Allied Critical Metals Inc. · CSE:ACM

Allied Critical Metals — Investor Presentation (July 2024)

15 slides from Allied Critical Metals's investor presentation, July 2024

  1. Slide 1: Allied Critical Metals Corp. – Borralha and Vila Verde Tungsten Projects

    July 2024 ALLIED CRITICAL METALS CORP. Borralha and Vila Verde Tungsten Projects NEAR-TERM, LOW-COST PORTUGUESE TUNGSTEN PRODUCTION WITH SIGNIFICANT RESOURCE UPSIDE POTENTIAL CSE: ACM* * PENDING APPLICATION

  2. Slide 2: Disclaimer - Forward Looking Statements

    ALLIED CRITICAL METALS CORP. DISCLAIMER - FORWARD LOOKING STATEMENTS • This presentation contains “forward-looking information”. Forward-looking information includes, without CAUTIONARY NOTE REGARDING FUTURE-ORIENTED FINANCIAL INFORMATION limitation, statements regarding macroeconomic factors, futur

  3. Slide 3: Military Metal & Critical Mineral: Tungsten

    ALLIED CRITICAL METALS CORP. MILITARY METAL & CRITICAL MINERAL: TUNGSTEN • Demand & growth driven by uses: Military; EVs; and Semiconductors/AI. • Tungsten (W), also known as wolfram, is a military metals due to its key important military uses in armour, shells, missile and bullets. The US Departmen

  4. Slide 4: Tungsten Prices & Demand

    ALLIED CRITICAL METALS CORP. TUNGSTEN PRICES & DEMAND • Estimated Global Market - $10 Billion USD by 2025. • U.S. demand consistently growing driven by increased demand for military material, EVs, semiconductors, clean energy and manufacturing equipment. • Tungsten prices are presently ~$348 USD per

  5. Slide 5: Investment Highlights

    ALLIED CRITICAL METALS CORP. INVESTMENT HIGHLIGHTS • Focused on two historical Tungsten mining projects – Borralha and Vila Verde both located in mining-friendly northern Portugal. Well positioned for near-term production. • Excellent infrastructure – roads, electricity, water and access to skilled

  6. Slide 6: Borralha Tungsten Project

    ALLIED CRITICAL METALS CORP. BORRALHA TUNGSTEN PROJECT • Brownfield project with past production and past production at northern side of the Borralha property from 1904-1985 of over 10,280 tonnes of concentrate with an average grade of 66% WO3. • Historical Drilling: • 13 drill holes totalling • 1,9

  7. Slide 7: Borralha Tungsten Project – Updated Resource March 2024

    ALLIED CRITICAL METALS CORP. BORRALHA TUNGSTEN PROJECT Updated Resource – March 2024 The following table is a summary of the above tables illustrating the sensitivity of the mineral resources at different WO3 cut-off grades. Using a cut-off grade of 0.10% WO3, the Indicated mineral resources have be

  8. Slide 8: Borralha Tungsten Project – Historical Drilling

    ALLIED CRITICAL METALS CORP. BORRALHA TUNGSTEN PROJECT Historical Drilling (2013-2017) – 13 Drill Holes / ~1,918m

  9. Slide 9: Vila Verde Tungsten-Tin Project

    ALLIED CRITICAL METALS CORP. VILA VERDE TUNGTEN-TIN PROJECT • Vila Verde is 45km southeast of Borralha Tungsten Project. • Brownfield site comprised of several old mining workings, including the Valedas Gatas Mine, which was the third largest mine in Portugal until its closure in 1986 • Historical D

  10. Slide 10: Tungsten Concentrate Pilot Plant

    ALLIED CRITICAL METALS CORP. Tungsten Concentrate Pilot Plant VILA VERDE • Tailings and waste rock will supply plant with estimated grade for plant design - 0.21% WO3 • Plant construction & commissioning – Q4 2024 • Production Capacity – 150,000 tonnes per year, which would result in 240 tonnes of W

  11. Slide 11: Timeline of Milestones

    ALLIED CRITICAL METALS CORP. TIMELINE OF MILESTONES Q4 2024 Negotiate further Q4 2024 Q2 2024 Q3 2024 offtake agreements. Commence Acquired 100% interest in Q4 ’24/Q1 ‘25 Expected completion of Production Borralha & Vila Verde. Complete drilling listing on the CSE. at Pilot Plant MARCH 27, 2023 Comp

  12. Slide 12: Management & Board of Directors

    ALLIED CRITICAL METALS CORP. MANAGEMENT & BOARD OF DIRECTORS Roy Bonnell Joao Barros Sean O’Neill COO, PRESIDENT & DIRECTOR DIRECTOR & NON-EXECUTIVE CEO & DIRECTOR (Post-RTO) CHAIRMAN (Post-RTO) Roy has founded and been chairman, CEO, or Director Joao Barros brings over 20 years of mining expertise

  13. Slide 13: Corporate Snapshot

    ALLIED CRITICAL METALS CORP. CORPORATE SNAPSHOT $1.5 M to $7.5M Private placement to raise gross proceeds of $1.5 to $7.5 million CAD Concurrent financing terms: $0.60/Unit | Pre-RTO: $0.48/Unit (1 common share + 1 full two-year warrant at up to $1.00) Assuming completion of min. $1.5 million CAD ($

  14. Slide 14: Sources & Uses of Funds

    ALLIED CRITICAL METALS CORP. SOURCES & USES OF FUNDS Conceptual drawing of Borralha mine plan.

  15. Slide 15: For More Information

    ALLIED CRITICAL METALS CORP FOR MORE INFORMATION Roy Bonnell Dave Burwell Office Location CEO & Director The Howard Group Suite 1518 – 800 West Pender Street 514-928-5933 403-410-7907 Vancouver, British Columbia Canada V6C 2V6 royb@alliedcritical.com daveb@alliedcritical.com Canadian Legal Counsel A