PT Wijaya Karya Beton Tbk · IDX:WTON

PT Wijaya Karya Beton Tbk — Q3 2017 Earnings Presentation

53 slides from PT Wijaya Karya Beton Tbk's earnings presentation, 2017

  1. Slide 1: PT Wijaya Karya Beton Tbk 3Q 2017

    Slide 1: PT Wijaya Karya Beton Tbk 3Q 2017

    PT Wijaya Karya Beton Tbk 3Q 2017 1

  2. Slide 2: Company Profile

    Slide 2: Company Profile

    COMPANY PROFILE www.wikabeton.co.id

  3. Slide 3: Vision & Mission

    Slide 3: Vision & Mission

    VISION & MISSION VISION MISSION “To be the foremost precast concrete company in ➢ Providing excellent & competitive products and services in engineering, production, and installation (EPI) In EPI and fulfill the expectation of customers. Southeast Asia.” ➢ Providing added value through business proc

  4. Slide 4: Shareholders

    Slide 4: Shareholders

    SHAREHOLDERS 11.22% 0.99% 6.93% 0.99% PT Wijaya Karya (Persero) Tbk 4.33% 4.33% Koperasi Karya Mitra Satya Yayasan Wijaya Karya Treasury Stock 8 April 2014 23.47% Public 31 Des 2017 27.75% (IPO) 60.00% 60% Foreign Local 17,7% 17,5% 16,5% 19,4% 19,5% 18,9% 19,8% 19,9% 19,0% 20,4% 33,0% 22,1% 26,0% 19

  5. Slide 5: Corporate Structure

    Slide 5: Corporate Structure

    CORPORATE STRUCTURE WTON WTON WTON 51.0% 99.5% 60. % Associated Company : WTON 49.0% 5

  6. Slide 6: Management Corporate

    Slide 6: Management Corporate

    MANAGEMENT CORPORATE Hadian Pramudita Kuntjara Hari Respati Siddik Siregar Mursyid Mohammad Syafii Sidiq Purnomo President Director Operation Director I Operation Director II Operation Director III Human Capital & Financial Director Independent Director Business Development Director Gandira Gutawa S

  7. Slide 7: Coverage Area

    Slide 7: Coverage Area

    COVERAGE AREA 14 FACTORIES, 1 MOBILE PLANT 3 SUBSIDIARIES 6 SALES AREA 3 QUARRY PLANT, 1 ASSOCIATED 2 REPRESENTATIVE OFFICE COMPANY Installment Capacities 3.0 million ton per year 7

  8. Slide 8: Production Capacities

    Slide 8: Production Capacities

    PRODUCTION CAPACITIES BATCHING PLANT FACTORIES LAND AREA LINES 46 UNIT North Sumatra 5.0 Ha 6 Lampung 6.1 Ha 5 South Lampung 31.3 Ha 4 Bogor 13.2 Ha 8 Karawang 13.8 Ha 4 Subang 50.0 Ha 2 Majalengka 6.5 Ha 3 Boyolali 4.1 Ha 6 Pasuruan 1 6.9 Ha 5 Pasuruan 2 6.0 Ha 2 South Sulawesi 1 3.0 Ha 3 South Sul

  9. Slide 9: Sustainability Innovation

    Slide 9: Sustainability Innovation

    SUSTAINABILITY INNOVATION 12 14 10 2016 2018 2014 • Launching track • Launch PCCP 8 PC Cylinder Piles with slab for railway (Prestress Concrete 2009 diameter up to 2,000mm • Launching Circular Cylinder Pipe) with • The first manufacturer to produce and maximum length of Box Girder with Diameter up t

  10. Slide 10: Strategic Business Unit: Centrifugal Product

    Slide 10: Strategic Business Unit: Centrifugal Product

    STRATEGIC BUSINESS UNIT CENTRIFUGAL PRODUCT PC POLES PC PILES PC CYLINDER PILE PC WALL PC PIPES 10

  11. Slide 11: Strategic Business Unit: Non-Centrifugal Product (1/2)

    Slide 11: Strategic Business Unit: Non-Centrifugal Product (1/2)

    STRATEGIC BUSINESS UNIT NON-CENTRIFUGAL PRODUCT (1/2) BRIDGE CONCRETE RAILWAY CONCRETE TUNNEL HOLLOW CORE SLAB 11

  12. Slide 12: Strategic Business Unit: Non-Centrifugal Product (2/2)

    Slide 12: Strategic Business Unit: Non-Centrifugal Product (2/2)

    STRATEGIC BUSINESS UNIT NON-CENTRIFUGAL PRODUCT (2/2) RETAINING WALL BUILDING AND HOUSING CONCRETE MARINE CONCRETE QUARRY & CRUSHING PLANT 12

  13. Slide 13: Strategic Business Unit: Services

    Slide 13: Strategic Business Unit: Services

    STRATEGIC BUSINESS UNIT SERVICES POST-TENSION INNER BORE 13

  14. Slide 14: Production Capacity 2008-2018

    Slide 14: Production Capacity 2008-2018

    PRODUCTION CAPACITY 2008-2018 ▪ Currently WIKA Beton Installed Production Capacities approximately 3 million ton per year. ▪ WIKA Beton’s installed production capacity is expected to grow 210% from 2008 – 2018. Production Installment Capacities (Millions Ton per year) 3,3 3,0 2,5 2,3 2,2 2,0 1,9 1,6

  15. Slide 15: Customer Profile

    Slide 15: Customer Profile

    CUSTOMER PROFILE ▪ Based on Business Line, Infrastructure sector contributed 72.8% Customer Profil based on Business Line in 3Q 2017 of total WIKA Beton’s new contract in 2016. (Percentage from New Contract) ▪ Based on Customer’s Ownership, WIKA Beton’s Highest Revenue Properties Mining 3.0% 1.0% Co

  16. Slide 16: Elevated Railway Project – North Sumatera

    Slide 16: Elevated Railway Project – North Sumatera

    COMPANY UPDATE ELEVATED RAILWAY PROJECT – NORTH SUMATERA • Elevated Railway was connected 2 cities between Medan - Kualanamu (International Airport) along 8,05 km. • Main Product : Box Girder with Span by Span for Installment Method. • Start From December 2015 and target finish on August 2018. 16

  17. Slide 17: Semanggi Flyover Revitalization Project - Jakarta

    Slide 17: Semanggi Flyover Revitalization Project - Jakarta

    COMPANY UPDATE SEMANGGI FLYOVER REVITALIZATION PROJECT - JAKARTA • The First Bending Bridge Precast in Indonesia with the longest span reach to 80 m long • Start in April 2016 and finished at July 2017 (2 months earlier than estimated schedule) • Semanggi Flyover inaugurated on August 17th, 2017 by

  18. Slide 18: MRT Project - Jakarta

    Slide 18: MRT Project - Jakarta

    COMPANY UPDATE MRT (MASS RAPID TRANSIT) PROJECT - JAKARTA • This Project used our Precast Components for whole underground side • WIKA Beton supplied 2½ packages from 3 packages elevated total. • The First Precast Tunnel in Indonesia. • This Project has been started since 2014 and estimate finish on

  19. Slide 19: JLNT Ciledug Project - Jakarta

    Slide 19: JLNT Ciledug Project - Jakarta

    COMPANY UPDATE JLNT (NON-TOLL ELEVATED WAY) CILEDUG PROJECT - JAKARTA • Compiled from Box Girder in Ciledug to Tendean area in Jakarta • The Project started from February 23th, 2015 dan Finished at January 30th, 2017 19

  20. Slide 20: Automated People Mover System Skytrain

    Slide 20: Automated People Mover System Skytrain

    COMPANY UPDATE AUTOMATED PEOPLE MOVER SYSTEM (APMS) SKYTRAIN INTERNATIONAL AIRPORT SOEKARNO HATTA, JAKARTA • APMS (Automated People Mover System) have 2 phases, for first phase is connecting Terminal 2 to Terminal 3. • U Girder was the most Precast Product be used and WIKA Beton support other Precas

  21. Slide 21: LRT Corridor I - Jakarta

    Slide 21: LRT Corridor I - Jakarta

    COMPANY UPDATE LRT (LIGHT RAPID TRANSIT) CORRIDOR I - JAKARTA • Corridor I was connecting Kelapa Gading to Velodrome, Jakarta along 5,8 km. • Target Finish on December 2017 21

  22. Slide 22: St. Carolus Hospital - Jakarta

    Slide 22: St. Carolus Hospital - Jakarta

    COMPANY UPDATE ST. CAROLUS HOSPITAL - JAKARTA • The First full-precast with Earthquake Resistant Hospital Buliding in Indonesia. • While the construction proceed, barely undisturbly hospital’s activities from beginning construction until topping off done. • This Construction have 2 phases, 1st phase

  23. Slide 23: National Capital Integrated Coastal Development (1/2)

    Slide 23: National Capital Integrated Coastal Development (1/2)

    COMPANY UPDATE NATIONAL CAPITAL INTEGRATED COASTAL DEVELOPMENT 2ND PHASE FOR PACKAGE 2 (1/2) • WIKA Beton be responsible for 2nd Phase For Package. • This Project using Cylinder Pile with length 24 m diameter 1200 mm 23

  24. Slide 24: National Capital Integrated Coastal Development (2/2)

    Slide 24: National Capital Integrated Coastal Development (2/2)

    COMPANY UPDATE NATIONAL CAPITAL INTEGRATED COASTAL DEVELOPMENT 2ND PHASE FOR PACKAGE 2 (2/2) • Installation of Cylinder Pile products in field using Inner Boring system. • WIKA Beton is the only one who using Inner Bore technology in Indonesia. 24

  25. Slide 25: Balikpapan – Samarinda Toll Road

    Slide 25: Balikpapan – Samarinda Toll Road

    COMPANY UPDATE BALIKPAPAN – SAMARINDA TOLL ROAD • Highway from Balikpapan to Samarinda, length: 99 km • This project start from Year 2015 and finish target in the end of Year 2018. • WIKA Beton supply Ready Mix, Precast Product and service 25

  26. Slide 26: Bogor Outer Ring Road

    Slide 26: Bogor Outer Ring Road

    COMPANY UPDATE BOGOR OUTER RING ROAD • WIKA Beton supply Median Concrete Barrier and Box Girder 26

  27. Slide 27: Update News: Pabrik Subang

    Slide 27: Update News: Pabrik Subang

    UPDATE NEWS PABRIK SUBANG • Factory Capacities: 258.000 ton • Product : Box Girder 27

  28. Slide 28: Established of Associate Company

    Slide 28: Established of Associate Company

    UPDATE NEWS ESTABLISHED OF ASSOCIATE COMPANY Inauguration of Establishment of Associate • Cimanggis Apartment Project, East Company, PT Wijaya Karya Pracetak Building Jakarta on January 17th, 2017 28

  29. Slide 29: Financial Highlight

    Slide 29: Financial Highlight

    FINANCIAL HIGHLIGHT www.wikabeton.co.id

  30. Slide 30: Total Contract, Sales, Earning After Tax

    Slide 30: Total Contract, Sales, Earning After Tax

    TOTAL CONTRACT, SALES , EARNING AFTER TAX OrderBook 11.038.209 NEW CONTRACT 2017 7,117,978 CARRY OVER 1.912.718 SALES Order Book 5.090.000 EARNING AFTER TAX 7.517.708 5.996.988 (dalam Jutaan Rp) Target 2017 7.002.718 Order Order Order 5,118,401 Book Book Book Order Book 4.303.959 4.236.771 4.279.812

  31. Slide 31: Revenue Contribution

    Slide 31: Revenue Contribution

    SIA AO Tee EAE AE KING BO rae Ae REVENUE CONTRIBUTION — 38#TON TS S| 2011 2012 2013 | 2014 2015 3Q2016 3Q2017 mServices 0.9% 0.7% 0.8% | 15% 2.3% 3.4% 8.8% Non-Centrifugal Product) 27.2% 31.2% 38.7% | 29.1% 36.9% 42.5% 38.5% Centrifugal Product 71.9% 68.2% 60.5% | 69.4% 60.8% 54.1% 52.7% | = ee ell

  32. Slide 32: Income Statement Summary

    Slide 32: Income Statement Summary

    SIA AO Tee EAE AE KING BO rae Ae INCOME STATEMENT SUMMARY @8&TON Inevovettion and Tins Revenue (Rp Billion) Gross Profit (Rp Billion) 487 2011 2012 2013 2014 2015 2016 302016 302017 2011 2012 «©2013 «2014S «2015. = 2016 |= 30.2016 302017 Operating Profit (Rp Billion) Net Profit (Rp Billion) 346 223

  33. Slide 33: Financial Position Summary

    Slide 33: Financial Position Summary

    FINANCIAL POSITION SUMMARY 33

  34. Slide 34: Consolidated Cash Flow

    Slide 34: Consolidated Cash Flow

    CONSOLIDATED CASH FLOW Description 2011 2012 2013 2014 2015 3Q 2016 3Q 2017 Operation Activities 135,160 293,848 123,764 192,010 458,415 (79,247) 107,763 Investment Activities (162,239) (174,250) (454,305) (790,214) (472,119) (246,558) (433,249) Financing Activities (34,141) (4,999) 403,249 1,186,27

  35. Slide 35: Financial Ratio & Profitability

    Slide 35: Financial Ratio & Profitability

    FINANCIAL RATIO & PROFITABILITY Return on Asset (ROA) and Return on Equity (ROE) 33,6 29,7 33,0 ROA (%) 14,5 8,5 7,2 ROE (%) 7,5 7,9 7,5 8,3 8,5 3,8 3,9 3,4 2011 2012 2013 2014 2015 3Q 3Q 2016 2017 35

  36. Slide 36: Financial Ratio

    Slide 36: Financial Ratio

    FINANCIAL RATIO Debt To Equity Ratio (DER) DER Gearing Ratio (Equity) 3,3 3,0 3,0 0,9 1,5 0,9 0,74 0,48 0,7 1,0 2011 2012 2013 2014 2015 2016 3Q 3Q 0,27 2016 2017 0,27 0,04 0,03 0,27 0,24 2011 2012 2013 2014 2015 2016 3Q 3Q 2016 2017 36

  37. Slide 37: Analyst Report

    Slide 37: Analyst Report

    ANALYST REPORT Target Price No Analyst Company Recommendation Date (IDR) 1 Arief Budiman Ciptadana Sekuritas 910 Buy 9 Jan 2018 2 Bob Setiadi Mandiri Sekuritas 750 Buy 9 Jan 2018 3 Danny Eugene Mega Capital Sekuritas 1,575 Buy 9 Jan 2018 4 Revita Dhiah Anggrainy Binaartha Sekuritas 775 Buy 7 Des 201

  38. Slide 38: Corporate Assessment

    Slide 38: Corporate Assessment

    CORPORATE ASSESSMENT DESCRIPTION 2013 2014 2015 2016 Final Audit SM ISO (Assesor : LRQA) 968 962 963 963 GCG Score (Assesor : BPKP) 75.75 87.73 87.16 87.16 Key Performance Indicator - 886 808 873.8 Engagement Level 69.6 91.0 82.0 86.0 (Corporate) (AON Hewitt) (Corporate) (AON Hewitt) Risk Level Matu

  39. Slide 39: Achievement & Award (1/2)

    Slide 39: Achievement & Award (1/2)

    ACHIEVEMENT & AWARD (1/2) Credit Rating Index Saham Morgan Stanley Capital Index Index Saham Syariah Started on Nov 7th, 2014 - Desember 2014 - Sekarang Rating History : Sekarang July 2013 idA+/Stable * July 2014 idA+/Stable * July 2015 idA+/Stable July 2016 idA+/Stable July 2017 idA+/Stable August

  40. Slide 40: Achievement & Award (2/2)

    Slide 40: Achievement & Award (2/2)

    ACHIEVEMENT & AWARD (2/2) The Best in Building and Top 50 Best of Managing Corporate Image The Best 2016 & 2017 Indonesia from Companies Tempo Group & Frontier dari Forbes Indonesia 2017 As a constituent of Suistainable Responsible Investment (SRI-Kehati) Index for periods of May 2017 – Oct 2017 fro

  41. Slide 41: Achievement & Award (2/2)

    Slide 41: Achievement & Award (2/2)

    ACHIEVEMENT & AWARD (2/2) Anugerah BUMN AWARD Bronze Winner in the 2017 Category of Brand Strategy 2ND Winner and Bronze Winner in the Best Stategy Development Category of International Marketing & Sales in BUMN Branding & Marketing Award 2017 Top 50 Public Companies from Indonesian Institute for Co

  42. Slide 42: End of Presentation

    Slide 42: End of Presentation

    #2 BETON Innovation and Trust (2) BETON END OF PRESENTATION

  43. Slide 43: Kapasitas Produksi

    Slide 43: Kapasitas Produksi

    KAPASITAS PRODUKSI 1. North Sumatera : 337.000 ton 2. Lampung : 214.000 ton 3. Bogor : 616.000 ton 4. Majalengka : 127.000 ton 5. Boyolali : 225.000 ton 6. Pasuruan : 451.000 ton 7. South Sulawesi : 210.000 ton 8. Karawang : 255.000 ton 9. South Lampung : 142.000 ton 10. Batam : 130.000 ton 11. Suba

  44. Slide 44: Infrastructure Investment Requirement 2015-2019

    Slide 44: Infrastructure Investment Requirement 2015-2019

    INFRASTRUCTURE INVESTMENT REQUIREMENT 2015-2019 LOCAL STATE STATE PRIVATE SECTOR GOVERNMENT OWNED TOTAL BUDGET1 LOCAL3 BUDGET ENTERPRISE2 Road 340.0 200.0 65.0 200.0 805.0 Railway 150.0 - 11.0 122.0 283.0 Sea Transportation4 498.0 - 238.2 163.8 900.0 Air Transportation 85.0 5.0 50.0 25.0 165.0 Land

  45. Slide 45: Key Milestone (1/2)

    Slide 45: Key Milestone (1/2)

    KEY MILESTONE (1/2) WIKA Beton as Division of WIKA 1988 • Established new concrete factory in Binjai, North Sumatera (6th factory). • New products: bridge and drainage concretes. 1981 - 1984 • Established new concrete factories in Pasuruan (2nd factory), Boyolali (3rd factory), and Majalengka (4th f

  46. Slide 46: Key Milestone (2/2)

    Slide 46: Key Milestone (2/2)

    2016 • Starting Readymix KEY MILESTONE (2/2) Concrete Bussiness . • Established associate WIKA Beton as Subsidiary of WIKA company, WIKA Pracetak Gedung. • Launching PC WALL with length up to 2014 24.6 m • Listed company at IDX 08 April 2014. • Aquisition PT Citra Lautan Teduh in Batam. • Unit Inner

  47. Slide 47: Performance Targets 2017-2021

    Slide 47: Performance Targets 2017-2021

    PERFORMANCE TARGETS 2017-2021 Revenue 2021 11,3 Tn Total Capex 2017-2021 3,6 Tn Profit After Tax 2021 974 Bn www.wika-beton.co.id 48 Innovation and Trust

  48. Slide 48: Pembangunan Infrastruktur Jokowi 2015 - 2019

    Slide 48: Pembangunan Infrastruktur Jokowi 2015 - 2019

    Pembangunan Infrastruktur Jokowi 2015 - 2019 Miangas Source : Bappenas Infografis : Andhika Akbarsyah Maratua Pohuwato Singkawang Muara Teweh Tojo Una-una Enggano Kertajati Aboy Korowai • New Road 2.650 Km • Tol Road 1.000 Km • Cosntruction of BRT di • Establish 24 New Port • Maintainance Road 46.77

  49. Slide 49: Infrastructure Investment Requirement 2015-2019

    Slide 49: Infrastructure Investment Requirement 2015-2019

    INFRASTRUCTURE INVESTMENT REQUIREMENT 2015-2019 www.wika-beton.co.id 50 Innovation and Trust

  50. Slide 50: Largest Capacity and Leading Market Share

    Slide 50: Largest Capacity and Leading Market Share

    LARGEST CAPACITY and LEADING MARKET SHARE ▪ Based on internal research, in 2017, there are 57 precast concrete production facilities in Indonesia with total production capacity of 24.5 million ton per year. ▪ WIKA Beton has the biggest production capacity with 35.6% of total production capacity in I

  51. Slide 51: Infrastructure Investment Requirement (RPJMN) 2015-2019

    Slide 51: Infrastructure Investment Requirement (RPJMN) 2015-2019

    INFRASTRUCTURE INVESTMENT REQUIREMENT 2015-2019 Infrastructure Investment Requirement (RPJMN) 2015-2019 (Rp trillion) Full Partial Scenario(75%) Basic Scenario(50%) Sector Scenario % of Full (100%) Needs % of Full Scenario Needs Scenario Road 1274 851 67% 637 50% Railway 278 222 80% 140 50% Mass Tra

  52. Slide 52: Capital Expenditure 2015-2017

    Slide 52: Capital Expenditure 2015-2017

    CAPITAL EXPENDITURE 2015-2017 Projection Realization 682.182 Usage 528.573 503.595 425.492 358.174 355.576 95.3 % 84.2 % 52.1 % 2015 2016 Sep 2017 www.wika-beton.co.id 53 Innovation and Trust

  53. Slide 53: Permintaan Industri Precast di Negara-Negara Dunia

    Slide 53: Permintaan Industri Precast di Negara-Negara Dunia

    Permintaan Industri Precast di Negara- Negara Dunia 30 % 26 % 90 % 18 % 60 % 2014 2017 2019 57 76 ? Factories Factories Target 30 % 24.5 35.1 2019 Million Million ? Ton Ton 26 % 2017 INA NED FIN Source: AP3I

Source: company website