa. Kakula’s 3. Kakula West and Kamoa underground North – potenti

  35. Slide 35: Underground declines advanced almost 400 metres toward mineralized zone

    Underground development has advanced each of the service and conveyor declines almost 400 metres toward the mineralized zone 35

  36. Slide 36: Kamoa-Kakula PEA long-term development plan

    Kamoa-Kakula PEA long-term development plan Source: OreWin 2017 36

  37. Slide 37: Top 20 producing mines by paid copper production

    2025 Top 20 producing mines by paid copper production Note: Kamoa-Kakula production based on projected peak copper production (which occurs in year nine) of the 12 Mtpa development plan for the Kamoa-Kakula Project as detailed in the Kakula 2017 PEA. Source: Wood Mackenzie (based on public disclosur

  38. Slide 38: Top 10 largest new greenfield projects

    Top 10 largest new greenfield projects (Nominal production and head grade) First ten years average grade 400 7.0% 350 6.0% 300 5.0% 250 4.0% 200 3.0% 150 100 2.0% 50 1.0% -- -- Nominal Production (kt/a) Copper Resource Grade (%Cu) Note: Top 10 largest new greenfield copper projects defined as the 10

  39. Slide 39: Drilling at the Kakula West Copper Discovery

    Drilling at the Kakula West Copper Discovery 39

  40. Slide 40: Excellent visual drill intercepts continue at Kakula West

    Excellent visual drill intercepts continue to be returned at Kakula West 40

  41. Slide 41: Poultry project supplying Kamoa-Kakula Sustainable Livelihoods Project

    The poultry project that supplies chickens and eggs to the Kamoa-Kakula Project – one of the initiatives of the Kamoa-Kakula Sustainable Livelihoods Project 41

  42. Slide 42: Lettuce harvested from the livelihoods garden

    Lettuce being harvested from the livelihoods garden – one of the initiatives of the Kamoa-Kakula Sustainable Livelihoods Project 42

  43. Slide 43: Mwadingusha hydroelectric power station

    Mwadingusha hydroelectric power station  Mwadingusha is the first of three hydroelectric power plants in the DRC that Ivanhoe and Zijin will upgrade to secure a supply of clean, sustainable electricity for the development of Kamoa-Kakula.  Mwadingusha is now supplying 32 megawatts (MW) of electric

  44. Slide 44: 120kV power line at the Kamoa-Kakula Project

    120kV power line at the Kamoa-Kakula Project 44

  45. Slide 45: Kipushi Mine Exploration and Upgrading

    Kipushi Mine Exploration and Upgrading Democratic Republic of Congo

  46. Slide 46: Kipushi Fault Zone and Big Zinc

     Kipushi Fault Zone was mined 1924-1993 to approx. 1,150-metre level.  Big Zinc discovered prior to 1993 closure; never mined. 46

  47. Slide 47: Planned and existing development at Kipushi

    Planned and existing development at Kipushi 47

  48. Slide 48: Pre-feasibility study for the rebirth of Kipushi mine

    December 13, 2017: Ivanhoe announced a pre-feasibility study for the rebirth of the historic Kipushi zinc-copper-silver-germanium mine The planned return to production would establish Kipushi as the world’s highest-grade major zinc mine 48

  49. Slide 49: MOU with SNCC to rebuild Kipushi-Munama spur line

    October 30, 2017: D.R. CONGO Ivanhoe signed an MOU with DRC’s state-owned KIPUSHI MINE railway company, Société Nationale des Chemins de Fer du ZAMBIA Congo (SNCC) Kipushi to Munama National to rebuild the Kipushi- railway 34 km spur line (SNCC) Munama spur line, which has been inactive since 2011.

  50. Slide 50: Some human health benefits from zinc

    Some human health benefits from zinc Zinc stopped cancer-cell growth in tests; research pursuing potential to block esophageal tumour cells. Oct. 3, 2017 Zinc lozenges may help colds go away 3 times faster. May 16, 2017 Shortage of zinc in the body can affect cardiovascular health. April 18, 2017 50

  51. Slide 51: Upgraded 1,150-metre-level ore conveyor belt at Kipushi

    Upgraded 1,150-metre-level ore conveyor belt at the historic, high-grade Kipushi zinc-copper- lead-germanium mine 51

  52. Slide 52: Control room operator at Kipushi's Shaft 5

    Control room operator at Kipushi’s Shaft 5 52

  53. Slide 53: New underground mining equipment fleet

    A scooptram loader and haul truck, part of the fleet of new underground mining equipment 53

  54. Slide 54: Know for Sure malaria testing initiative

    Sponsored by Ivanhoe Mines and Zijin Mining, in collaboration with Fio Corporation, of Toronto, and the DRC Ministry of Health, Know for Sure has equipped 252 health facilities with Deki Readers and trained more than 600 healthcare workers to effectively utilize the technology 54

  55. Slide 55: Putting people first

    Putting people first A representative of the Know for Sure initiative, holding a Deki Reader used to conduct rapid diagnostic testing for malaria, explains to children how to get access to testing for themselves and their parents. 55

  56. Slide 56: Final upgrading work on Kipushi's underground ore-conveyor system

    Final upgrading work on Kipushi’s new, underground ore-conveyor system 56

  57. Slide 57: Thank you.

    Thank you. IVANHOEMINES NEW HORIZONS