Pursuit Minerals Ltd · ASX:PUR

Pursuit Minerals — Investor Presentation (September 2018)

24 slides from Pursuit Minerals's investor presentation, Sep 12, 2018

  1. Slide 1: Road Show Presentation September 2018

    + Discovery + Resource Definition + Value Capture Road Show Presentation September 2018

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This Presentation contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’, or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an assessment

  3. Slide 3: Company Snapshot (ASX:PUR)

    Company Snapshot (ASX:PUR) Quality assets Capital Structure Shareholders • Finland & Sweden vanadium • Shares: 81,470,513 • Teck Aust. 16.35% • Cash $2.6M (30 June, 2018) • Suburban Holdings 5.46% • Favourable mining jurisdictions • Share price: $0.06 • JP Morgan Nom 4.26% • Access to quality infras

  4. Slide 4: Vanadium – The Best Performing Metal

    Vanadium – The Best Performing Metal • >300% price increase in last 12 months • 10 year high in July 2018 • Best performing metal in last 12 months • Supply deficit predicted

  5. Slide 5: Vanadium Deficit Forecast

    Demand Vanadium Deficit Forecast • Chinese rebar standards due November 2018, increase consumption by 30% (10,000t per year) • Energy storage - Battery demand in VRFB’s, grew by 34% in Supply 2017, 60% CAGR predicted 2018-2022 • Mine closures in Russia • Vanadium CAGR until 2027 is 3.2% (CAGR 2007-2

  6. Slide 6: Scandinavian Vanadium Project Portfolio

    Scandinavian Vanadium Project Portfolio • World class vanadium magnetite concentrate grades • Finland previously produced 10% of global vanadium • Finland is number 1 mining jurisdiction in latest Fraser Institute Survey • Projects acquired by pegging open ground • Pursuit has 100% Interest • JORC E

  7. Slide 7: Airijoki Project

    Airijoki Project • Re-sampling of historical drill holes1 ▪ 178.3m @ 1.33% V2O5, (magnetite concentrate) ▪ 16m @ 2.05% V2O5 , (magnetite concentrate) ▪ 10m @ 2.01% V2O5 (magnetite concentrate) • Rock chip samples range from 0.5% - 1.1% V2O5 (whole rock) • 3.5km magnetic anomaly • Mineralisation is o

  8. Slide 8: Airijoki Project

    Airijoki Project1 178.3m @ 1.33% V2O5, (mag con) 16m @ 2.05% V2O5 , (mag con) 10m @ 2.01% V2O5 (mag con) 1See Pursuit Minerals ASX Announcement 27 August 2018. The Company is not aware of any new information or data that materially affects the information contained in that announcement.

  9. Slide 9: Airijoki Prospect – Next Steps

    Airijoki Prospect – Next Steps Event Timing Rock chip sampling of extensions to vanadium October 2018 mineralisation Ground magnetic survey to October 2018 finalise drill targets Drilling November 2018 Initial Inferred Mineral March 2019 Resource Scoping Study May 2019 Commence PFS & Infill Drilling

  10. Slide 10: Central Sweden Vanadium Projects

    Central Sweden Vanadium Projects • Kullberget* ▪ Outcropping mineralisation 1% V2O5 , 20% Fe ▪ Drilling planned for December 2019 • Simesvallen* ▪ 15km strike length magnetic anomaly ▪ Historical mining 0.9% V2O5 ▪ Drilling planned for January 2019 • Summassjon* ▪ 7.5km long magnetic anomaly ▪ Seven

  11. Slide 11: Finland Vanadium Projects

    Finland Vanadium Projects • Koitelainen ▪ 80-105Mt of Insitu Exploration Target containing 4-10.5Mt of magnetite @ 2-2.3% V2O5 (in Mag. Conc.) for 80-241kt of V2O5 (Koitelainen Vosa)1. The Exploration Target reported for the Koitelainen Vosa Prospect is conceptual in nature and there has been insuff

  12. Slide 12: Karhujupukka Vanadium Project

    Karhujupukka Vanadium Project • 5.2Mt @ 0.43% V2O5, 32% Fe, 6.2% Ti, 0.02% Co1 • Excellent access to infrastructure ▪ Railway line running south to proposed vanadium smelter at Raahe ▪ 220kV powerline at Tuuliharju • Airborne EM/mag survey previously flown over project, generated targets which were

  13. Slide 13: Koitelainen Vosa Prospect – Exploration Target

    Koitelainen Vosa Prospect – Exploration Target Exploration Target (JORC Compliant) • 80-105Mt of Insitu Exploration Target containing; • 4-10.5Mt of magnetite @ 2-2.3% V2O5 (in Mag. Conc.) • 80-241kt of V2O51 • Magnetic anomalies associated with high grade mineralisation extend a further 3.5km from

  14. Slide 14: Koitelainen Vosa Prospect

    PURSJiT KOITELAINEN PROJECT GEOLOGY & DRILLING om @ 2.05% V205 45m @ 2.43% YE 8.3m @ 2.1% V20s| 6m @ 2.63% V20s 16.75m @ 1.99% V205 12.85m @ 2.15% V20s 45m @ 2.36% V20s 9.85m @ 2.17% V20s \.-[25.45m @ 2.12% V20s LEGEND

  15. Slide 15: Koitelainen Vosa Vanadium Prospect – Southern Cross Section

    Koitelainen Vosa Vanadium Prospect – Southern Cross Section Koitelainen Vosa Prospect ▪ Extremely high grade V2O5 in magnetite concentrate, in the top echelon globally1 ▪ Magnetite concentrate average grade 2-2.3% V2O52 ▪ Only two mines produce V2O5 in magnetite concentrate above 2%1 ▪ Mineralisatio

  16. Slide 16: Koitelainen Vosa Prospect – Next Steps

    Koitelainen Vosa Prospect – Next Steps Event Timing Sampling of October, November historical drill core 2018 Inferred Resource December 2018 Statement Scoping Study March 2019 Pre-Feasibility April 2019 Study Decision Commencement of Pre-Feasibility May 2019 Study Infill Drilling to define Indicated

  17. Slide 17: Summary - The Right commodity at the Right time in the Right place

    Summary - The Right commodity at the Right time in the Right place • Vanadium demand for VRFB’s predicted to grow at 60% CAGR 2018-2022 • Cheap power, excellent access to infrastructure, worlds best mining destination • Koitelainen Project ▪ 80-105Mt of Insitu Exploration Target containing 4-10.5Mt

  18. Slide 18: Competent Persons Statement

    Competent Persons Statement Statements contained in this presentation relating to exploration results, historical exploration results, historical estimates of mineralisation and Exploration targets are based on, and fairly represents, information and supporting documentation prepared by Mr. Jeremy R

  19. Slide 19: APPENDICES

    APPENDICES

  20. Slide 20: Drivers for demand growth – Energy Storage

    Drivers for demand growth – Energy Storage Global cumulative storage deployments (GWh) • VRFB market is expected to grow 150 from US$230 Million in 2018 to US$946 Million by 2023 (ASDR) 113 • Over the period from 2018 to 88 2022, the VRFB market is 69 anticipated to expand at a CAGR of 52 60% (Orbis

  21. Slide 21: Vanadium Redox Battery Storage Development

    Vanadium Redox Battery Storage Development • Since 2014, 30 large scale VRFB projects, across 11 countries, • Power ranges from 10’s of kW’s up to 200mW (U.S. Department of Energy’s Global Energy Storage Database) • World’s largest planned chemical battery – 200MW/800MWh vanadium redox flow battery

  22. Slide 22: Installed Vanadium Redox Flow Batteries

    Installed Vanadium Redox Flow Batteries

  23. Slide 23: Vanadium vs Lithium for Energy Storage Is No Contest

    Vanadium vs Lithium for Energy Storage Is No Contest • Non-flammable • Excellent re-chargeabilty • Easily refurbish by replacing electrolyte • Up to 10,000 cycles vs max 1,000 cycles for Li-Ion • Maintain 90% of their storage capacity over 20 years • Suitable for large scale energy storage ▪ Wind fa

  24. Slide 24: ASX: PUR

    ASX: PUR Jeremy Read Managing Director Email: Jeremy@pursuitminerals.com.au Mobile: + 61 447 379 744

Pursuit Minerals — Investor Presentation (September 2018) on 6ix