  1. Slide 1: Berrima Colliery – Closure Working Group Meeting #12

    Click to edit Master title style Subheader Berrima Colliery – Closure Working Group Meeting #12 10 December 2021

  2. Slide 2: Agenda

    Agenda 1. Welcome and Apologies - Introductions 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Water Quality Results update - Greg Johnson 5. Water treatment update- Greg Johnson/David Spears 6. Pit top treatment and pipeline EPL EIP & REF – Greg Johnson, EPA, Rob B

  3. Slide 3: Welcome and Apologies

    01 Welcome and Apologies

  4. Slide 4: CWG Representatives, Apologies & Guests

    CWG Representatives, Apologies & Guests ● Boral - Girish Yadwad, Greg Johnson, David Spears, Kate Woodbridge ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority - William Dove, Andrew Couldridge (apology), ● WaterNSW - Ravi Sundaram ● Wingecarribee Shire Council

  5. Slide 5: Terms of Reference – Code of Conduct

    02 Terms of Reference – Code of Conduct

  6. Slide 6: Terms of Reference – Code of Conduct

    Terms of Reference – Code of Conduct 6

  7. Slide 7: Review of minutes and actions

    03 Review of minutes and actions

  8. Slide 8: Review of Minutes – suggested amendments

    Review of Minutes – suggested amendments 8

  9. Slide 9: Review of minutes - actions

    Review of minutes - actions Summary of Meeting Actions: 1 Tony McCormick to write to Boral on behalf of Terry Renahan to commence negotiations in relation to property access to undertake environmental investigations. 2. Boral to seek advice from Dr lan Wright in relation to river monitoring as part

  10. Slide 10: Water Quality Results Update

    04 Water Quality Results Update

  11. Slide 11: Surface Water Monitoring Update

    Surface Water Monitoring Update 11

  12. Slide 12: Water Quality Guidelines

    Water Quality Guidelines In order to interpret and give context to the water quality monitoring results from the Colliery we are now including details, where applicable, against the Australian Water Quality Guidelines for Freshwater Protection, Australian Water Quality Guidelines – Primary Industry

  13. Slide 13: Adit discharge update – Volume, pH & EC

    Adit discharge update – Volume, pH & EC Volume discharged – 1.7 ML per day (av.) pH – dosing is continuing EC – trending below 1000uS/cm 13

  14. Slide 14: Adit discharge update – Iron & Manganese

    Adit discharge update – Iron & Manganese Iron – Continues to remain low Manganese – remaining low 14

  15. Slide 15: Adit discharge update – Nickel and Zinc

    Adit discharge update – Nickel and Zinc Nickel – stabilised to levels seen during mining. Zinc – stabilised to levels seen during mining. Commentary – Lime dosing has had the desired effect on slightly raising the pH while reducing Ni and Zn to historical levels. Aeration is the key driver to manage

  16. Slide 16: River Quality Update

    River Quality Update BCRAL ©

  17. Slide 17: River quality update – pH & EC

    River quality update – pH & EC Note: we no longer are required to monitor at the 100m, 1km, 2km or 3km points downstream pH – No influence in river at Biloela (6km) EC – No influence in river at Biloela (6km) 17

  18. Slide 18: River quality update – iron & manganese

    River quality update – iron & manganese Iron – Levels remain low, discharge concentrations are below usual river levels. Manganese – Low levels continue to be recorded in the river 18

  19. Slide 19: River quality update – Nickel and Zinc

    River quality update – Nickel and Zinc Nickel – Discharges influencing levels within mixing zone, river is well below 95% protection down stream. Zinc – Levels below 95% protection downstream. 19

  20. Slide 20: River quality update – Sulphate and commentary

    River quality update – Sulphate and commentary Copper – Below stock drinking levels. Other sources influencing. Sulphate – Discharges influencing downstream, however, well below any trigger points. 20

  21. Slide 21: Water Treatment Update

    OS Water Treatment Update eee

  22. Slide 22: Water treatment update

    Water treatment update • The temporary lime dosing system remains in place, to raise the pH of mine water discharge. • Dosing rate has been successful in raising pH from 6.5 to 7.2. • The mine water quality behind the bulkheads remains low, the underground water treatment system remains in operation

  23. Slide 23: Bulkhead water level update

    Bulkhead water level update Discharge averaged has slightly increased to 1.85ML/day between September 2021 and December 2021. The water level behind the bulkheads has been remained a reasonably constant height for the last quarter though the underground mine water treatment pumping system. 23

  24. Slide 24: Pit Top Treatment & Pipeline EPL EIP & Review of Environmental Factors

    06 Pit Top Treatment & Pipeline EPL EIP & Review of Environmental Factors

  25. Slide 25: Review of Environmental Factors – Process and Input

    Review of Environmental Factors – Process and Input As part of the EIP within the EPL we are required to complete an environmental assessment via a Review of Environmental Factors (REF) Rob Byrnes will be assisting Boral the prepare the assessment and will discuss the process. We are also seeking co

  26. Slide 26: Tip Top Treatment and Pipeline – EPL EIP

    Tip Top Treatment and Pipeline – EPL EIP • Following an application by Boral, the NSW EPA have drafted an EIP to be included in the EPL. The proposed licence change includes: Questions/ Comments on Draft Conditions & REF Process/Contents ? 26

  27. Slide 27: Mandemar Lane Update

    07 Mandemar Lane Update

  28. Slide 28: Mandemar Lane update

    Mandemar Lane update Still to resolve access to one property owner to enable final subsidence survey. 28

  29. Slide 29: Communications Update

    8 Communications Update

  30. Slide 30: Communications update: newsletter, video project, community engagement

    • Newsletter – December 2021 newsletter released last week. Distribution limited to CWG members and Berrima PO notice board. • Sustainable Us video project with Wingecarribee Shire Council – Council have asked Boral to participate in a video case study series. The purpose of the project is to educat

  31. Slide 31: General Business

    9 General Business

  32. Slide 32: Next Meeting

    10 Next Meeting Proposed Friday 11 March 2022

  33. Slide 33: Thanks for your participation

    Thanks for your participation 33