Ppg Industries, Inc. · NYSE:PPG

Ppg Industries — Technical Presentation (June 2026)

74 slides from Ppg Industries's technical presentation, June 2026

  1. Slide 1: PPG Global Supplier Webinars 2026

    PPG Global Supplier Webinars 2026 June 15th – AMERICAS June 18th – APAC June 18th – EMEA 1 PPG Global Supplier Quality Manual

  2. Slide 2: Agenda

    Agenda PPG Supplier Quality Manual Contamination Prevention Requirements Management of Change Requirements MOC & PPWR Impact for PPG / Suppliers Lessons Learned Sharing Q&A 2 PPG Global Supplier Quality Manual

  3. Slide 3: Global Supplier Quality Manual

    Global Supplier Quality Manual Luisa Gutierrez Global SD Manager Industrial Segment 3 PPG Global Supplier Quality Manual

  4. Slide 4: Global Supplier Quality Manual - Purpose

    Global Supplier Quality Manual- Purpose Quality Baseline for Approved/Potential Suppliers Consistent Expectations – Reduce ambiguity Shared Accountability and Partnership Alignment & Consistency PPG Supplier Quality Manual Strategic Partnership / Customer Success - Together 4 PPG Global Supplier Qua

  5. Slide 5: Global Supplier Quality Manual - Scope

    Global Supplier Quality Manual - Scope Current & Potential Suppliers to: PPG Industrial Segment Specialty Automotive Industrial Refinish Coatings and Coatings Coatings Coatings Materials Protective Packaging Industrial and Marine Coatings Coatings Coatings Global Industrial Segment Sites Contacts Gl

  6. Slide 6: Core Themes in the Global Supplier Quality Manual

    Core Themes in the Global Supplier Quality Manual Robust QMS Contamination Prevention (Quality Management System) Full requirements flow-down Compliance with PPG & Quality Zero Defects Mindset Standards 6 PPG Global Supplier Quality Manual

  7. Slide 7: Supplier Performance – Adherence to PPG Requirements

    Supplier Performance – Adherence to PPG Requirements (CAIR) 7 PPG Global Supplier Quality Manual

  8. Slide 8: Call for Action – Robust Quality Management System Requirements

    Call for Action – Robust Quality Management System Requirements Robust Minimum Automotive Ultimate Quality Management Requirement OEM Suppliers Maturity System Chapter 2.4 ISO 9001 MAQMSR* IATF 16949 * Minimum Automotive Quality Management System Requirements Exceptions need written Certificates and

  9. Slide 9: Call for Action – Delivery Requirements

    Call for Action – Delivery Requirements Delivery On-time and In Remaining PPG Specific Re Requirements Full shelf-life Rules quirements PACKAGING & Chapter 2.6, 3.4 CoA SHELF-LIFE LABELLING Any exceptions need written PPG approval Communication is KEY 9 PPG Global Supplier Quality Manual

  10. Slide 10: Call for Action – PPG Requirements awareness and commitment

    Call for Action – PPG Requirements awareness and commitment WHY a Zero Defects Mindset? W • Quality is built into the process • Avoid instead of discovering defects HOW to Prevent Nonconformities? H • Strong Process Controls, discipline on the basics. • Training & Awareness – flow down of requiremen

  11. Slide 11: Poll Time

    POLL TIME This Photo by Unknown Author is licensed under CC BY-SA 11 Poll Time

  12. Slide 12: Let's review the results…

    Let´s review the results… 12 Poll Time

  13. Slide 13: Contamination Prevention

    Contamination Prevention Martin Stein – Manager Analytical Lab Christiana Jia – Supplier Development 13 Contamination Prevention

  14. Slide 14: Contamination Prevention: Introduction, Know the threat

    Contamination Prevention P.01 Introduction, Know the threat 14 Contamination Prevention

  15. Slide 15: Topcoat Defects – Which One Is a Crater? How Were They Formed?

    Topcoat Defects – Which One Is a Crater? How Were They Formed? Picture source: © PAS Ingersheim 2024 15 Contamination Prevention

  16. Slide 16: Crater Definition

    Crater Definition Craters are areas where paint on the coated surface has receded, often concentrically, leaving a region with little to no paint. Cratering is caused by incompatible materials either in the paint or on the substrate resulting in a difference in surface tension. Craters can often be

  17. Slide 17: Craters – Huge threat for our business – Action plan @ PPG

    Craters – Huge threat for our business – Action plan @ PPG Crater Confirmation Customer Development Team What to do when craters occur… First steps when craters occur… ▪ Investigation/Confirmation ▪ Acquire actual part with defect at customer site ▪ Line data ▪ Analyze with microscopy – is there par

  18. Slide 18: Theory of Crater Formation – Surface Tension

    Theory of Crater Formation – Surface Tension Any materials incompatible with paint such as low surface tension material that is insoluble or marginally soluble in the coating such as: • Siloxane(s) / PDMS • Oil(s) • Grease(s) • Fluoropolymers / Teflon Picture source: © PAS Ingersheim 2025 • Antipers

  19. Slide 19: Crater contamination at an automotive site

    Crater contamination at an automotive site Contamination may originate from various sources: raw material, paint, atmosphere, and surface area etc. Even trace amounts (<0.001%) can cause craters Typical stages in an OEM paint process 19 Contamination Prevention

  20. Slide 20: Possible Causes of Crater Formation

    Possible Causes of Crater Formation Investigate Crater Causes in Manufacture: • Debris falling from the preceding or subsequent part • Paint contamination with oil, silicone, etc. Picture source: © PAS Ingersheim 2025 • Surface contamination • Contamination in air supply systems • Contamination from

  21. Slide 21: Contamination Prevention: Identify the contaminants

    Contamination Prevention P.02 Identify the contaminants 21 Contamination Prevention

  22. Slide 22: Chemical Families that can cause Craters and severe Contamination

    Chemical Families that can cause Craters and severe Contamination Poly(dimethyl)siloxane(s) (PDMS) and its derivatives Perfluoropolyethers (PFPE) and (Per)fluorinated hydrocarbons Petroleum based oils and greases – Detergents, surfactants, defoamers Additives - emulsifiers 22 Contamination Preventio

  23. Slide 23: Compounds with high potential to cause severe Crater problems (PDMS)

    Chemical Compounds with high / very high potential to cause severe Crater problems Poly(dimethyl)siloxane(s) (PDMS) and its derivatives Contamination sources: Polysiloxanes are common ingredients in a large range of personal care products (lotions, antiperspirants, hair gels, etc.), medicines (flatu

  24. Slide 24: Compounds with high potential to cause severe Crater problems (PFPE)

    Chemical Compounds with high / very high potential to cause severe Crater problems Perfluoropolyethers (PFPE) and (Per)fluorinated hydrocarbons By Heather Smith - The Alloy Valve Stockist's photo Gallery CC BY 3.0, https://commons.wikimedia. org/w/index.php?curid=9655235 Dsimic at English Wikipedia

  25. Slide 25: Compounds with medium potential to cause severe Crater problems

    Chemical Compounds with medium potential to cause severe Crater problems Petroleum based oils and greases – Detergents, surfactants, defoamers Additives - emulsifiers Contamination sources: lubricants, compressed air supply, emulsifiers, release agents, plasticizers in plastic parts and Various addi

  26. Slide 26: Road tankers or tank wagons for bulk transport

    Road tankers or tank wagons for bulk transport If the wagons are not dedicated to a specific product, prior loads can act as sources of cratering contaminants. Hoses, fittings, gaskets, and valves associated with the wagons can also be contaminated, especially if they are new or not properly cleaned

  27. Slide 27: Steel Totes and Steel Drums and Pails

    Steel Totes and Steel Drums and Pails The use of recycled or reconditioned steel drums, pails, cans, IBCs or any other packaging is strictly prohibited in any part of the process or in the final/empty packaging to any PPG Automotive OEM related site Recycled, Reconditioned and Rebottled Packaging Po

  28. Slide 28: Sample Selection / Sample Preparation

    Sample Selection / Sample Preparation Picture source: © PAS Ingersheim 2024 - If possible, provide multiple defect samples. environmental dirt - Do not handle samples with bare hands or contaminated gloves. crater - Ensure samples are representative. Mark defects clearly using a scalpel or pointed t

  29. Slide 29: Contamination Prevention: Eliminate the contaminants

    Contamination Prevention P.03 Eliminate the contaminants 29 Contamination Prevention

  30. Slide 30: 10 Golden Rules

    10 GOLDEN RULES 5 3 1 2 4 I always wear approved I only use personal work-wear in area of hygiene products I follow the crater production, laboratories approved as “crater- prevention process I do not enter any I do not introduce and applications. free”. and procedures. Crater material in production

  31. Slide 31: Golden Rules 5 and 8 – Silicone List

    Golden Rules 5 and 8 – Silicone List Personal hygiene products and cosmetics containing any of these substances should be avoided wherever possible 31 Contamination Prevention

  32. Slide 32: Golden Rules 5 and 8

    Golden Rules 5 and 8 Additional note: - Critical medicines may require special attention, proper hand washing with soap is essential - Increased vigilance is required in cases of head lice (at home or in close contacts) 32 Contamination Prevention

  33. Slide 33: The Golden Rules 1 - 4, 7 and 9

    The Golden Rules 1 - 4, 7 and 9 • HOUSEKEEPING: Control of dirt, oils, and greases must be incorporated into site procedures. Ensure that cleaning procedures are validated as effective and that cleaning products are approved. • New protective clothing should be pre-washed using a chemical cleaning p

  34. Slide 34: Trisiloxanes – a challenge in rural areas

    Trisiloxanes – a challenge in rural areas Trisiloxanes are required for plant protection products to wet the leaf surfaces! Von Jü - Eigenes Werk, Gemeinfrei, https://commons.wikimedia.org/w/index.php?curid=25350373 34 Contamination Prevention

  35. Slide 35: If it is too late… – Analytical techniques to analyze craters

    If it is too late… – Analytical techniques to analyze craters Optical/CLSM SEM/EDX FTIR-Microscopy • Scanning Electron Microscope (SEM) with • IR Microscope equipped with Elemental Analysis (EDX) a Germanium ATR crystal • Optical microscope used to • SEM used to obtain higher • Crystal can be positi

  36. Slide 36: If it is too late… – Analytical techniques to analyze craters

    If it is too late… – Analytical techniques to analyze craters Optical/CLSM SEM/EDX FTIR-Microscopy Especially used when Especially used when All kind of solid samples analyzing samples of analyzing samples of inorganic nature organic nature Carbon Oxygen Titanium Silicon Aluminium Sulfur Magnesium I

  37. Slide 37: Before it is too late – It is better to analyze raw materials

    Before it is too late – It is better to analyze raw materials / additives prior to usage 102 90 %T 80 70 60 50 43 100.1 99.8 %T 99.6 99.4 99.2 99.0 98.9 105 %T 90 80 70 60 55 101 90 %T 80 70 60 55 102 80 %T 60 40 20 8 102 80 %T 60 40 20 8 4000 3500 MS 2002;(c) MS 2007 3000 2500 2000 1750 1500 1250 1

  38. Slide 38: Contamination Prevention: Summary

    Contamination Prevention P.04 Summary 38 Contamination Prevention

  39. Slide 39: Summary / Actions

    Summary / Actions ▪ Housekeeping / 5S CONTROL ▪ Control supply chain and bulk transport ▪ Ensure contamination-free packaging ▪ Prevent cross-contamination (silicones) ▪ Use approved materials (PPG MRL) PREVENT ▪ Pre-clean all new/repaired equipment ▪ Clean non-dedicated equipment between batches CR

  40. Slide 40: Poll Time

    POLL TIME This Photo by Unknown Author is licensed under CC BY-SA 40 Poll Time

  41. Slide 41: Let's review the results…

    Let´s review the results… 41 Poll Time

  42. Slide 42: Let's review the results…

    Let´s review the results… 42 Poll Time

  43. Slide 43: Management of Change – Change Notifications

    Management of Change Change Notifications Adila Cizmic – SD Manager EMEA Cathleen Li – SD Manager APAC Ruth Zorrilla – SD Manager LATAM Kyle Walters – SD Manager USCA „Change is the only constant.“ Heraclitus 43 Management of Change

  44. Slide 44: Management of Change = Risk Mitigation

    Management of Change = Risk Mitigation • Process • Equipment • Materials • Suppliers • Packages • Organizational • Personnel Operational Excellence and Productivity 44 Management of Change

  45. Slide 45: 2.5 Management of Change Requirements

    SQR-01 IS GSQM 2.5 Management of Change Requirements Changes that affect: Organizational Changes • Characteristics • Outsourcing • Performance • Quality system updates • Regulatory compliance • ERP changes Global Supplier Quality Manual – PPG IS Supply Changes Technical Changes • Sub-suppliers • Com

  46. Slide 46: 2.5 Management of Change Requirements

    SQR-01 IS GSQM 2.5 Management of Change Requirements Major and minor CHANGES PIGMENTS Advance Notification to PPG in minimum 2 years in writing advance notification OTHER MATERIALS UV ABSORBERS 6 months before and HALS implementation one year prior the Global Supplier Quality Manual – PPG IS change

  47. Slide 47: 2.5 Management of Change Requirements

    SQR-01 IS GSQM 2.5 Management of Change Requirements • Use the Supplier Change Notification form PPG Change Notification Form • Contact : PPG Procurement contact (Sourcing Manager) Sites and Contacts 47 Management of Change

  48. Slide 48: Suppliers MOC Requirements and Standards Alignment

    Suppliers MOC Requirements and Standards Alignment ISO 9001 MOC 6.1 Address risks and Alignment fully embedded opportunities across key 6.3 Planning of changes ISO 9001 8.1 Operational planning and control 8.5.6 Control of changes requirements Proudly ISO 9001 Certified Suppliers must comply with MO

  49. Slide 49: Global examples of failed MOCs

    Global examples of failed MOCs 2007 Mattel 2008 - 2019 Takata 2014 GM Lead Paint- Recall Airbag Recall Ignition Switch recall Severe financial and IMPACT Severe financial impact Severe financial impact reputational impact Change in critical material MOC Sub-Supplier Changes Inadaquate risk evaluatio

  50. Slide 50: Key Takeaways

    KEY TAKEAWAYS Control Changes • RISK • DISRUPTIONS Communicate • QUALITY IMPACT Changes • COST OF NON- PPG Approval CONFORMANCE prior implementation An effective Management of Change Process is more than a procedure — it's a protection for you, for us, and for our valued PPG customers! 50 Management

  51. Slide 51: Thank you

    Thank you Adila Cizmic – SD Manager EMEA Cathleen Li – SD Manager APAC Ruth Zorrilla – SD Manager LATAM Kyle Walters – SD Manager USCA 51 Management of Change

  52. Slide 52: Poll Time

    POLL TIME This Photo by Unknown Author is licensed under CC BY-SA 52 Poll Time

  53. Slide 53: Let's review the results…

    Let´s review the results… 53 Poll Time

  54. Slide 54: MOC & PPWR Impact for PPG & Suppliers

    MOC & PPWR Impact for PPG & Suppliers June 15 – 18, 2026 54 MOC & PPWR Impact

  55. Slide 55: Meet the presenter Dirk Thelen

    Meet the presenter Dirk Thelen Regional Director EU Green Deal 55 MOC & PPWR Impact

  56. Slide 56: Packaging – what is at stake for PPG?

    Packaging – what is at stake for PPG ? All – packaging (consumer and industrial) 2025 • Sales Packaging (‘’paint in a can’’) 2040 Higher mandatory PPWR Publication • Grouped Packaging (‘’carboard box containing pails’’) minimum recycled (Packaging and Packaging • Transport Packaging incl. e-commerce

  57. Slide 57: Our PPWR expectations towards suppliers

    Our PPWR expectations towards suppliers Collaboration... Collaboration ... Collaboration TODAY TRANSITION FUTURE PPG requires all Packaging full and proactive Collaboration from all suppliers: all Packaging compliant with compliant with OTIF ISS FEEDBACK • PPWD • PPWR DATA Challenge MOC • Plastic Ta

  58. Slide 58: Poll Time

    POLL TIME This Photo by Unknown Author is licensed under CC BY-SA 58 Poll Time

  59. Slide 59: Let's review the results…

    Let´s review the results… 59 Poll Time

  60. Slide 60: Lessons Learned sharing with Suppliers

    Lessons Learned sharing with Suppliers Lynn Stanziale – Supplier Quality Engineer USCA Peralta Paulina – Supplier Quality Engineer LATAM Elena Mantel – Supplier Quality Engineer EMEA Maciej Pilarczyk – Supplier Quality Engineer EMEA 60 Lessons Learned

  61. Slide 61: Lessons Learned- Failed MOC

    Lessons Learned- Failed MOC KEY MESSAGE All Changes must be communicated & approved by PPG MOC process to prevent: • Quality issues • Supply disruptions • Lasting business impact Material PPG Team is Supplier Supplier decided to changed continued to still qualifying production line be out of spec mo

  62. Slide 62: Lesson Learned

    LESSON LEARNED SQR04 equipment pre-cleaning guidelines SQR06 low surface tension materials What happened? SQR08 MR List Guidelines -Compatibility Matrix /Prior Cont Cross-contamination in bulk materials caused by lack of consistent contamination - Risk Assessment Compatibility Matrix /Prior Content

  63. Slide 63: Lesson Learned

    Lesson Learned 63 PPG Global Supplier Quality Manual

  64. Slide 64: Poll Time

    POLL TIME This Photo by Unknown Author is licensed under CC BY-SA 64 Poll Time

  65. Slide 65: Let's review the results…

    Let´s review the results… 65 Poll Time

  66. Slide 66: Let's review the results…

    Let´s review the results… 66 Poll Time

  67. Slide 67: Glossary of abbreviations and links

    Glossary of abbreviations and links 67 Q&A

  68. Slide 68: Glossary of abbreviations and acronyms

    Glossary of abbreviations and acronyms Acronym Meaning Acronym Meaning ATR Attenuated Total Reflectance PDMS Poly(dimethyl)siloxane CAIR Corrective Action Incident Reporting PFPE Perfluoropolyethers PPWD Packaging and Packaging Waste Directive CLSM Confocal Laser Scanning Microscope PPWR Packaging a

  69. Slide 69: Links

    Links Supplier Change SQR02 bulk transport SQR05 Guidelines for PPG GSQM Notification Form requirements Reusable Steel Totes SQR03 Supplier Recycled, reconditioned SQR06 Low Surface PPG Site Contacts nonconformances and rebottled pkg policy tension materials response Contamination SQR04 equipment SQ

  70. Slide 70: Q&A

    Q&A 70 Q&A

  71. Slide 71: Questions and Answers

    Questions and Answers Is IATF 16949 Is ISO 9001 a What happens if What is the best Can you describe mandatory for PPG requirement for all an existing approach to align your supplier suppliers, suppliers, or only supplier loses its our defect list with audit process? particularly raw for those supply

  72. Slide 72: Questions and Answers!

    Questions and Answers! With the updates to the Are silicone- and Do you send any Does PPG still PPG MRL submission crater-related issues notifications if there Does PPG have provide a global process last year, can specific to are changes to the sustainability MRL? you explain the new Automotive OEM

  73. Slide 73: Do you have any further questions?

    Do you have any further questions? luisa.gutierrez@ppg.com cizmic@ppg.com cali@ppg.com zorrilla@ppg.com kwalters@ppg.com cjia@ppg.com emantel@ppg.com pperalta@ppg.com lstanziale@ppg.com pilarczyk@ppg.com 73 PPG Global Supplier Quality Manual

  74. Slide 74: Thank you for your attention.

    Thank you for your attention.