Aura Energy Ltd · ASX:AEE

Aura Energy — Non-Deal Roadshow (April 2011)

28 slides from Aura Energy's roadshow presentation, Apr 13, 2011

  1. Slide 1: URE Roadshow Presentation

    URE Roadshow Presentation Presented by Dr Bob Beeson sweden For personal use only west africa australia 13 – 14 April 2011

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement For personal use only o This presentation has been prepared to provide information on Aura Energy Limited’s projects. It is not intended as an offer, invitation solicitation or recommendation with respect to the purchase or sale of any securities. o This pres

  3. Slide 3: Corporate

    Corporate For personal use only ASX Code: AEE Share Price: 37c (11 April 2011) Market capitalisation: A$49 M Cash position: $6.4 M (Dec 2010) Shares: 132.1 M Main shareholders: Board & Management 4.3% Drake Resources 4.6% Technical Investing Pty Ltd 6.8% Kinetic Investment Partners 6.9% 3

  4. Slide 4: Share Price History

    Share Price History For personal use only 0.6 0.5 0.4 0.3 0.2 0.1 0 12-Apr-10 12-May-10 12-Jun-10 12-Jul-10 12-Aug-10 12-Sep-10 12-Oct-10 12-Nov-10 12-Dec-10 12-Jan-11 12-Feb-11 12-Mar-11

  5. Slide 5: Experienced Management Team

    Experienced Management Team For personal use only Dr. Bob Beeson – Managing Director Bob is a professional geologist with over 35 years of experience in mineral exploration and development. He has held senior management positions with Billiton Australia, Acacia Resources, North Limited and New Hampt

  6. Slide 6: Advanced Projects on two continents

    Advanced Projects on two continents For personal use only Häggån & Kallsedet Projects, Sweden Mauritania, West Africa Niger, West Africa Wondinong, Australia 6

  7. Slide 7: What's Happened & What's Planned

    What’s Happened & What’s Planned 2010 For personal use only o major initial resource defined at Häggån, Sweden o high uranium recoveries from initial tests at Häggån o second phase of bio-heap leach tests commenced o drilling confirms uranium in greenfield Reguibat province Mauritania o increased la

  8. Slide 8: Sweden Main Projects

    For personal use only Sweden Main Projects 8 Häggån Project, Sweden

  9. Slide 9: Sweden: Mining Friendly

    Sweden: Mining Friendly o historic culture of mining For personal use only o low corporate tax rate & royalties o Europe’s largest copper mine & biggest iron ore producer o legislation & regulations very supportive of mining o excellent infrastructure o nuclear power – 50% of electricity needs 9

  10. Slide 10: LARGE Resource, GIANT Uranium Field

    LARGE Resource, GIANT Uranium Field For personal use only o 100% project ownership o every drill hole in 18 km2 Häggån permit intersected mineralisation o selected intercepts include: o 178m @ 175 ppm U₃O₈ o 180m @ 160 ppm U₃O₈ o 192m @ 171 ppm U₃O₈ o 226m @ 160 ppm U₃O₈ o 115m @ 188 ppm U₃O₈ 10

  11. Slide 11: Potential Co-production – Enhanced Value

    Potential Co-production – Enhanced Value For personal use only o 291 million pounds U₃O₈ in Aura’s initial inferred resource with 0.81Bn tonnes @ grade – 162 ppm U₃O₈ o Plus co-products - molybdenum (361 Mlbs) - nickel (353 Mlbs) - zinc (496 Mlbs) - vanadium (2940 Mlbs) o equivalent uranium grade ap

  12. Slide 12: Largest Undeveloped Uranium Resources

    Largest Undeveloped Uranium Resources For personal use only Rank Project Company Mlbs Grade (%) Location 1 Viken Continental 1047 0.02 Sweden 2 Elkon ARMZ 705 0.12 Russia Rossing 3 Extract 367 0.05 Namibia South 4 Cigar Lake Cameco/Areva 352 18.2 Canada 5 Imouraren Areva 350 0.11 Niger 6 Jabiluka ER

  13. Slide 13: Low Mining Cost

    Low Mining Cost For personal use only o thick, flat-lying, continuous bodies with >200 ppm U3O8 o near-surface, low cost open-pit mining o Continental Precious Minerals scoping studies estimate: o waste to ore ratio of 0.5:1 o mining costs of approx US$2.50 -3.00/t ore 13

  14. Slide 14: High Recoveries

    High Recoveries For personal use only Conventional acid leach o conventional tests give high 93% recoveries of uranium o second phase of work addressing reagent management Bioleaching o Parker Centre/CSIRO initial bio-heap leach increases extraction of uranium, molybdenum, nickel & zinc o next stage

  15. Slide 15: Animation – bio-heap leaching process

    For personal use only animation – bio-heap leaching process 15

  16. Slide 16: Existing Talvivaara Project in Finland Analogue

    For personal use only Existing Talvivaara Project in Finland Analogue o Talvivaara, Finland uses bioleach to recover: 0.8 Mlbs pa from 17ppm U3O8 ore o recent Cameco funding & offtake agreement o Talvivaara, Finland modern mine based on shales o mining 24Mtpa ore (US$2.60/t) Talvivaara Project, Finl

  17. Slide 17: Next Steps: Häggån

    Next Steps: Häggån For personal use only o second phase of drilling on western part of project completed o assay results expected 2nd quarter o ongoing metallurgical testwork o scoping study 17

  18. Slide 18: West Africa Main Projects

    For personal use only West Africa Main Projects Mauritania - SNIM Iron Ore Operation 18

  19. Slide 19: Strong Position in Mauritania

    Strong Position in Mauritania For personal use only o long-term existing mining operations o supportive government o Aura in Mauritania ‒ successful project identification & acquisition ‒ greenfield discovery of significant new uranium field ‒ 100% properties plus 2 joint venture permits ‒ major pla

  20. Slide 20: 2011 Resource Drilling Completed

    2011 Resource Drilling Completed For personal use only o built on previous drilling where mineralisation showed average grade of 320ppm U3O8 o 2,169 holes totalling over 9,100 metres (2,022 Reguibat Project) o mineralisation 2-4m thick o supports exploration target of 40-60 Mlbs U3O8 at an average g

  21. Slide 21: High Grade Intercepts

    High Grade Intercepts For personal use only o extensive mineralisation 1-8 m thick starting at surface o high grade results o selected intercepts o 10m @ 2000 ppm U3O8 o 4.5m @ 1863 ppm U3O8 o 2.5m @ 1859 ppm U3O8 o 2.5m @ 1787 ppm U3O8 o 3m @ 1417 ppm U3O8 o 3m @ 1312 ppm U3O8 o on track to release

  22. Slide 22: High Quality Resource Potential

    High Quality Resource Potential For personal use only o Reguibat exploration target* very competitive on size & grade o potential grade separates Reguibat from many calcrete projects * This target is conceptual in nature (the potential quantity and grade of this target is conceptual in nature, that

  23. Slide 23: Why Invest in Aura?

    Why Invest in Aura? For personal use only  on track & fully delivering on company strategy  focus on 2 key projects: Sweden & West Africa o Sweden, Häggån: expanded JORC resource – one of the world’s largest uranium resources plus multi-metal upside o Mauritania, Reguibat: excellent assay results

  24. Slide 24: www.auraenergy.com.au

    For personal use only www.auraenergy.com.au 24

  25. Slide 25: Inferred Resource Statement Häggån

    Inferred Resource Statement Häggån For personal use only Cutoff Size U3O8 MoO3 V2O5 Ni Zn U3O8 ppm (BT) ppm ppm ppm ppm ppm 100 0.81 162 325 2616 318 448 Size in billions of tonnes and grades of the initial resources for the Häggån Project at 100ppm cut-off grade Aura recognises the requirement to d

  26. Slide 26: The ever-growing need for energy

    The ever-growing need for energy For personal use only 26

  27. Slide 27: The reducing contribution of oil

    The reducing contribution of oil For personal use only 27

  28. Slide 28: Meeting Growing Uranium Demand

    Meeting Growing Uranium Demand For personal use only o 442 reactors in operation with another 541 planned or in construction o nuclear power most feasible source of commercial CO2 free energy o Uranium price steadily increasing currently: US $66.5/lb 28 World Uranium Reactors Under Construction