Rockhopper Exploration plc · LSE:RKH
Rockhopper Exploration — Corporate Update (April 2011)
17 slides from Rockhopper Exploration's corporate update, April 2011
Slide 1: Rockhopper Exploration PLC April 2011 Update
Rockhopper Exploration PLC April 2011 Update www.rockhopperexploration.co.uk
Slide 2: Disclaimer
Disclaimer Certain information in this presentation about the Company and its prospects constitutes forward-looking information. Such forward-looking information, including but not limited to statements with respect to anticipated rates of production, the estimated costs and timing of the Company's
Slide 3: Falkland Island Exploration Areas
Falkland Island Exploration Areas 3
Slide 4: Rockhopper Falkland Islands: Board of Directors
Rockhopper Falkland Islands Board of Directors Dr. Pierre Jungels, CBE: Chairman PhD Geophysics & Hydraulics, California Institute of Technology Previously at Shell, PetroFina SA, Enterprise Oil Sam Moody: CEO Co-founder of Rockhopper Previously at AXA Equity & Law Investment Management, St
Slide 5: Rockhopper – current corporate position
Rockhopper – current corporate position Fully funded for all 2011 activities No debt, no convertibles Current cash position – circa 300 million USD 258 million shares in issue AIM listed: ticker RKH.L 5
Slide 6: NFB 2010/2011 drilling
NFB 2010/2011 drilling 2010/2011 Drilling History – North Falkland Basin name operator code date type rkh wi*** oil pay (net) Liz DES 14/19-1 apr 2010 exploration 7.5% - Sea Lion RKH 14/10-2 may 2010 exploration 100% 53m Ernest RKH 26/6-1 aug 2010 exploration 100% - Flow test RKH (14/10-2) sep 2010
Slide 7: Sea Lion - history
Sea Lion - history Detailed Sea Lion Well Results Table Gross Net to gross Number of Net to gross Ave Sw in Oil column Net pay Porosity (%) reservoir main sands in pay zone pay zone (tvdss) thickness 14/10-2 67m 80% 7 83% 30% 2374m-2581m 53m 18-29 14/10-3 110m 85% 4 91% 63% 2473m-2481m 7.3m 18-25 14
Slide 8: 14/10-2 CPI
14/10-2 CPI 14/10-2 67m Gross reservoir thickness Top Sea Lion Upper Fan 80% net : gross 2400m (-2374m tvdss) 83% Net : Gross in pay zone 18-29% porosity 53m net pay 30% Average Sw in pay zone Oil recovered to surface from multiple MDT’s Well flow tested for 18hours at approximate rate of 2000bopd f
Slide 9: 14/10-3 CPI
14/10-3 CPI 14/10-3 110m Gross reservoir thickness 84% net : gross 91% Net : Gross in pay zone 18-25% porosity 7.3m net pay 63% Average Sw in pay zone Top Sea Lion Northern Fan 2425m (-2399m tvdss) 2473.5m mdbrt Oil recovered to surface from MDT Top S2 Fan 2515m (-2488m tvdss) 9
Slide 10: 14/10-4 CPI
14/10-4 CPI 14/10-4 107m Gross reservoir thickness 76% net : gross 88% Net : Gross in pay zone 15-27% porosity 33m net pay 35% Average Sw in pay zone Oil recovered to surface from Top Sea Lion Upper Fan multiple MDT’s 2465m (-2439m tvdss) 2486m mbrt MDT Dual Packer flowed oil at 2,700 bopd equivalen
Slide 11: Sea Lion: Management Interpretation post 14/10-4
Sea Lion Management Interpretation post 14/10-4 new low case area 22 km2 516 mmbbls STOIIP 155 mmbbls recoverable using 30% recovery additional wells required to confirm Management low case area STOIIP and recoverable economically viable using RPS Energy economics from 2009 Competent Perso
Slide 12: Sea Lion: Management Interpretation post 14/10-4
Sea Lion Management Interpretation post 14/10-4 new mid case area 36.5 km2 volumes to be determined by drilling additional wells new high case area to be determined using additional seismic New mid case area 12
Slide 13: Sea Lion: Reservoir Distribution
Sea Lion Reservoir Distribution Analysis of MDT pressures and logging data indicates communication between 14/10-2 and 14/10-4 in the southern fan upper All 3 wells have encountered thick sequences of good quality reservoir as prognosed Company does not believe 14/10-2 and 14/10-3 to be in communica
Slide 14: Sea Lion – RPS Energy economics
Sea Lion – RPS Energy economics Data from RPS Energy CPR 2009 Sea Lion Low Mid High 9000 npv 10 @ usd 80 bbl oil price 8000 STOIIP 234 568 1348 7000 mmbbls 6000 Recoverable 58 170 472 5000 mmbbls 4000 3000 2000 1000 NPV10 @ $ 548 $2,498 $8,366 0 USD 80 bbl $ mm 58 170 472 recoverable barrels 14
Slide 15: 2011 Plan - seismic
2011 Plan - seismic Acquisition of new 3D seismic in unexplored areas with Polarcus 2x vessels shared with other operators Large programme - c 5000km2 Re-processing of existing 3D seismic Data acquisition currently due to complete late April Processed data likely to be ready for interpre
Slide 16: 2011 Plan - drilling
2011 Plan - drilling Determine size of Sea Lion discovery Additional exploration Minimum 3 further wells Full flow test equipment targeted to be in place for next Rockhopper well 16
Slide 17: Summary
Summary Fully funded Strong Board and management team – highly focused First oil discovery in the Falklands First flow test in the Falklands First successful appraisal in the Falklands 17
Rockhopper Exploration — Corporate Update (April 2011) on 6ix