Societatea Energetica Electrica S.A. · BVB:EL

Societatea Energetica Electrica — FY2021 Earnings Presentation

48 slides from Societatea Energetica Electrica's earnings presentation, Mar 4, 2022

  1. Slide 1: Presentation of 2021 financial results

    Slide 1: Presentation of 2021 financial results

    Presentation of 2021 financial results Bucharest, 4 March 2022

  2. Slide 2: Content

    Slide 2: Content

    Content 2021 Financial results 1 ▪ Key Group Information ▪ Distribution Segment Overview o The impact of the electricity market evolution on the distribution segment ▪ Supply Segment Overview o The impact of the electricity market evolution on the supply segment ▪ External electricity network mainte

  3. Slide 3: Summary Consolidated Financials

    Slide 3: Summary Consolidated Financials

    Summary Consolidated Financials Key Group Information Revenues EBITDA Growth and Margin Performance (RON mn) EBITDA (RON mn) and EBITDA Margin (%) 7,179 1,20 0 20. 00% 6,501 14.66% 585 1,00 0 15. 00% 557 800 7.19% 10. 00% 600 -1.78% 5.0 0% 400 953 0.0 0% -5.00% 200 6,594 2,161 124 -10.00% 5,944 (128

  4. Slide 4: Consolidated EBITDA and net result evolution

    Slide 4: Consolidated EBITDA and net result evolution

    Consolidated EBITDA and net result evolution Key Group Information Comments EBITDA (RON mn) The consolidated EBITDA variation 2021 vs. 2020 is RON -1,081 mn, being mostly the cumulated effect of the factors below: ❑ The negative variation of the energy margin RON -881 mn, thereof: • RON -196 mn from

  5. Slide 5: Distribution segment - highlights

    Slide 5: Distribution segment - highlights

    Distribution segment - highlights Distribution segment overview Key figures 2021 Financial results EBITDA decreased by RON 252 mn, mainly due to the evolution of: ▲decrease in energy margins by RON -196 mn, as an effect of: ~3.83 million - ▲ increase in energy revenues RON +198 mn as a result of the

  6. Slide 6: Distribution segment – main aspects

    Slide 6: Distribution segment – main aspects

    Distribution segment overview Distribution segment – main aspects Relevant regulatory aspects: ➢At the beginning of PR4, ANRE made a total negative correction of closing PR3 in amount of RON (730) mn. (nominal terms), respectively RON (665) Distributed energy margin mn. (2018 terms), out of which RO

  7. Slide 7: DEER - TN

    Slide 7: DEER - TN

    DEER - TN Distribution segment overview Key figures 2021 Network losses cost Network losses (RON mn) (GWh) ~1.31 mn 302 619 633 users 70,616 km 34,162 km2 204 voltage lines coverage area 132 RAB: RON 2.0 bn (est.) 167 143 59 5.89 TWh (+6.7%) distributed energy 2020 Q4 2020 2021 Q4 2021 2020 Q4 2020

  8. Slide 8: DEER - TS

    Slide 8: DEER - TS

    Distribution segment overview DEER - TS Key figures 2021 Network losses Network losses cost (RON mn) (GWh) ~1.18 mn 693 692 366 users 58,462 km 34,072 km2 217 voltage lines coverage area 200 RAB: RON 1.8 bn (est.) 226 211 72 6.49 TWh (+4.9%) distributed energy 2020 Q4 2020 2021 Q4 2021 2020 Q4 2020

  9. Slide 9: DEER - MN

    Slide 9: DEER - MN

    DEER - MN Distribution segment overview Key figures 2021 Network losses cost Network losses (RON mn) (GWh) 419 ~1.32 mn users 789 795 273 71,696 km 28,962 km2 223 voltage lines coverage area 236 247 RAB: RON 2.1 bn (est.) 92 6.10 TWh (+5.5%) distributed energy 2020 Q4 2020 2021 Q4 2021 2020 Q4 2020

  10. Slide 10: The financial impact of the electricity market perspectives evolution - distribution

    Slide 10: The financial impact of the electricity market perspectives evolution - distribution

    The impact of the electricity market evolution on the distribution segment The financial impact of the electricity market perspectives evolution - distribution Evolution of the cost of electricity needed to cover NL ❑ In 2021, the cost of electricity needed to cover NL was higher by RON 393.8 mn tha

  11. Slide 11: Electrica Serv (SERV)

    Slide 11: Electrica Serv (SERV)

    Energy services segment - overview Electrica Serv (SERV) General overview Revenues SERV provides repair and other energy-related services to third parties, as well as various services (RON mn) to the companies within the group (vehicles rental, building rental etc.). From 1 December 2020, SERV absor

  12. Slide 12: Supply market

    Slide 12: Supply market

    Supply market Supply segment overview Overall Market Share – November 2021 General overview Electrica The supply market comprises both the competitive segment and the universal service (US) Furnizare and supplier of last resort (SoLR) segment. Before 1 January 2021 – market liberalization, Altii 18.

  13. Slide 13: Supply segment – Electrica Furnizare

    Slide 13: Supply segment – Electrica Furnizare

    Supply segment – Electrica Furnizare Supply segment overview Key figures (2021) Financial results Coverage EBITDA significantly decreased by RON 705.2 mn compared to 2020, mainly following the evolution of the factors below: ▲ revenues increase of RON 757 mn, mainly as a result of the retail sale pr

  14. Slide 14: Supply - key aspects

    Slide 14: Supply - key aspects

    Supply - key aspects Supply segment overview Volume of Electricity Supplied on Retail Market 2021 (TWh) Number of consumption places in 2021 (ths) Competitive Universal Service Competitive Universal Service 9.2 9.3 9.4 3,553 3,583 3,509 269 314 4.3 4.2 5.6 1,556 4,4 4,2 3,284 3,268 3.269 5,1 5,1 3.8

  15. Slide 15: The financial impact of the electricity market perspectives evolution – supply (1/2)

    Slide 15: The financial impact of the electricity market perspectives evolution – supply (1/2)

    The impact of the electricity market evolution on the supply segment The financial impact of the electricity market perspectives evolution – supply (1/2) ❑ As of 31 December 2021, the supply segment recorded a 4.1% increase in the electricity supplied volumes compared to the budget, as a result of t

  16. Slide 16: The financial impact of the electricity market perspectives evolution – supply (2/2)

    Slide 16: The financial impact of the electricity market perspectives evolution – supply (2/2)

    The impact of the electricity market evolution on the supply segment The financial impact of the electricity market perspectives evolution – supply (2/2) Receivables’ analysis ❑ The total value of receivables balance increased by 24.6%, from RON 1,203 mn as of 31 December 2020 to RON 1,499 mn as of

  17. Slide 17: Group liquidity

    Slide 17: Group liquidity

    Group Liquidity Group liquidity ❑ At Group level, the total liquidity available in cash and overdraft limits as of 31 Dec 2021 was RON 322 mn, which is lower with RON 573 mn compared to the previous quarter. The level of cash on 31 Dec 2021 was RON 222 mn. Total liquidity (RON mn) ❑ The increase of

  18. Slide 18: Dividend distribution

    Slide 18: Dividend distribution

    Dividend distribution Dividends Distributed gross dividends (FY 2014 – 2021*) (RON mn) Gross dividend per share (RON) and Dividend yield(1) (%) 291.6 6.9% 7.3% 6.9% 244.7 251.4 245.4 247.5 246.1 247.9 6.8% 5.2% 6.0% 6.1% 0.8600 0.7217 0.7415 0.7237 0.7300 0.7248 0.7300 4.8% 152.8 0.4500 2014 2015 20

  19. Slide 19: Status of Group’s Strategy Implementation (1/2)

    Slide 19: Status of Group’s Strategy Implementation (1/2)

    Status of Group’s Strategy Implementation Electrica Group has made significant steps in implementing the strategy for the period 2019-2023 (1/2) I Expanding in related fields • Inorganic growth – the first acquisition • Organic growth – continues the efforts to and obtaining synergies finalized in 2

  20. Slide 20: Status of Group’s Strategy Implementation (2/2)

    Slide 20: Status of Group’s Strategy Implementation (2/2)

    Status of Group’s Strategy Implementation Electrica Group has made significant steps in implementing the strategy for the period 2019-2023 (2/2) III Continuing investments to improve the reliability of • Electrica Group continues investments in the modernization and development of distribution netwo

  21. Slide 21: Main events in 2021 and up to date (1/4)

    Slide 21: Main events in 2021 and up to date (1/4)

    Main events in 2021 and up to date (1/4) Main Corporate Events ELSA’s General Meetings of Shareholders dated 28 April 2021: ▪ Annual OGMS – the following have been approved: ✓ the 2020 individual and consolidated financial statements and the 2021 individual and consolidated budget; ✓ the proposal fo

  22. Slide 22: Main events in 2021 and up to date (2/4)

    Slide 22: Main events in 2021 and up to date (2/4)

    Main events in 2021 and up to date (2/4) Main Corporate Events ELSA’s General Meeting of Shareholders dated 8 December 2021: ▪ EGMS – approved: ✓ The completion of the guarantee structure for the bridge loan up to RON 750 mn. of non-binding nature to be contracted by Electrica from a consortium of b

  23. Slide 23: Main events in 2021 and up to date (3/4)

    Slide 23: Main events in 2021 and up to date (3/4)

    Main events in 2021 and up to date (3/4) Main Corporate Events Important decisions of the BoD: ▪ 26 February 2021 – approval of the consolidated value of the Investment Plan (CAPEX) of the Group for 2021, in total amount of RON 712.4 mn. Out of this value, RON 638.9 mn represents the investment plan

  24. Slide 24: Main events in 2021 and up to date (4/4)

    Slide 24: Main events in 2021 and up to date (4/4)

    Main events in 2021 and up to date (4/4) Main Corporate Events Other events: ▪ 22 April 2021 - Fitch Ratings affirmed Electrica’s rating at BBB with Negative outlook ▪ 22 April 2021 – ELSA’s BoD took note about the resignation of Ms. Ramona Ungur as member of the Board of Directors. ▪ 1 May 2021 – T

  25. Slide 25: Appendices

    Slide 25: Appendices

    Appendices Curectrica 25

  26. Slide 26: Group structure

    Slide 26: Group structure

    Group structure Electrica Group is the only Romanian group listed on the BSE & LSE and operates within production distribution, supply & energy service segments Distributie Energie Electrica Romania S.A. 2) Distribution Operator 99.99 % Electrica Furnizare S.A. HQ: Cluj-Napoca 99.99 %2) Electricity

  27. Slide 27: Important Regulatory Changes – Distribution Activity (1/2)

    Slide 27: Important Regulatory Changes – Distribution Activity (1/2)

    Important Regulatory Changes – Distribution Activity (1/2) ❑ RP4 Regulations on Distribution tariffs • RRR: ANRE approved Order no. 75 of 6 May 2020, which established a regulated rate of return (RRR) for electricity and gas, distribution and transmission of 6.39% for the existing RAB, until the end

  28. Slide 28: Important Regulatory Changes – Distribution Activity (2/2)

    Slide 28: Important Regulatory Changes – Distribution Activity (2/2)

    Important Regulatory Changes – Distribution Activity (2/2) ❑ Distribution performance standard: (i) better performance continuity indicators; (ii) automatic granting of compensations without request from users, (iii) gradual installation timetable of technical quality analyzers until 2028 (100% prim

  29. Slide 29: Changes in Distribution Regulation - RP4

    Slide 29: Changes in Distribution Regulation - RP4

    Changes in Distribution Regulation - RP4 Regulated Revenue and tariff calculation 1 2 3 4 5 6 7 8 7 Regulated Revenue Reactive en. Regulated Contr. Non- Tariff NL Cost Depreciation RRR2 & 95% profit Revenue OPEX1 controllable other activ. 9 Forecasted Volume OPEX 1 • The starting point is approved b

  30. Slide 30: Changes in Distribution Regulation

    Slide 30: Changes in Distribution Regulation

    Changes in Distribution Regulation Methodology for determining distribution tariffs - Summary RP4 vs RP3 RP3 RP4 1 RRR January 2019: 5.66% existing RAB & 1% incentive RP4 network invest.(acc. ANRE) Return RRR (7.7%) applied to RAB 29 March 2019–30 April 2020: 6.9% total RAB (acc. GEO 19/2019 & GEO 1

  31. Slide 31: Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3

    Slide 31: Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3

    Changes in Distribution Regulation Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3 RAB & Investment RP3 methodology RP4 methodology 1. RAB includes: assets used for the distribution service, which are recorded into the DSOs accounts as tangible assets and are physi

  32. Slide 32: Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3

    Slide 32: Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3

    Changes in Distribution Regulation Methodology for determining distribution tariffs – Comparative elements RP4 vs RP3 Opex & NL RP3 methodology RP4 methodology Controlable OPEX 1. OpexC 2019 is established based on formula (approved 1. OpexC 2019 is not established based on formulae, but by comparat

  33. Slide 33: Regulatory-related Developments – Supply – 2021 (1/7)

    Slide 33: Regulatory-related Developments – Supply – 2021 (1/7)

    Regulatory-related Developments – Supply – 2021 (1/7) Compensation scheme for the consumption of electricity and gas during the 2021-2022 cold season (Government Emergency Ordinance - GEO No. 118/2021, approved with amendments via Law No. 259/2021, GEO No. 130/2021, GEO No. 2/2022, GEO No. 3/2022) •

  34. Slide 34: Regulatory-related Developments – Supply – 2021 (2/7)

    Slide 34: Regulatory-related Developments – Supply – 2021 (2/7)

    Regulatory-related Developments – Supply – 2021 (2/7) Compensation scheme for the consumption of electricity and gas during the 2021-2022 cold season GEO No. 3/2022 (amendments to GEO No. 118/2021, with application between February 1 and March 31, 2022) • Increasing the consumption margin for granti

  35. Slide 35: Regulatory-related Developments – Supply – 2021 (3/7)

    Slide 35: Regulatory-related Developments – Supply – 2021 (3/7)

    Regulatory-related Developments – Supply – 2021 (3/7) Amendment of the Regulation on the last resort supply of natural gas (ANRE Order no. 125/2021 for the amendment of ANRE Order no. 173/2020) • Designation of suppliers of last resort (SoLR): at least 5 SoLR, with a cumulative market share, in term

  36. Slide 36: Regulatory-related Developments – Supply – 2021 (4/7)

    Slide 36: Regulatory-related Developments – Supply – 2021 (4/7)

    Regulatory-related Developments – Supply – 2021 (4/7) Amendment of Law no. 123/2012 by GEO No. 143/2021: • Introducing the possibility for suppliers to charge final customers (without distinction) commissions for the termination of supply contracts concluded for a determined period and with fixed pr

  37. Slide 37: Regulatory-related Developments – Supply – 2021 (5/7)

    Slide 37: Regulatory-related Developments – Supply – 2021 (5/7)

    Regulatory-related Developments – Supply – 2021 (5/7) Changes & add-ons to several obligations & provisions from the Electricity Supply Regulation (ANRE Order No. 82 & 91/2021) • Changes/add-ons generally enforced starting 1 July 2021, referring mainly to content of offers and contracts, determinati

  38. Slide 38: Regulatory-related Developments – Supply – 2021 (6/7)

    Slide 38: Regulatory-related Developments – Supply – 2021 (6/7)

    Regulatory-related Developments – Supply – 2021 (6/7) Extension of trading possibilities on the wholesale electricity market (GEO No. 143/2021 for the amendment of Law No. 123/2012) • Elimination of the obligation for transactions on this market to take place in a public and centralized manner; the

  39. Slide 39: Regulatory-related Developments – Supply – 2021 (7/7)

    Slide 39: Regulatory-related Developments – Supply – 2021 (7/7)

    Regulatory-related Developments – Supply – 2021 (7/7) Elimination of obligation for licensees (including suppliers) to prepare and submit ANRE the annual report on the activities covered by the license (ANRE Order No. 1/2022) License • Approval of ANRE Order No. 1/2022 for the abrogation of ANRE Ord

  40. Slide 40: Leading Player in Distribution and Supply according to ANRE’s most recent annual report

    Slide 40: Leading Player in Distribution and Supply according to ANRE’s most recent annual report

    Leading Player in Distribution and Supply according to ANRE’s most recent annual report Distribution Supply Volumes Distributed in 2020 Volumes Supplied in 2020 13.1% SDMN 19.25% SDTS 14.0% Electrica Furnizare SDTN 48.3 TWh 44.1 TWh Others Others 60.4% 12.5% 80.75% Electrica: 39.6% Regulated Market

  41. Slide 41: Corporate Governance Bodies

    Slide 41: Corporate Governance Bodies

    Corporate Governance Bodies • Mr. Iulian Cristian Bosoanca – Chair • Mr. Gicu Iorga Board of Directors • Mr. Ion – Cosmin Petrescu Current • Mr. Adrian – Florin Lotrean Composition • Mr. Radu – Mircea Florescu • Mr. Dragos – Valentin Neacsu • Mr. George Cristodorescu • All board members are non-exec

  42. Slide 42: Shareholder Structure at 31 December 2021

    Slide 42: Shareholder Structure at 31 December 2021

    Shareholder Structure at 31 December 2021 Percent of share Shares with voting Shareholder Shares capital right Romanian State through the Ministry of Energy 169,046,299 48.79% 49.79% EBRD 17,355,272 5.01% 5.11% Electrica 6,890,593 1.99% 0% Bank of New York Mellon - GDRs 2,716,716 0.78% 0.80% Other l

  43. Slide 43: Monthly volume and average price of Electrica’s shares and GDRs

    Slide 43: Monthly volume and average price of Electrica’s shares and GDRs

    Monthly volume and average price of Electrica’s shares and GDRs 14 2,894,263 13 12 11 10 2,218,423 9 8 1,799,309 1,755,148 7 6 5 1,344,710 1,252,345 1,255,592 4 1,209,435 1,174,202 1,075,017 3 2 867,265 776,898 1 18,688 56,716 17,508 12,624 7,520 7,180 2,000 388 2,600 4,744 10,680 0 0 Ian-21 Feb-21

  44. Slide 44: Electrica’s adjusted closing price vs BET-TR (1 January – 31 December 2021)

    Slide 44: Electrica’s adjusted closing price vs BET-TR (1 January – 31 December 2021)

    Electrica’s adjusted closing price vs BET-TR (1 January – 31 December 2021) 50.00 EL: -14.52% BET-TR: 39.46% 40.00 30.00 20.00 10.00 0.00 -10.00 -20.00 BET-TR Electrica's price adjusted with dividends Source: Company’s data, BSE 44

  45. Slide 45: Glossary

    Slide 45: Glossary

    Glossary LV Low Voltage AMR Automatic Meter Reading MP Merger Plan ANRE Romanian Energy Regulatory Authority MV Medium Voltage B2B Business to Business MWh MegaWatt hour B2C Business to Consumer NBV Net Book Value BET-TR Bucharest Exchange Trading - Total Return Index NL Network Losses BoD Board of

  46. Slide 46: 2022 Financial Calendar

    Slide 46: 2022 Financial Calendar

    2022 Financial Calendar • 25 February Publication of the 2021 financial annual consolidated and individual preliminary results Publication of the 2021 financial annual results - documents for the Ordinary General Meeting of • 28 February Shareholders • 4 March Investor and analyst teleconference for

  47. Slide 47: Investor Relations & Disclaimer

    Slide 47: Investor Relations & Disclaimer

    Investor Relations & Disclaimer • Email: ir@electrica.ro • Web: https://www.electrica.ro/en/investors/ Investor Relations • Tel: +40 (0)21.208.50.35 • Address: 9 Grigore Alexandrescu Str., 1st District, Bucharest, 010621 This document was prepared by Electrica for the presentation of FY 2021 financi

  48. Slide 48: Q&A

    Slide 48: Q&A

    Q&A Executive Management of Electrica Ms. Corina Georgeta Mr. Ionut Pascu Mr. Stefan Frangulea Popescu Chief Corporate Chief Financial Officer Chief Executive Officer Development Officer 2017 Ms. Livioara2018Sujdea Chief Distribution Officer Mr. Mircea-Toma Modran Chief Information Officer 48

Source: Internet Archive copy of electrica.ro

More decks from Societatea Energetica Electrica S.A.

All 72 Societatea Energetica Electrica decks