  1. Slide 1: Transmission Formula Rate AEP East Operating Companies

    Transmission Formula Rate AEP East Operating Companies Annual Update March 24, 2017 1

  2. Slide 2: Section 205 FERC Filing

    Section 205 FERC Filing • AEP filed Section 205 November 22, 2016, modifying Attachment H-14A and H-14B of the PJM OATT • FERC issued an Order March 10, 2017, accepting (subject to refund) those modifications • AEP calculated its Projected Transmission Revenue Requirement (PTRR) for rates effective

  3. Slide 3: Section 205 FERC Filing (continued)

    Section 205 FERC Filing (continued) • Previously, AEP’s formula rates were billed on projected plant and actual FERC Form 1 expenses, paid July 1-Dec 31, 2016. • True-up was based on average historic plant investment and actual FERC Form 1 balances. • Cost recovery for any given rate year would not

  4. Slide 4: Section 205 FERC Filing (continued)

    Section 205 FERC Filing (continued) • Transition to fully projected (“PTRR”) formula rate • Pro-rate property-related accumulated deferred income taxes (“ADIT”) per IRS rules • Provide deferred tax liability and flow-through • Minor modifications to protocols • Provide billing credit for existing cu

  5. Slide 5: Billing Transition

    Billing Transition • The 2017 PTRR updated rates – included in March bill (billed in April) • For January and February, PJM will make prior period adjustments to the bills. – NITS – spread the Jan/Feb under-collection over 8 months, beginning with March billing – Schedule 12 – reflect the Jan/Feb ov

  6. Slide 6: Federal Energy Regulatory Commission (FERC)

    Federal Energy Regulatory Commission (FERC) • FERC has accepted other forward- looking formula rates • Not a departure from ratemaking practice • Customers pay only transmission costs (no more or less) – mitigates lag 6

  7. Slide 7: Benefits to Customers

    Benefits to Customers • Matches rates to service • Reduces true-up • Reduces interest • PTRR consistent with PJM billing process, new NSPL beginning January 1 • True-up ensures customers pay actual revenue requirement based on FERC Form 1 reports, no more and no less 7

  8. Slide 8: Future True-ups

    Future True-ups • 2016 true-up of the previous formula rate will be computed, filed, and posted on the PJM/AEP website by May 25, 2017 (as done in the past) – Any over/under recovery with interest will be included in the PTRR effective January 1, 2018, and posted on the PJM/AEP website by October 31

  9. Slide 9: AEP East Zone Network Service Peak Load

    AEP East Zone Network Service Peak Load • NSPL (1 CP) – 2015 NSPL February 20, 2015 (winter peak) • Hour 08 24,725.1 MW – 2016 NSPL August 11, 2016 (summer peak) • Hour 15 22,475.7 MW 9

  10. Slide 10: Operating Company Rates

    Operating Company Rates • Previous Billed Rate – Rates effective July 1, 2016 • billed July – December, 2016 • $84.88/MW-Day (2015 NSPL 24,725.1 MW) • Projected Rate update (PTRR) – Rates effective January 1, 2017 Average B/E Projected Ratebase Balances (2016-2017) and Projected 2017 O&M Expense • b

  11. Slide 11: Regulatory Changes

    Regulatory Changes • Depreciation rates revised for Kingsport Power Company 11

  12. Slide 12: AEP.com Website Posting

    AEP.com Website Posting for Rates Effective January through December, 2017 • Notice of Annual Filing • Annual Update Customer Meeting Notice • Formula Rate Update AEP Operating Companies Summary http://www.aep.com/about/codeofconduct/ • ATRR Summary of AEP Operating Companies OASIS/TariffFilings/ •

  13. Slide 13: Operating Company Rate Summary

    Operating Company Rate Summary July 1, 2016* Projected ** Total Change Charge 2015 FERC Form 1 January 1, 2017 and % Change (projected plant 2016 (projected B/E historical 2015) 2016/2017 plant) Point-to-Point Rate $448.90 $/MW-Month $2,581.64 $3,030.54 17.4% Schedule 12 ATRR (10,688,259) $54,479,93

  14. Slide 14: Reliability Enhancement

    Reliability Enhancement “Baseline vs Backbone Project” • PJM’s RTEP, Regional Transmission Expansion Plan, identifies system additions and improvements needed to keep electricity flowing to millions of people. • PJM “Backbone” projects are a subset of “Baseline” projects, identified by PJM to resolv

  15. Slide 15: Reliability Enhancement “Backbone Project”

    Reliability Enhancement “Backbone Project” b1660.1 - Rebuild Amos- Kanawha River 138kV corridor Driver: Generator Deactivation b2020 - Cloverdale – install 6 765kV breakers including incremental work for 2 additional breakers; reconfigure and relocate miscellaneous facilities; establish 500kV statio

  16. Slide 16: Reliability Enhancement “Baseline Project”

    Reliability Enhancement “Baseline Project” b1032.2 - Construct two 138kV outlets to Delano 138kV station and Circleville station; install new 138 kV breaker string at Delano station to terminate new line. Driver: Baseline Load Growth Deliverability & Reliability b1818 - Expand Allen station by insta

  17. Slide 17: Revenue Requirement (Summary Line 8)

    Revenue Requirement (Summary Line 8) used to calculate the PTRR Revenue Requirement 17

  18. Slide 18: Gross Plant Investment

    Gross Plant Investment Prior Year Projected vs. PTRR B/E Balance $8,000 $7,500 $7,000 $6,500 $6,000 $5,500 In Millions $5,000 $4,500 $4,000 $3,500 $3,000 $2,500 $2,000 $1,500 $1,000 $500 $0 APCo I&M KPCo KgPCo OPCo WPCo AEP East OPCo's 2011 Projected $1,934,693,178 $1,194,357,912 $460,203,821 $21,31

  19. Slide 19: Transmission O&M Expense

    Transmission O&M Expense 2016 Projected (Actual 2015) vs 2017 Projected 19

  20. Slide 20: Schedule 1A

    Schedule 1A AEP Annual Line Revenue No. Requirement A. Schedule 1A ARR 1 Total Load Dispatch & Scheduling (Account 561) (TCOS Line 15) $32,427,739 Less: Load Disptach - Scheduling, System Control and Dispatch Services 2 (321.88.b) $14,705,536 Less: Load Disptach - Reliability, Planning & Standards D

  21. Slide 21: Questions?

    AMERICAN i ELECTRIC POWER —_ F i \ 21

  22. Slide 22: Transmission Formula Rate AEP East Transmission Companies

    Transmission Formula Rate AEP East Transmission Companies Appalachian, Indiana Michigan, Kentucky, Ohio and West Virginia Annual Update March 24, 2017 22

  23. Slide 23: Section 205 FERC Filing

    Section 205 FERC Filing • AEP filed Section 205 November 22, 2016, modifying Attachment H-20A and H-20B of the PJM OATT • FERC issued an Order March 10, 2017, accepting (subject to refund) those modifications • AEP calculated its Projected Transmission Revenue Requirement (PTRR) for rates effective

  24. Slide 24: TransCo Rates

    TransCo Rates • Previous “Billed” Rate – Rates effective July 1, 2016 • billed July – December, 2016 • $39.91/MW-Day (2015 NSPL 24,725.1 MW) • Projected Rate update (PTRR) – Rates effective January 1, 2017 with Average B/E “Projected” Ratebase Balances (2016-2017) and O&M “Projected” 2017 Expense •

  25. Slide 25: AEP.com Website Posting

    AEP.com Website Posting for TransCo Rates Effective January - December, 2017 • Notice of Annual Filing • Formula Rate Update AEP Transmission Companies Summary • http://www.aep.com/about/codeofconduct/ • ATRR Summary of AEP TransCo East OASIS/TariffFilings/ Formula Rates • Appalachian Transmission C

  26. Slide 26: TransCo Rate Summary

    TransCo Rate Summary Charge July 1, 2016 * Projected ** Total Change 2015 FERC Form 1 January 1, 2017 and % Change (projected plant 2016) (projected B/E plant) Point-to Point Rate $504.95 $/MW-Month $1,213.79 $1,718.74 41.6% Schedule 12 $27,198,984 $124,875,434 $152,074,418 21.8% AEP East Zone (2,24

  27. Slide 27: Primary Drivers of Rate Change

    Primary Drivers of Rate Change • Increased capital spend in AEP I&M TransCo, AEP Kentucky TransCo, AEP Ohio TransCo and AEP West Virginia TransCo • Increase in Expense • Increase in O&M Expense • Increase in Depreciation Expense • Increase in Property Taxes • Network Service Peak Load (“NSPL”) • 9.1

  28. Slide 28: Revenue Requirement (Summary Line 8)

    Revenue Requirement (Summary Line 8) used to calculate the PTRR Revenue Requirement $500 $450 $400 $350 In Millions $300 $250 $200 $150 $100 $50 $0 Appalachian Kentucky West Virginia Total East IM Transco Ohio Transco Transco Transco Transco Transco's 2012 Projected $111,736 $2,132,036 $146,026 $26,

  29. Slide 29: Gross Plant Investment

    Gross Plant Investment Prior Year Projected vs. PTRR B/E Balance $4,000 $3,500 $3,000 In Millions $2,500 $2,000 $1,500 $1,000 $500 $0 Appalachian Kentucky West Virginia Total East IM Transco Ohio Transco Transco Transco Transco TransCo's 2012 Projected ‐ 21,881,262 ‐ 244,322,471 ‐ $266,203,733 2013

  30. Slide 30: Transmission O&M Expense

    Transmission O&M Expense 2016 Projected (Actual 2015) vs 2017 Projected $50 $45 $40 $35 In Millions $30 $25 $20 $15 $10 $5 $0 Total East APTCo IMTCo KTCo OHTCo WVTCo TransCo's 2016 Projected 147 3,645,714 112,315 7,761,650 1,972,225 13,492,051 2017 Projected 998 11,882,535 977,590 24,133,108 7,828,9

  31. Slide 31: Projected Plant Additions

    Projected Plant Additions $1,200 $1,000 $800 In Millions $600 $400 $200 $0 Appalachian Kentucky W Virginia Total East IM Transco Ohio Transco Transco Transco Transco Transco's 2011 Projected ‐ 3,128,014 ‐ 74,770,454 ‐ 77,898,468 2012 Projected ‐ 18,325,850 ‐ 170,448,460 ‐ 188,774,310 2013 Projected

  32. Slide 32: Reliability Enhancement “Backbone Project”

    Reliability Enhancement “Backbone Project” b1465.1 - Add a third 2250 MVA 765/345 kV transformer at Sullivan station and 345 kV switching changes at Sullivan/Breed Driver: Baseline Load Growth Deliverability & Reliability 32

  33. Slide 33: Reliability Enhancement “Baseline Project”

    Reliability Enhancement “Baseline Project” • B1818 - Expand the Allen station, install a second 345/138 kV transformer, add four 138 kV exits, cutting in the Lincoln - Sterling and Milan - Timber Switch 138 kV double circuit tower line • b2423 - Install a 300 MVAR shunt reactor at AEP's Wyoming 765

  34. Slide 34: AEP Projects Website

    AEP Projects Website • A valuable resource for Transmission project information around the system: – http://aeptransmission.com/index.php – Current Projects by state (not all inclusive) • Project specific websites 34

  35. Slide 35: Questions

    Questions Contact: Diane Keegan Formula Rates Manager 614-716-2317 dmkeegan@aep.com 35