Mt Malcolm Mines NL · ASX:M2M
Mt Malcolm Mines NL — Shareholder Meeting (November 2026)
23 slides from Mt Malcolm Mines NL's shareholder meeting presentation, Nov 17, 2026

Slide 1: Annual General Meeting 2026
Annual General Meeting 2026 rsonal use only Golden Crown bulk sampling pit (recent drilling, drone image) Golden Crown drilling | Calypso program | Regional target pipeline 17th November 2026

Slide 2: Important notice
Important notice General Forward-looking statements rsonal use only • This presentation has been prepared by Mt Malcolm Mines NL • This presentation contains forward-looking statements about (M2M or the Company) for its 2026 Annual General Meeting. It planned drilling, studies, timing, funding and p

Slide 3: Competent Persons and prior announcements
Competent Persons and prior announcements Exploration Results Mineral Resources rsonal use only Information relating to Exploration Results is based on information compiled by Mr Information relating to the Golden Crown and Dumbarton Mineral Resources is Vivek Sharma, a Competent Person and full-tim

Slide 4: Milestones since the 2025 AGM
Milestones since the 2025 AGM 4 New Regional 13,200 oz 24 holes ~8,500 m rsonal use only Targets Maiden JORC 2012 Mineral 2,520 m RC at Golden Crown Proposed Calypso program; Resource, Golden Crown and (Jul–Aug 2026); 17 holes contractor appointed, first Copper and gold targets Dumbarton intersected

Slide 5: Malcolm Gold Project: ~200 km² near Leonora
Malcolm Gold Project: ~200 km² near Leonora • Semi-contiguous tenement package of ~200 km², rsonal use only 10–25 km east and north-east of Leonora, in the Archaean Yilgarn Craton (Norseman–Wiluna Greenstone Belt). • Hosts the Golden Crown and Dumbarton JORC 2012 Mineral Resources, the historical Ca

Slide 6: Maiden Mineral Resource: 13,200 oz Au
Maiden Mineral Resource: 13,200 oz Au Contained gold by prospect and category (oz) 10,500 oz 2,700 oz 0.5 g/t rsonal use only 10,000 9,000 Indicated (80%) Inferred (20%) Au cut-off 8,000 1,900 7,000 • 269 kt @ 1.53 g/t Au for 13,200 oz, reported within conceptual pit shells 6,000 (A$6,500/oz gold pr

Slide 7: Golden Crown: 2026 RC campaign completed
Golden Crown: 2026 RC campaign completed 24 holes 22 of 24 17 of 24 10 holes rsonal use only 2,520 m RC, Jul–Aug 2026 holes with assays >0.2 g/t Au holes with intercepts ≥0.5 g/t with a 1 m assay >1 g/t Au Au Best result by hole (24 holes) • Aims: infill known lodes, step out along the NW trend, dri

Slide 8: Golden Crown: selected shallow intercepts
Golden Crown: selected shallow intercepts Hole From (m) Intercept Including rsonal use only 26GCRC014 31 6 m @ 9.28 g/t Au* 1 m @ 23.5 g/t from 31 m 26GCRC024 12 9 m @ 3.64 g/t Au* 4 m @ 6.50 g/t from 12 m 26GCRC022 13 3 m @ 5.78 g/t Au 1 m @ 13.77 g/t from 13 m 26GCRC027 21 5 m @ 2.88 g/t Au* 1 m @

Slide 9: Golden Crown: gold mineralised intercepts ~350 m to the west of known mineralisation
Golden Crown: gold mineralised intercepts ~350 m to the west of known mineralisation • Three of five western step-out holes returned assays above 0.3 g/t Au. Best: 1 m @ 3.55 g/t Au from 22 m rsonal use only (26GCRC030). • Holes 028 and 031 were barren to weakly anomalous. The extension holes inters

Slide 10: Golden Crown: shallow, stacked-lode system
Golden Crown: shallow, stacked-lode system • Structurally controlled stacked lodes (West, East, Upper, Lower) along the rhyolite hanging-wall contact; gold is controlled by a rsonal use only compressional jog in a dextral shear zone. • Earlier results (pre 2026 drilling): 10 m @ 15.40 g/t Au from 10

Slide 11: Calypso: historical Exploration Target and T3
Calypso: historical Exploration Target and T3 2.9–3.9 Mt @ 1.6–2.2 g/t Au rsonal use only Historical, conceptual Exploration Target for T1–T2 (153,000–279,000 oz Au*). Not an M2M estimate. • Prepared by BMGS (2019) and reported by Torian Resources (ASX: TNR, 22 Feb 2019; now GoldArc Resources, ASX:

Slide 12: Calypso: drilling contractor appointed
Calypso: drilling contractor appointed Item Detail rsonal use only Contractor iDrilling Australia Pty Ltd (appointed 4 Sep 2026) ~8,500 m across ~30 collars at T1, T2 and T3; RC and RC pre-collar with Proposed program diamond tails (~3,000 m diamond proposed). Subject to final optimisation, approval

Slide 13: Braiser: new copper–gold target
Braiser: new copper–gold target 1.37% Cu 0.44 g/t Au rsonal use only highest selective rock chip highest rock-chip gold (XRK0196) (XRK0192) • Ten opportunistic rock chips returned up to 1.37% Cu, 1.34% Cu and 0.46% Cu; ~300 pXRF soil samples were also collected. • A Cu–As–Co signature supports a pot

Slide 14: Regional pXRF targets: laboratory work next
Regional pXRF targets: laboratory work next pXRF maxima by prospect (ppm, field screening) Malcolm South (E37/1419) rsonal use only 120 108 230-sample pXRF grid; As–Sb–W–Bi–Tl response overlaps a compact 102 magnetic feature and interpreted shear. Source of the magnetic feature not 100 yet drilled.

Slide 15: 2025 RC drilling: Dumbarton and Picnic South
2025 RC drilling: Dumbarton and Picnic South Prospect Selected intercepts Release 15 of 18 rsonal use only 3 m @ 2.19 g/t Au from 58 m incl. 1 m @ 4.48 g/t (25DBRC004); Dumbarton 4 Sep 2025 Dumbarton holes above 0.3 g/t Au (18 2 m @ 3.03 g/t Au from 59 m incl. 1 m @ 6.51 g/t (25DBRC0012) holes, 1,82

Slide 16: 500ktpa Processing plant: assessment under way
500ktpa Processing plant: assessment under way Binding agreement to acquire major components of 15 Dec 2025 a 500,000 tpa carbon-in-leach plant. rsonal use only Ecopure Minerals appointed for technical support; a 11 Feb 2026 funding consultant engaged. Processing plant study commenced. Mar 2026 Cond

Slide 17: Next steps
Next steps Prospect Planned next step (December 2026 quarter) rsonal use only Structural model update; plan step-out and infill RC on the NW trend and western extensions; evaluate for Golden Crown resource update Calypso T1–T3 RC drilling ~2,000 m, subject to weather and access conditions Braiser Ma

Slide 18: Calypso: current exploration focus
Calypso: current exploration focus T3 plunge ~8,500 m >20,000 m 16.21 m rsonal use only components and proposed program across ~30 collars, subject to approvals cumulative drilling at Calypso to date @ 4.01 g/t Au from 343.25 m at T3 (22CALDD0011W1) Northern Limb yet and budget to be drill tested •

Slide 19: Calypso: how the program is planned to run
Calypso: how the program is planned to run rsonal use only 1 2 3 4 Drill Assay and interpret Extend Evaluate RC drilling of ~2,000 m ongoing Initial assays expected within two Test corridor continuity between Resource evaluation, with the for the December quarter, then months of sample submission. h

Slide 20: Focus on Calypso
Focus on Calypso Calypso: first priority Golden Crown Regional targets Processing plant rsonal use only Drill T1–T3 (~8,500 m proposed) Update the 3D structural model; Laboratory verification at Technical and economic toward a maiden JORC 2012 plan step-out and infill drilling; Malcolm South and Har

Slide 21: Appendix A: Mineral Resource summary
Appendix A: Mineral Resource summary Prospect Indicated (t / g/t / oz) Inferred (t / g/t / oz) Total (t / g/t / oz) rsonal use only Golden Crown 80,800 / 1.47 / 3,800 14,900 / 1.68 / 800 95,700 / 1.50 / 4,600 Dumbarton 131,700 / 1.58 / 6,700 41,600 / 1.42 / 1,900 173,300 / 1.55 / 8,600 Total MRE 212

Slide 22: Appendix B: ASX announcements referenced
Appendix B: ASX announcements referenced Date Announcement Slides 22 Feb 2019 Torian Resources (ASX: TNR): Calypso Update – Exploration Target Defined 3, 11, 18 rsonal use only 27 Apr 2022 Calypso Exploration Update (gravity targets T1–T4) 11 17 Jan 2023 Constance Lodes Confirm T3 Discovery Zone at

Slide 23: rsonal use only
rsonal use only www.mtmalcolm.com.au info@mtmalcolm.com.au 8 Sarich Court, Osborne Park WA 6019 Ph (08) 62446617 TREVOR DIXON : Managing Director trevor@mtmalcolm.com.au
Source: ASX announcement, Nov 17, 2026
More decks from Mt Malcolm Mines NL
Investor Presentation (November 2025)19 slides · Nov 10, 2025
RIU Explorers Conference Fremantle 202537 slides · Feb 18, 2025
Shareholder Meeting (November 2024)12 slides · Nov 21, 2024
RIU Resources Round-up 202427 slides · May 7, 2024
Investor Presentation (May 2023)16 slides · May 9, 2023
121 Conference Investor Briefing (October 2022)18 slides · Oct 11, 2022