Slide 1: Presentation to North American Investors & Brokers
iii iii tit ANN Tg Eduard Eshuys, Managing Direc
Slide 2: Brief History
Slide 3: Brief History cont...
Slide 4: — oe
— oe
Slide 5: Strategic Overview
Strategic Overview Increase gold production and cash flow Producing at rate of 450,0000zs p.a. in second half 2008 Cash costs of AS450-AS500 (US$365-US$400)/oz i Grass roots explo : Nickel Sulphides explc
Slide 6: Issued capital at March 2007
Issued capital at 31 March 2007 _ | 820m shares 1 35m options Daily Share SBM.ASX = —SBM.ASK Dia is io In jo oo fF im ja im fy [7 [A is fo iM [Doo
Slide 7: Our Current Interests
ae | | : Our Curren YY i/nterests... Land portfolio Australia wide 13,000sq km Resources 8. 3Moz Reserves. 1./Moz Production 2006-2007 172kozs @ AS490 (US$395)/0z Historical exploration 30% Note, Shareholding in Sarac:
Slide 8: ] = = = = a us ee us ee ,
] = = = = a us ee us ee ,
Slide 9: a : = : = G s = a Dec-O6 MVar0/ JunO7
a : 5 = : 6 = G s 2 = a Dec-O6 MVar0/ JunO7
Slide 10: Marvel Loch the cornerstone of SX Operation
Marvel Loch the cornerstone of $X Operation « EE 5: 4.9m @ 6.Zait,
Slide 11: Historical Production
Historical Production: | Nevoria 388koz | GVG 335ko0z Hercules to date 141koz
Slide 12: Great Victoria
i< Great Victoria i B: CVG Drilling fone | ‘Past production 335Koz / Kilometres strike _ Shallow pits to 80 metres Grand Nation a. Surface laterite potential e Dirting Zone y Le Z i “ i Bronco South oe ay GVG Locality Showing 2007 Drilling
Slide 13: SS lr
SS lr
Slide 14: Sats
Sats
Slide 15: Gwalia Deeps Reserves & Resources
Gwalia Deeps Reserves & Resources | at 31 December 2006
Slide 16: — oo
— oo
Slide 17: Mining costs and methods
: Mining costs A$/3 (US$56) per tonne Dilution 17% Recovery 77% Sub-level open stoping with pastefill
Slide 18: So) ee
SF Se — — . =... So) ee |
Slide 19: So) ee
SF Se — — . =... So) ee
Slide 20: So) ee
SF oe — — . =... So) ee
Slide 21: Leonora Operations
Slide 22: Evaluating open pit resources and nickel sulphide exploration
Loe Lo yo a e a ae oF ee Z Ve a SS ies Vy oe Ge ee ey Zz a a Lee ou a cn aes a — Ee ie es ay Evaluating open pit resources at Kailis and others Nickel sulphide _ exploration underway
Slide 23: Mn ee
: Mn ee ee Do ee oe a i uy So
Slide 24: SBM holds 50M shares
SBM holds 50M shares at ve See dog. i ; Lo A Ly 5 ay : és a . ee gi .oCents 0 ae ; a Le g CC i ey, Historical production 22Moz to depth 750m inferred resources 11Mozs to depth 1,500m HES) cemutas iniring t : oo _ Australia after Ee | —CKelgoorlie
Slide 25: Ne ign
es Ne ign S
Slide 26: r————SN
r————SN
Slide 27: SF Se ee | -~— Cr
SF Se ee | -~— Cr
Slide 28: a ser
SS se a ser
Slide 29: Disclaimer