Subsea 7 S.a. · OSL:SUBC

Subsea 7 — Investor Presentation (March 2017)

43 slides from Subsea 7's investor presentation, Mar 29, 2017

  1. Slide 1: Seven Arctic – Investor Presentation

    Seven Arctic – Investor Presentation 29th March 2017

  2. Slide 2: Welcome Onboard Seven Arctic

    Welcome Onboard Seven Arctic 29-Mar-17 Page 2

  3. Slide 3: Itinerary

    Itinerary • Welcome presentation – Oeyvind Mikaelsen and Jonathan Tame • Tour of the vessel in three groups • Meet on the Bridge for refreshments and Q&A • 15:45 Bus departs for the airport 29-Mar-17 Page 3

  4. Slide 4: Oeyvind Mikaelsen, EVP Commercial

    Oeyvind Mikaelsen EVP Commercial 29-Mar-17 Page 4

  5. Slide 5: Subsea 7 – In Summary

    Subsea 7 – In Summary Subsea 7 is one of the world’s leading global contractors in seabed-to-surface engineering, construction and services to the offshore industry. We provide technical solutions to enable the delivery of complex projects in all water depths and challenging environments Our vision

  6. Slide 6: 2016 operational highlights

    2016 operational highlights • Consistent and safe operational performance with several large projects successfully completed. • Vessel utilisation 66% full year and 65% fourth quarter – Active vessel utilisation 80% full year, 78% fourth quarter • Affirmed our position in offshore renewable energy •

  7. Slide 7: Our asset investment strategy

    Our asset investment strategy • Modernising and enhancing our fleet is a long-term investment to maintain our competitive lead • Each vessel has been designed to maximise efficiency, capacity and economy of the vessels • Maintain the right fleet size and specification to meet the prevailing market c

  8. Slide 8: Our key attributes differentiate us

    Our key attributes differentiate us • People – Project delivery based on our expertise and know-how • Technology – Market driven and cost-effective solutions • Assets – A diverse fleet of vessels and strategically positioned global assets • Alliances and Partnerships – Collaborating to deliver optim

  9. Slide 9: Investing in a modern and differentiated fleet

    Investing in a modern and differentiated fleet Arrival of Seven Borealis Arrival of Arrival of Arrival of Seven Inagha Seven Waves Seven Sun Seven Arctic Arrival of Arrival of Arrival of Seven Kestrel Seven Falcon Simar Esperanca Seven Rio Seven Cruzeiro Seven Antares 2011 2012 2013 2014 2015 2016 2

  10. Slide 10: Positioning for the Long-Term - Investment

    Positioning for the Long-Term - Investment New-build Vessel Programme • Six vessel new-build programme completed in January 2017 • Total cost <$1.9 billion • Four high-specification flex-lay vessels on long term contracts with Petrobras • Seven Arctic and Seven Kestrel to commence operations in the

  11. Slide 11: Introducing Seven Arctic

    Introducing Seven Arctic • First vessel of its kind in our fleet, unique to our fleet, custom designed • Tiltable lay system that is adaptable to enable suitable approach angle for flex-lay, preventing damage to product at different water depths • Main crane: adaptable operating modes and configurat

  12. Slide 12: 29-Mar-17 Page 12

    29-Mar-17 Page 12

  13. Slide 13: Jonathan Tame, VP Offshore Resources

    Jonathan Tame VP Offshore Resources 29-Mar-17 Page 13

  14. Slide 14: Seven Arctic: Vessel Specification

    Seven Arctic: Vessel Specification Seven Arctic is a construction vessel suitable for worldwide operations, adapted for both tropical and winter environments, capable of operations in water depths up to 3,000m. • Length 162.3m x breadth 32.0m • DP Class III with two engine rooms • 1,000t AHC Offshor

  15. Slide 15: Seven Arctic: Design and Build

    Seven Arctic: Design and Build • The commitment to build such a vessel is based on a sound business case considering the market, Subsea 7’s existing fleet, technology, cost and return on investment. • The project commenced in 2012 with market analysis, specification development and tendering activit

  16. Slide 16: Seven Arctic: Commercial Advantages

    Seven Arctic: Commercial Advantages • Product carrying capability: – 7,000te underdeck is largest in Subsea 7 fleet. – Still have ability to load 4,000 tonnes on deck with underdeck carousel full. – Large uncluttered deck space. • Flexibility in supporting multiple scopes on deck in minimised number

  17. Slide 17: Built by Hyundai Heavy Industries, South Korea

    Seven Arctic - Built by Hyundai Heavy Industries, South Korea (May 2013 – Jan 2017) • HHI, South Korea – the worlds biggest shipyard • SNSD – Special Naval and Ships Division • Huisman – builder of Lay Tower and crane 29-Mar-17 Page 17

  18. Slide 18: Design Phase – Hull Optimisation for Speed

    Seven Arctic: Design Phase – Hull Optimisation for Speed • Pressure Distribution – Original • Pressure Distribution – Version C Hull Lines Hull Lines 29-Mar-17 Page 18

  19. Slide 19: Marin Tank Trials

    Seven Arctic: Marin Tank Trials 29-Mar-17 Page 19

  20. Slide 20: Hull Construction – Optimal for Speed

    Seven Arctic: Hull Construction – Optimal for Speed 29-Mar-17 Page 20

  21. Slide 21: Key Features: Power

    Key Features: Power • Engine Rooms: 2 • Main Engines: 6 x HiMSEN 9H32/40 Power: 4,500kW • Generators: 6 x HHI HSJ7 915-10P Power: 4,220kW • Propulsion: 2 x Controllable pitch propeller shafts Power: 9,200kW • Thrusters: 4 x Tunnel Thruster (2 Fwd, 2 Aft) Power: 2,600kW • Azimuths: 2 x Retractable Az

  22. Slide 22: Configured for Operational Efficiency

    Seven Arctic: Configured for Operational Efficiency 29-Mar-17 Page 22

  23. Slide 23: Multiple Deck options

    Seven Arctic: Multiple Deck options 15t Deck Winch 25t Crane (removable) Boomrest (removable) Deck Tensioner (removable) 100t Crane 20t Crane Tugger’s 1000t Crane 20t Deck Winch Tiltable lay tower 29-Mar-17 Page 23

  24. Slide 24: 600te Tiltable Lay System

    Seven Arctic: 600te Tiltable Lay System • Tensioners: 2 • Dynamic Top Tension: 600t • Primary A&R Capacity: 600t • Primary A&R Wire Length: 3,500m • Secondary A&R Capacity: 200t • Secondary A&R Wire Length: 3,000m • Hang Off Clamp: 600t • PLET Handling System: 50t • Lay System Working Angles: 90o to

  25. Slide 25: TLS Installation

    Seven Arctic: TLS Installation 29-Mar-17 Page 25

  26. Slide 26: Main Crane 1,000t RL KBC

    Seven Arctic: Main Crane 1,000t RL KBC Key Features • Light-weight knuckle boom, to maximise deck coverage and hook height. • High subsea lift capability. • Main Crane • Active Heave Compensation; with high speed – Operates in Single, Double and Triple Fall winches. – Weight: 1825Te • Double crane c

  27. Slide 27: WROV's

    Seven Arctic: WROV’s • Two workclass ROV’s installed in “hangers” • Deployed via cursors, over the side • Operating sea state 5.5m sig wave height • Max operating depth 3000 mtrs 29-Mar-17 Page 27

  28. Slide 28: Work in Hand

    Seven Arctic: Work in Hand • Mid water arch (~165te) and gravity base installation. 165m Water depth. • Well within capacity of 1000te crane in just single fall mode. • Highly weather sensitive scope – normally executed in Summer months, operability of vessel will improve efficiency. • Large availab

  29. Slide 29: Work in Hand - Maersk Culzean

    Seven Arctic: Work in Hand - Maersk Culzean • Structures (range 100-200te) and piling scope. • Well within capacity of 1000te crane in just single fall mode. • Large available deck space minimising number of trips and ability to mobilise for multiple activities. 29-Mar-17 Page 29

  30. Slide 30: Work in Hand - Wintershall Maria Project

    Seven Arctic: Work in Hand - Wintershall Maria Project -Structures, Spools, Flexible product and general construction/ installation scope – wells suited to mission equipment of Seven Arctic. 29-Mar-17 Page 30

  31. Slide 31: Work in Hand - Wintershall Maria Project

    Seven Arctic: Work in Hand - Wintershall Maria Project Crane capability (available capacity, radius and hook height) allows flexibility in deployment – the above spool planned for deployment on vessel starboardside for ease. 29-Mar-17 Page 31

  32. Slide 32: Operations

    Seven Arctic: Operations • Manning levels onboard will vary dependent on the particular project. • Accommodation is available for 132 personnel, in single and two man cabins. • The ship will normally operate at less than that, typically :-  Marine officers and crew 38 - 42  Catering 11 - 13  Oper

  33. Slide 33: Tour highlights / key stations

    Seven Arctic: Tour highlights / key stations • Guests will be divided into groups, led by key personnel from the ship, most of which were involved in the build process. • Areas visited will include :-  Main deck  Below deck carousel and winches  Engine control room, switchboard room and engine ro

  34. Slide 34: Appendix

    subses 7 Appendix 29-Mar-17 Page 34 www.subsea7.com seabed-to-surface

  35. Slide 35: Ulsan, South Korea Shipbuilding in Dry-Dock

    Seven Arctic: Ulsan, South Korea Shipbuilding in Dry-Dock 29-Mar-17 Page 35

  36. Slide 36: Underdeck A&R and Main Crane Storage Winches

    Seven Arctic: Underdeck A&R and Main Crane Storage Winches • Preparations for spooling A&R wires • Main crane storage winch (6,200m wire installed) 29-Mar-17 Page 36

  37. Slide 37: 100mt KBC Installation

    Seven Arctic: 100mt KBC Installation 29-Mar-17 Page 37

  38. Slide 38: Switchboard Rooms and Mission Equipment E-Rooms

    Seven Arctic: Switchboard Rooms and Mission Equipment E-Rooms (Build and After) 29-Mar-17 Page 38

  39. Slide 39: WROV Hanger and Control Room

    Seven Arctic: WROV Hanger and Control Room (Build and After) 29-Mar-17 Page 39

  40. Slide 40: Navigation Bridge & DP Bridge

    Seven Arctic: Navigation Bridge & DP Bridge (Build and After) 29-Mar-17 Page 40

  41. Slide 41: Helideck Installation

    Seven Arctic: Helideck Installation 29-Mar-17 Page 41

  42. Slide 42: Sea Trials - completed in South Korea

    Seven Arctic: Sea Trials - completed in South Korea 29-Mar-17 Page 42

  43. Slide 43: 29-Mar-17 Page 43

    seabed-to-surface www.subsea7.com