Southern Hemisphere Mining — Investor Presentation (May 2024)
17 slides from Southern Hemisphere Mining's investor presentation, May 20, 2024
Slide 1: ASX Announcement: Los Pumas Manganese Project in Northern Chile
ASX Announcement 20 May 2024 Los Pumas Manganese Project in Northern Chile Southern Hemisphere Mining Limited (“Southern Hemisphere” or “the Company”) (ASX: SUH, FWB: NK4) attaches a copy of a presentation of the Company’s second project, the Los Pumas Manganese Project in Northern Chile. Work on th
Slide 2: Background Information on Southern Hemisphere Mining
BACKGROUND INFORMATION ON SOUTHERN HEMISPHERE MINING: Southern Hemisphere Mining Limited is an experienced minerals explorer in Chile, South America. Chile is the world’s leading copper-producing country and one of the most prospective regions of the world for major new copper discoveries. The Compa
Slide 3: The Los Pumas Manganese Project – Chile
Southern Hemisphere Mining Ltd (ASX:SUH) No 2 Project Manganese Battery Metals The Los Pumas Manganese Project – Chile 100% owned Page 1
Slide 4: Disclaimer
Disclaimer Disclaimer Notice This presentation has been prepared by Southern Hemisphere Mining Limited a.c.n 140 494 784 (“SUH”, “Southern Hemisphere” or the “Company”). This presentation contains certain forward – looking information and forecasts. Such forecasts, projections and information are no
Slide 5: Los Pumas Battery Manganese Project
Bolivia ~ Los Pumas + 4 Salas ti Paraguay Battery Manganese Project Mn for EV. Battery Market b. for production of NCM & HPMSM Mae: ig thie Argentina : “5 SOUTHERN coe a +) HEMISPHERE 4 mining limited Page 3 SOUTHERN HEMISPHERE
Slide 6: Manganese – A Growing Demand
Manganese – A Growing Demand ❑ Manganese (Mn) is the fourth most used metal on earth in terms of tonnage, ❑ Mn price rising ❑ Offtake parties interested in Electrolytic Manganese for steel manufacture, ❑ HPMSM manufacture alternative process route ❑ Used in steel, specialty alloys and aluminium prod
Slide 7: The Los Pumas Manganese Project
The Los Pumas Manganese Project ❑ Project 100% owned by Southern Hemisphere Mining located in northern Chile ❑ Mineral Resource Estimate – 30.2Mt @ 6.24% Mn (2.5% Mn Cut Off Grade) | ASX release 3 May 2023 ❑ 38% Mn concentrate from initial metallurgical Test work ❑ Low Iron & Phosphorous, High Silic
Slide 8: Geology and Mineralisation
Geology and Mineralisation Page 6
Slide 9: Substantial Exploration and Resource Upgrade Potential
Substantial Exploration and Resource Upgrade Potential Page 7
Slide 10: Los Pumas Manganese Resource - May 2023
Los Pumas Manganese Resource - May 2023 ❑ Independent consultants, Global Commodity Solutions, estimated the Resource for the Los Pumas Manganese Project. The updated Mineral Resource has been estimated in accordance with the guidelines set in the 2012 JORC. ❑ 27.5% increase in the JORC Mineral Ore
Slide 11: Simple Geology – Good mining parameters
Simple Geology – Good mining parameters ❑ Sub-horizontal mineralization (in top 20 meters) with negligible stripping in early years ❑ Excellent potential to increase resources laterally and deeper ❑ Resource limited to drilling ❑ Drilled on average to 27 meters depth ❑ Vertical feeder zones have not
Slide 12: Los Pumas - Location
Los Pumas - Location ❑ Los Pumas located in northern Chile ❑ 175km from Arica (Port city) ❑ Main port for Bolivia ❑ Exports & Imports Tin, Steel, Lead concentrate & Soya ❑ Location is close to USA west coast and China for optimal end user supply Page 10
Slide 13: Los Pumas - Infrastructure
Los Pumas - Infrastructure ❑ Arica – La Paz railway line runs next to Los Pumas ❑ Chapinquina Hydroelectric Power ~ 55km from Los Pumas ❑ Town of Putre ~~2,500popn, 35km - workers, logistics and equipment support Page 11
Slide 14: Los Pumas - Logistics
Los Pumas - Logistics ❑ 175km by sealed road and railway to the Arica port town (230k popn) ❑ Arica – La Paz railway line re-opened May 21 ❑ Opportunities for lower transport costs Page 12
Slide 15: Next Steps
Next Steps ❑ Secure equity interests from offtake partners for funding for DFS ❑ Commence DFS to develop the Los Pumas Manganese Project ❑ Finance and construction stages Engineering Consultants for prelim preparation for the DFS engineering and scope commenced Page 13
Slide 16: Company Board and Management
Company Board and Management ❑ SUH Board & Management: Our Team Knows Critical Minerals ❑ Over 40 years combined mine discovery, development and / or operating experience internationally Internationally experienced resource sector executive. Founding Chairman of Mawson West Ltd; an international cop
Slide 17: Carbon Neutrality Concepts
Carbon Neutrality Concepts ❑ Emissions impact will be an integral part of our project plan and possible future mine design, not an add-on or an afterthought ❑ Minimise transportation of consumables and people to/from site ❑ Energy efficiency key consideration for all mine processing equipment ❑ Wate