Carolina Rush Corporation · TSXV:RUSH

Carolina Rush — Investor Presentation (February 2024)

42 slides from Carolina Rush's investor presentation, Feb 27, 2024

  1. Slide 1: Exploring for Gold and Copper in the Southeast USA

    Exploring for Gold and Copper in the Southeast USA Corporate Presentation – Q1 - 2024 Cover Photo: Reclaimed Brewer Open Pit/Heap Leach Mine Site, South Carolina, USA

  2. Slide 2: Disclaimer

    Disclaimer This Presentation is not an offer to buy or sell the securities referenced herein, nor has the Securities and Exchange Commission or any state, provincial or territorial regulatory authority determined if this Presentation is truthful or complete. Any representation to the contrary is a c

  3. Slide 3: Southeast USA: North America's First Gold District

    SOUTHEAST USA: NORTH AMERICA’S FIRST GOLD DISTRICT Carolina Terrane: 10.35 M oz Gold Endowment • Porphyry/epithermal and orogenic gold mineralization • Gold discovered 50 years before California • 1,493 mines and prospects documented GEOLOGICAL SETTING OF EASTERN NORTH AMERICA Brewer Haile Carolina

  4. Slide 4: Projects

    PROJECTS BREWER MINE SAWYER & NEW SAWYER EXPANDED REGIONAL PROGRAM Epithermal & Porphyry Copper-Gold Target Two historic Gold Mine Acquired Management Commitment • Historic open pit gold mine: produced • Sawyer Trend gold properties: +20 km • 7 additional new targets identified: +200,000 oz Au struc

  5. Slide 5: Carolina RUSH Has Historic Gold Mines

    Carolina RUSH Has 3 Historic Gold Mines * Sawyer Trend Brewer Golden Triangle (BC) Mine Same Scale * USGS Professional Paper 213 CAROLINA TERRANE IS 400 km NE-SW BY 100 km NW-SE = 40,000 km2 and contains Hundreds of Historic Mines Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 5

  6. Slide 6: Brewer Mine, Next to Haile Mine

    Brewer Mine, Next to Haile Mine Table 1. Brewer Mine Production : 1987 – 1993 km/ iles Location Ore Tonnes Waste Tonnes Total Tonnes Grade (g/t) Au Oz (calc) 17 .6 m 10 Brewer 4,487,441 4,500,617 8,869,699 1.20 173,150 B6 556,929 1,578,809 2,135,738 1.27 22,717 NW Trend 92,268 330,039 433,843 1.06 3

  7. Slide 7: Phase I & II Data Driven Exploration

    Phase I & II Data Driven Exploration Brewer Near Surface Resource Target CORE DRILLING • Inaugural drill program: 17 holes, 5,400m drilled • Highlights include: • B21C-005: 181.6 m @ 1.24 g/t Au, 0.27% Cu from 56 m depth Including: 10.1 m @ 8.20 g/t Au, 0.24% Cu from 65 m depth • B21C-008: 106.5 m @

  8. Slide 8: Reclaimed Pits: ~11.9 Mt @ 0.36 g/t – 137,000 oz Au

    RECLAIMED PITS: ~11.9 Mt @ 0.36 g/t – 137,000 oz Au * Reclaimed Backfill Material (vertical section, looking west) Waste Rock contains estimated 74,000 oz @ 0.5 g/t Au* * The Company cautions that a Qualified Person has not done sufficient work to classify the Historic Estimate as current mineral re

  9. Slide 9: Brewer Core Drilling To Date

    Brewer Core Drilling To Date Summary of Best Intersections in Each Hole Rank Drill Hole From To Interval Au Cu Au (m) (m) (m) (g/t) (%) GxT 1 B24C-021 111.50 174.00 62.50 8.45 0.28 528 2 B21C-005 56.00 237.60 181.60 1.24 0.27 225 3 B21C-008 52.00 158.50 106.50 1.07 0.26 114 4 B20C-004 66.41 182.00 1

  10. Slide 10: Brewer I, II & III Drill Programs

    Brewer I, II & III Drill Programs Best Copper Results RUSH Core Drilling BHID From (m) To (m) Interval (m) Au* (g/t) Cu* (%) B20C-004 161.4 169.0 7.6 2.96 0.97 B21C-005 71.9 87.5 15.6 1.43 0.54 and 190.9 210.2 19.3 0.86 0.65 and 221.0 226.0 5.0 0.45 0.51 B21C-008 105.5 149.2 43.7 2.05 0.54 B21C-015

  11. Slide 11: Lithology, Mineralization & Alteration

    Lithology, Mineralization & Alteration Breccia and Mineralization B21C-005: 165.4 m B21C-008: 120.3 m B21C-008: 104.5 m B21C-008: 67.6 m Multiple episodes of brecciation and Sub-rounded, polyphase, clast-supported, Angular, monolithic, matrix-supported Large, mineralized quartz-porphyry clast within

  12. Slide 12: Brewer 2D-IP Geophysics

    Brewer 2D-IP Geophysics • Extensive Dipole-Dipole IP-Resistivity survey in 2022 across Brewer and surrounding Jefferson properties • 61.5 line km surveyed, A=100, N=8, ~250m depth of investigation • Integrated with geologic model and covers exploration targets to south and west of former mine Q1 - 2

  13. Slide 13: Brewer 2022 Induced Polarization Survey

    Brewer 2022 Induced Polarization Survey B21B-11: Shallow RAB hole near peak of anomaly ended in 6 m B21C 015: Core hole discovered new zone of breccia-hosted @ 1 g/t Au Au – Cu mineralization (open in all directions) B21B-111 B21C-15 Polarizable - Resistive Polarizable - Conductive Resistivity and C

  14. Slide 14: Brewer Geology & Copper Model

    Porphyry Cu Model Brewer Geology & Copper Model Cross-Section Diatreme Breccias and Porphyry Target Brewer Level • Lithocap forms prominent topographic high • High-Level diatreme at surface, above porphyry system at depth Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 14

  15. Slide 15: Brewer Breccia & Target Map

    Brewer Breccia & Target Map • IP target areas superimposed on the Alteration/Breccias of the mine • Strong correlation between IP target areas and mapped breccia bodies, which hosts mineralization within the main Brewer Pit Tanyard Sediments – Sericite/Silica Gossan Possible Second Maar Diatreme at

  16. Slide 16: 2023/24 Exploration Program

    2023/24 Exploration Program D.P. Brewer Target Areas Pit: Brewer Pit (700 – 1,000 m) • 2 holes planned to step out on best intercepts (004 & 008) • Provisional third hole to test continuity of mineralization between 004 & 005 • Define extents of mineralization beneath pit, following up on Phase I &

  17. Slide 17: Phase III Drilling at Brewer

    Phase III Drilling at Brewer Pit Area, Tanyard Breccia and Western Target 2,022 m drilled in 8 holes • Holes 18, 19 & 20 (941 m) drilled under the former mine B23C-019 • Holes 21, 22, 23 and 25 (809 m) drilled at the Tanyard Zone, south of the former mine, B23C-020 following up on a new zone of Au-C

  18. Slide 18: Phase III Drilling at Brewer

    Phase III Drilling at Brewer Brewer Pit Area (B23C-018) B23C-018 Section B – B’: 4475N From Interval Au BHID To (m) Cu (%) (m) (m) (g/t) B21C-008 52.00 158.50 106.50 1.07 0.26 Incl. 104.00 149.23 45.23 2.03 0.52 Incl. 141.00 149.23 8.23 5.04 1.43 Section B – B’: 5534475N From Interval Au BHID To (m)

  19. Slide 19: Phase III Drilling at Brewer

    Phase III Drilling at Brewer B23C-019 Brewer Pit Area (B23C-019) Section E – E’: 4625N From Interval Au BHID To (m) Cu (%) (m) (m) (g/t) B21C-005 56.00 237.60 181.60 1.24 0.27 Incl. 62.00 137.00 75.00 2.14 0.26 Incl. 64.90 89.10 24.20 4.26 0.42 Incl. 64.90 67.90 3.00 24.29 0.43 Section E – E’ From I

  20. Slide 20: Phase III Drilling at Brewer

    Phase III Drilling at Brewer Brewer Pit Area (B23C-020) B23C-020 Section E – E’ From Interval Au BHID To (m) Cu (%) (m) (m) (g/t) B23C-020 98.86 113.30 14.44 0.41 <0.10 Incl. 99.86 105.00 5.14 0.67 0.11 And 163.50 229.45 65.95 0.50 <0.10 Incl. 171.00 200.50 29.50 0.79 <0.10 And 188.52 200.50 11.98 1

  21. Slide 21: Phase III Drilling: Following up on Initial Success

    Phase III Drilling: Following up on Initial Success Holes 15 & 21 is projected 50 m west onto the section Vertical Section Looking West Visuals for B23C-021 – Chalcocite at 135 m 4 5 -011 00 00 1C C- C- 1C -01 5 B23C-021 -00 9 B2 1C -00 8 B 20 B 21 B2 B2 2 1C B B21C-015: 62m of 1.0 g/t Au, 0.2% Cu,

  22. Slide 22: Newly Discovered Tanyard Zone

    Newly Discovered Tanyard Zone Diatreme Breccia Zone ~ 150 m South of the Historic Brewer Breccia Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 22

  23. Slide 23: Newly Discovered Tanyard Zone

    Newly Discovered Tanyard Zone D.P. Diatreme Breccia Zone ~ 150 m South of the Historic Brewer Breccia Drill Results to Date at the Tanyard Zone BHID From (m) To (m) Interval (m) Au (g/t) Cu (%) B21C-015 44.60 107.00 62.40 1.03 0.15 Incl. 76.50 97.70 21.20 2.23 0.36 W Pit B23C-021 55.00 64.50 9.50 0.

  24. Slide 24: Phase III Drilling: Following up on Initial Success

    Phase III Drilling: Following up on Initial Success B23C-021 – Highest Gold Grade at Brewer Thus Far, Open in All Directions Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 24

  25. Slide 25: Results from the Tanyard Zone

    Results from the Tanyard Zone South of the Historic Brewer Mine Examples of Mineralization Encountered in Hole B23C-021 B24C-022: 55 – 57.8m Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 25

  26. Slide 26: Sawyer Trend Properties in Randolph County, North Carolina

    Sawyer Trend Properties in Randolph County, North Carolina An Alignment of Gold Deposits Over a +20 km Long Trend New Sawyer Sawyer -Exploring the +20 km Long Sawyer-Keystone Gold Trend -Recently recognized trend of Haile-type historic gold mines -No modern exploration programs completed Possible an

  27. Slide 27: Sawyer Historic Gold Mine

    Sawyer Historic Gold Mine Randolph County, North Carolina Historic mineral resource estimate (2021)* Aerial Photo of the Sawyer Mine Property at Sawyer Mine: • M&I: 4.3 Mt @0.8 g/t Au containing 116,500 oz Au • Inferred: 1.8 Mt @ 0.7 g/t Au containing 40,600 oz Au *based on 0.2 g/t COG Mineralizatio

  28. Slide 28: Sawyer: Recent Verification Trenches

    Sawyer Recent Verification Trenches of Historic Data – Assays Pending Primary Host: QSP Altered Felsic Volcanic and Sediment ST 23 01: 0 – 36 m ST 23 02: 0 – 40 m Trench ST 23 01 Trench ST 23 02 Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 28

  29. Slide 29: New Sawyer Historic Gold Mine

    New Sawyer Historic Gold Mine • Gold was produced from multiple zones hosted in Haile-type sericite-pyrite-clay alteration • Large, structurally controlled alteration zone • 700m + 200m long gold Geochem anomaly • 12 vertical shafts • The Sawyer and New Sawyer Mines have potential for: • near surfac

  30. Slide 30: New Sawyer Verification Trenches

    New Sawyer Verification Trenches of Historic Data From To Interval Trench NS-1 Trench NS-2 Trench ID (m) (m) (m) Au (g/t) NS-1 0 30 30 1.6 Incl. 12 28 16 2.2 NS-2 0 30 30 1.0 Incl. 20 30 10 2.1 Primary Host: QSP Altered Felsic Volcanic Historic Shaft Next To Trench NS-1 Q1 - 2024 TSXV: RUSH | OTCQB:

  31. Slide 31: Summary

    SUMMARY BREWER TARGETS ARE HIGHLY SAWYER GOLD TREND EXPLORATION ADVANCED REGIONAL COMPILATION PROSPECTIVE PROGRAM AND INTERPRETATION • Immediate near surface resource • New deposits – no modern exploration • 7 targets identified, review and acquisition in definition and production potential • Resour

  32. Slide 32: Capital Structure

    Capital Structure TSXV: RUSH | OTCQB: PUCCF Capital Structure Retail 10% Shares Outstanding 42,865,122 Institutions 14% Warrants 14,048,984 Board, Management & Strategic Advisors Options 3,546,000 55% High Net Worth Investors Fully Diluted 60,460,106 21% 52-Week Range $0.45 - $0.10 Market Capitaliza

  33. Slide 33: Management Team Aligned to Capitalize on New Discoveries

    Management Team Aligned to Capitalize on New Discoveries Technical Experience and Seasoned Management Layton Croft – President, CEO and Director Patrick Quigley, MSc, QP – Exploration Manager and Senior Geologist • Executive with +20 years of global minerals and mining industry • Mining geologist wi

  34. Slide 34: Technical Experience and Seasoned Governance

    Technical Experience and Seasoned Governance Board of Directors Strategic Advisors Layton Croft– Executive Director David Mosher • Executive with +20 years of global minerals and mining industry experience including • Mining geologist and executive with 45+ years of global experience senior roles wi

  35. Slide 35: For more information, please contact

    For more information, please contact: Layton Croft, President & CEO Jeanny So, Corporate Communications Manager layton@thecarolinarush.com info@thecarolinarush.com www.thecarolinarush.com LinkedIn: @Carolina-Rush Twitter: @TheCarolinaRush YouTube: @CarolinaRush Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 35

  36. Slide 36: Appendix

    Appendix Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 36

  37. Slide 37: Brewer Lithology, Mineralization & Alteration

    Brewer Lithology, Mineralization & Alteration Lithology: Aluminosilicate Alteration – Proximal B21C-005: 258.8m B21C-010: 115.7m B21C-004: 477.8m B21C-015: 101.5m Topaz-only SWIR assemblage. “K-P-T” SWIR assemblage. SWIR: K-P-T + alunite. Patchy Pyrophyllite. Coarse radiating pyrophyllite, Patchy to

  38. Slide 38: Top Brewer Core Drill Results to Date

    Top 10 Brewer Core Drill Results to Date Summary of Best Results Rank Drill Hole From To Interval Au Cu Rank Drill Hole From To Interval Au Cu (m) (m) (m) (g/t) (%) (m) (m) (m) (g/t) (%) B24C-021 55.00 64.50 9.50 0.36 <0.10 B23C-018 166.50 241.00 74.50 1.10 0.12 And 76.00 86.50 10.50 0.42 0.16 Incl.

  39. Slide 39: Sawyer & New Sawyer VTEM Survey

    Sawyer & New Sawyer VTEM Survey • High Resolution airborne VTEM Survey and Magnetics Survey (2020) • Provides alteration and geological data for Targeting • Advanced exploration data covering the entire Sawyer Trend Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 39

  40. Slide 40: Sawyer Gold Mine

    Sawyer Gold Mine Gold Values in Ounce per Short Ton * The Property line does not accurately reflect the current property and gold assay values Historic mine and mineralization map have not been confirmed Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 40

  41. Slide 41: Sawyer Gold Mine

    Sawyer Gold Mine Gold Resource Block Model Colour Coded by Grade with Potential Mineral Resource Summary Historic Estimate*: • 3.9 million tonnes at 1.1 g/t Au for 134,600 oz of gold at 0.4 g/t COG Drilling: • 29 core holes • 134 RC holes • 10,081 metres (*) The Company cautions that a Qualified Per

  42. Slide 42: Sawyer Gold Mine

    Sawyer Gold Mine Surface Topography and Example of Historic Mining (View North) Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 42

Carolina Rush — Investor Presentation (February 2024) on 6ix