Inspiration Mining Corp. · CSE:ISP
Inspiration Mining — Investor Presentation (January 2026)
18 slides from Inspiration Mining's investor presentation, January 2026
Slide 1: Exploring Saskatchewan's Newest Copper-Gold Discovery District
EXPLORING SASKATCHEWAN’S NEWEST COPPER-GOLD DISCOVERY DISTRICT JANUARY 2026 INVESTOR PRESENTATION
Slide 2: Disclaimer
Disclaimer This presentation is strictly confidential and any disclosure, use, copying and The information contained herein has been prepared to assist the recipients in circulation of this presentation is prohibited without the consent of Inspiration Mining making their own evaluation on the Compan
Slide 3: Company overview
Inspiration Mining Corp. is engaged in the business of mineral exploration and the acquisition of mineral property assets in Canada. Inspiration’s flagship projects are the Rottenstone North and Rottenstone West copper-gold projects located in Canada’s newest copper-gold exploration camp and contigu
Slide 4: Rottenstone North+West Projects
ROTTENSTONE NORTH+WEST PROJECTS ROTTENSTONE DOMAIN, SASKATCHEWAN CSE: ISP USA: ISPNF WKN: A40GPX 4
Slide 5: Rottenstone North+West Overview
ROTTENSTONE NORTH+WEST Overview The Rottenstone North (4,512 ha) & Rottenstone West (31,011 ha) gold and base metal properties are located within the Rottenstone Domain, a regional northeast-southwest geological corridor, that includes the past producing Rottenstone nickel-copper-platinum group elem
Slide 6: Ramp Metals Provides Drilling Update at Rush Target
RAMP METALS APRIL 2025 NEWS RELEASE Ramp Metals Provides Drilling Update and Confirms Copper- Rush-001 Massive Sulphide Intersection at 61.50-64.69m Zinc Mineralization at Rush Target depth* Ramp Metals Inc. has confirmed copper-zinc (chalcopyrite and sphalerite) mineralization at its Rush target, i
Slide 7: Ramp Metals Confirms VMS Discovery at Rush Target
RAMP METALS AUGUST 2025 NEWS RELEASE Ramp Metals Confirms VMS Discovery at Rush Target Ramp Metals Inc. has announced that it has received assay results from 10 of 20 holes drilled during its Rottenstone SW Spring 2025 program, confirming the discovery of a substantial copper-zinc VMS system at the
Slide 8: Exploration Plans
ROTTENSTONE NORTH+WEST Exploration Plans Targets defined by a recent AMRT survey are located along trend and parallel to the Rush Discovery corridor, with the strongest anomalies concentrated in the southern part of the Project. Inspiration believes these results represent excellent drill-ready pote
Slide 9: Bentley Project
BENTLEY PROJECT URANIUM – ATHABASCA BASIN, SASKATCHEWAN, CANADA CSE: ISP USA: ISPNF WKN: A40GPX 9
Slide 10: Bentley Project Overview
BENTLEY PROJECT Overview The Bentley Project is comprised of four mineral licenses encompassing a total land area of ~5,710ha (57km2) and is located 75 kilometers northeast of Cameco’s Rabbit Lake mine. The Project sits on a potentially parallel structure to the Collins Bay Conductive trend that hos
Slide 11: Bentley Exploration Targets
BENTLEY PROJECT Exploration Targets The most notable uranium showing on the property is located at the northern tip of the eastern shoreline of an unnamed small lake, ~15.3km to the east-southeast of Bentley Lake's eastern shore. Mineralization is found within a boulder of migmatitic biotite gneiss,
Slide 12: Maraschino Project
MARASCHINO PROJECT URANIUM – THELON BASIN, NUNAVUT, CANADA CSE: ISP USA: ISPNF WKN: A40GPX 12
Slide 13: Maraschino Project overview
The Maraschino Project is comprised of six properties, consisting of 2 primary prospects and 4 pipeline prospects, all possessing compelling exploration opportunities. The region’s first uranium showing was discovered in 1974 within the Baker Lake area in the Thelon Basin, which sparked exploration
Slide 14: Pelly Prospect
PRIMARY PROSPECT A Pelly Prospect The Pelly Prospect comprises 1,366 ha and is located on the Thelon Basin unconformity 145km WNW of Baker Lake. Historic work identified lake sediment geochemical anomalies and uranium showings on the property, with follow-up work identifying VLF basement conductors
Slide 15: Ruby Prospect
PRIMARY PROSPECT B Ruby Prospect The Ruby Prospect comprises 4,057 ha and is located 170km NW of Baker Lake. The prospect covers the northern edge of the Thelon Basin and is underlain by the Archean Amer group consisting of metapelites. A historic airborne magnetic survey identified a single unusual
Slide 16: Meet The Team
Meet The Team Charles Desjardins James Place Lorne McCarthy CEO & PRESIDENT DIRECTOR DIRECTOR Mr. Desjardins brings more than 30 years of Mr. Place is a professional geoscientist Mr. McCarthy has been involved in the Junior public company experience in the areas of (registered in BC) with over 30 ye
Slide 17: Exchanges and Capitalization
Exchanges Management believes that Inspiration is a compelling growth story that merits attention and has significant leverage to any success in the ground. We expect Capitalization 2026 to be a breakout year for Inspiration. - Charles Desjardins, CEO & President Shares Outstanding 42,447,729 CSE: I
Slide 18: Inspiration Mining Corp. contact
Inspiration Mining Corp. 1240-789 W Pender St. Vancouver, BC, V6C 1H2 info@inspirationminingcorp.com inspirationminingcorp.com
Inspiration Mining — Investor Presentation (January 2026) on 6ix