Apa Group · ASX:APA

Apa — Corporate Update (August 2018)

30 slides from Apa's corporate update, August 2018

  1. Slide 1: Crib Point Pakenham Pipeline Community Information Sessions

    crib point pakenham pipeline community information sessions july /august 2018 July/August 2018

  2. Slide 2: Agenda and protocols

    Agenda and protocols July/August 2018

  3. Slide 3: Agenda

    Agenda • APA presentation (30-40 mins)  Who is APA  Key concerns  The Project  Pipeline construction overview  Approvals process and overview of environmental investigations • Questions and Answers (50-60 mins) • Follow up one-on-one questions and discussions with public and APA and AGL project

  4. Slide 4: Protocols

    Protocols • All pipeline topics available for comment and questions • AGL project elements can be directed to AGL during the Q&A session, though today is principally about the pipeline • Highly technical questions may be answered briefly and followed up with written advice to questioner • One person

  5. Slide 5: About APA

    about APA July/August 2018

  6. Slide 6: Gas transmission and distribution

    Gas transmission 15,134 kms of transmission pipelines, including 7,500 kms in the East Coast Grid. Gas distribution We manage 28,424 kms of gas mains & pipelines, serving 1.3 million gas consumers July/August 2018 6

  7. Slide 7: Key items to be addressed

    key items to be addressed environmental referrals pipeline route selection pipeline impacts on Ramsar wetlands July/August 2018

  8. Slide 8: Project overview

    project overview July/August 2018

  9. Slide 9: Crib Point Pakenham pipeline overview

    crib point pakenham pipeline Overview Pipeline overview: • Pipeline Project is between existing Length Approx. 55km jetty facilities at Crib Point (south of Hastings) and Pakenham Material Epoxy coated high strength steel line pipe Diameter 600mm • Project supports AGL’s proposal to import natural g

  10. Slide 10: APA relationship with AGL

    APA relationship with AGL • APA has entered into a development agreement with AGL to undertake development of the pipeline • APA is the proponent for the pipeline and will own and operate the asset • The AGL Crib Point Project and the APA Pipeline Project are subject to further project approvals and

  11. Slide 11: Regulatory approvals

    regulatory approvals July/August 2018

  12. Slide 12: Environmental referrals

    environmental referrals • APA and AGL currently preparing environmental referrals (State and Commonwealth)  Likely submission of these to regulators in mid to late- August 2018 We are • The Projects generally have separate temporal here and spatial impacts  Pipeline impacts during construction and

  13. Slide 13: Approvals and consultation process

    approvals and consultation process Approvals Consultation late initial feasibility investigations project announcement 2017 • Initial route option study • Project announced and collateral on APA • Approval of pipeline consultation website plan • Initial stakeholder and landowner contact program Earl

  14. Slide 14: Pipeline construction overview

    pipeline construction overview July/August 2018

  15. Slide 15: Crib Point Pakenham pipeline - proposed route

    crib point pakenham pipeline - proposed route July/August 2018 15

  16. Slide 16: Construction - overview

    construction - overview • Pipeline construction methods dependent on location and constraints  Open agricultural land  Sensitive environmental and vegetated areas  Urban and industrial land  Crossing of major infrastructure (e.g. road, rail) • APA construction planning taking into account both s

  17. Slide 17: Construction - typical layout

    construction - typical layout Open-cut 10m 20m HDD 10/08/2016 2018 July/August 17

  18. Slide 18: Construction - street works

    construction - street works • APA proposed an alignment that utilises the verge and service road of Frankston Flinders Road through Hastings  Between Reid Parade and Graydens Road • Complex route selection and congested existing linear corridors • Consultation undertaken with council and VicRoads t

  19. Slide 19: Construction - timelapse video

    construction - timelapse video https://youtu.be/-a8GyaZKyaU 10/08/2016 2018 July/August 19

  20. Slide 20: Construction - reinstatement of land

    construction - reinstatement of land Construction Pipeline corridor during construction (January 2017) Rehabilitation Pipeline corridor after rehabilitation (July 2017) 10/08/2016 2018 July/August 20

  21. Slide 21: Technical investigations

    technical investigations July/August 2018

  22. Slide 22: Pipeline route selection

    pipeline route selection  Terrain  Accessibility  Public and worker safety  High density land use  Length  No. of landowners / parcels  Environment – Reserves, Conservation Areas  High-value agricultural land  Heritage  Linear co-location  Operational challenges 10/08/2016 2018 July/Augus

  23. Slide 23: Supplementary route analysis

    supplementary route analysis 10/08/2016 2018 July/August 23

  24. Slide 24: Technical investigations - overview

    technical investigations - overview • Various technical investigations have been completed to support APA’s design and regulatory approvals processes • These investigations include:  Ecology – terrestrial and aquatic  Heritage – Aboriginal and European  Acid Sulfate Soil assessment  Hydrogeologi

  25. Slide 25: Technical investigations - ecology update

    technical investigations - ecology update • Ecological assessment undertaken from November 2017 – including over 100 individual site assessments • Most areas subject to invasion by exotic species to a varying extent • Project impacts to native vegetation  Less than 10ha of vegetation which includes

  26. Slide 26: Ramsar wetlands - aquatic and hydrogeology

    Ramsar wetlands - aquatic and hydrogeology • Westernport is an internationally listed Ramsar Significant Wetland • Proposed pipeline alignment crosses the Ramsar boundary at two locations  Within Warringine Park, south of Hastings (approx. 300m)  Watson’s Creek, Somerville (approx. 330m) • Ecologi

  27. Slide 27: Technical investigations - GHG emissions and noise

    technical investigations - GHG emissions and noise Greenhouse Gas Emissions Assessment • APA has assessed the GHG emissions from the 55km pipeline and two facilities at Crib Point and Pakenham • Pipeline GHG emissions are below 50,000 tonnes of CO2 equivalent per annum – below the Environment Effect

  28. Slide 28: Technical investigations - landscape

    technical investigations - landscape • Following construction and rehabilitation there is very little visual impact of the pipeline  Pipeline warning markers are installed to maintain a visual reminder of the location of the pipeline  Locations in accordance with the Australian Standard (AS2885) 

  29. Slide 29: Where can I find more information?

    Where can I find more information? A range of detailed information is available on the project website including: • Project information flyer • Preliminary activity summary brochure • detailed landowner reference guide (copies available today) • details of upcoming consultation activities • Technica

  30. Slide 30: Further information

    further information APA – Crib Point Pakenham Pipeline Freecall: 1800 531 811 Email: cribpointpakenham@apa.com.au AGL – Crib Point Project https://www.agl.com.au/cribpoint DELWP – Pipeline Regulation Division https://www.energy.vic.gov.au/pipelines Energy Safe Victoria www.esv.vic.gov.au July/August