Tartisan Nickel Corp. · CSE:TN
Tartisan Nickel — Investor Presentation (February 2025)
19 slides from Tartisan Nickel's investor presentation, Feb 26, 2025
Slide 1: Kenbridge Ni-Cu Project
Kenbridge Ni-Cu Project CSE:TN OTCQB:TTSRF FSE:8TA www.tartisannickel.com
Slide 2: Disclaimer
Disclaimer This presentation may contain "forward-looking statements" within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this presentation and the Company does not i
Slide 3: Kenbridge Project Highlights
Kenbridge Project Highlights Kenbridge uniquely fits as a SMALL CAPEX CLASS 1 NICKEL PROJECT which can be put into production this decade to become part of the North American supply chain. We are focused on advancing the Kenbridge Deposit towards production. Next steps: • Drill extensions to the Ken
Slide 4: Kenbridge – Accessible Location, Good Infrastructure
KB East KB North KB West Kenbridge Ni-Cu Deposit Kenbridge – Accessible Location, Good Infrastructure • Located in mining friendly jurisdiction. New Gold’s Rainy River Gold Mine currently in production 80 km to the south. • 4,259 ha land position • All season road access; • Close proximity (40 km) t
Slide 5: First Nations Agreement – Treaty #3
First Nations Agreement – Treaty # 3 • Treaty # 3: 28 First Nations under one flag, 55,000 sq. mile traditional territory • Company has been engaged with Treaty # 3 since May 2007. Recognized and is participating in Great Earth Law authorization process • Canadian Arrow Mines Limited received first
Slide 6: Kenbridge – All Season Access Road
Kenbridge – All Season Access Road CSE:TN OTCQB:TTSRF FSE:8TA 6
Slide 7: Historic Work at the Kenbridge Project
Historic Work at the Kenbridge Project • 100,000 m of drilling in 600 holes between 1952 and 2024 • Development includes a 3-compartment timber lined shaft to a depth of approximately 623 m. • Underground lateral development includes drifts to the mineralized zones and sill drifting on the 110 m and
Slide 8: Kenbridge Historic Drill Holes
Kenbridge Historic Drill Holes CSE:TN OTCQB:TTSRF FSE:8TA 8
Slide 9: Nickel Grade Increases with Depth
Nickel Grade Increases with Depth Ni% 0.00 Grade Trends 0.50 Low Grade 1.00 Medium Grade 2.00 High Grade CSE:TN OTCQB:TTSRF FSE:8TA 9
Slide 10: Kenbridge Deposit Drill Section (Looking South)
Kenbridge Deposit Drill Section (Looking South) Surface 2025 program is designed to drill to upgrade Inferred Resources to Indicated Resource in lower portion of the Kenbridge Deposit and drill along strike to the north Proposed 500 ft level Open pit Green is the current Mineral KB21-198 Zone A: 1.0
Slide 11: Kenbridge Proposed Drill Program
Kenbridge Proposed Drill Program DRILL PLAN – CONVERT INFERRED TO MEASURED DRILL PLAN – EXPAND CURRENT RESOURCE AREA AND INDICATED RESOURCES – 10,000 m – 10,000 m Looking North Looking North Red: existing drill holes. Red: existing drill holes. Green: proposed drill holes. Grey: proposed drill holes
Slide 12: Kenbridge Geophysics
Kenbridge Geophysics Deep Magnetotelluric Survey to be flown over entire property package to test for hidden conductivity features at depth in summer 2025. 20-line km of pole-dipole IP/Resistivity Survey to be conducted south-southwest of the main mine area to test for potential Mineral Resource ext
Slide 13: Kenbridge Project CapEx Summary (PEA July 22)
Kenbridge Project CapEx Summary (PEA July 22) Pre- Sustaining Total LOM Production Capital Capital Cost per Area Capital Costs Costs Tonne Costs ($M) ($M)1 ($/t) ($M) Site Preparation, Utilities, Services and 7.9 4.1 12.0 2.65 General Process Plant Equipment2, Tailings, and 21.8 8.3 30.2 6.68 Water
Slide 14: Kenbridge Sensitivity to Metal Prices
Kenbridge Sensitivity to Metal Prices • Kenbridge is sensitive Financials Pre-Tax After-Tax $USD8/lb Ni to Ni-Cu NPV (5%) ($M) 132.7 67.0 IRR (%) 14 8 prices Payback (years) 5.6 5.4 • Payback is Financials Pre-Tax After-Tax $USD10/lb Ni NPV (5%) ($M) 182.5 109.1 short term IRR (%) 26 20 Payback (yea
Slide 15: Located in an Emerging Nickel District
Located in an Emerging Nickel District • Grid Metals (Makwa Project), NewRange (NorthMet Project), Lundin Mining (Eagle Project), Talon Metals (Tamarack Project), Tartisan Nickel (Kenbridge Project), All five Projects are within close proximity forming an ‘Emerging Critical Minerals District’. • Tal
Slide 16: Kenbridge Project Located in Emerging Nickel District
Kenbridge Project Located in Emerging Nickel District CSE:TN OTCQB:TTSRF FSE:8TA 16
Slide 17: 2025 Kenbridge Budget
2025 Kenbridge Budget Description Total Cost ($M) Phase One Extensional and Additional 2.0 Exploration Drilling 10,000 m Drilling to convert Inferred 2.0 Resource to Measured and Indicated 10,000 m Subtotal 4.0 Phase Two Environmental, Social, 1.5 Community, Access Road Geological, Geophysical & 0.4
Slide 18: Kenbridge – 2025 Next Steps
Kenbridge – 2025 Next Steps 1. Extensional and Exploratory Drilling to expand Kenbridge Ni-Cu Resource on strike to the north and down dip. 2. Upgrade 1Mt of Inferred Resource into Indicated. 3. Advance project permitting process, continue baseline studies. 4. Evaluate, assess and drill regional tar
Slide 19: Corporate Information
Corporate Information • Mark Appleby – President, CEO-Director Recent Share Price $0.22 • Over 38 years experience in a variety of disciplines relating Shares Issued and Outstanding 130,995,782 to investment banking, corporate finance and capital markets Warrants Outstanding 1,388,889 • Yves Clement