Blackwolf Copper and Gold Ltd

Blackwolf Copper and Gold — Investor Presentation (June 2021)

32 slides from Blackwolf Copper and Gold's investor presentation, Jun 16, 2021

  1. Slide 1: Corporate Presentation

    Corporate Presentation From the N orth, For the N orth June16, 2021 TSX-V:BWCG

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT DISCLAIMER The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning the Company and should be read in conjunction with all other disclosure documents of the Company. The information contained herein is

  3. Slide 3: Corporate Vision

    CORPORATE VISION Blackwolf’s founding Vision is to be an industry leader in transparency, inclusion, and innovation. The future of mining is Environmental, Social and Corporate Governance (ESG). The world’s largest investors are demanding it now. TSX-V:BWCG 3

  4. Slide 4: About Blackwolf

    ABOUT BLACKWOLF 100% interest in advanced-stage Cu, Au, Ag, Zn Niblack Project, SE Alaska ✓ Tidewater access with Significant drilling & infrastructure, recent engineering, community engagement & environmental baseline studies ✓ Newly confirmed geological interpretation = resource expansion & discov

  5. Slide 5: Blackwolf Status Update

    BLACKWOLF STATUS UPDATE • New management and board of directors team, corporate vision and structuring in 2020 • $5.4 million financing at $0.80 April, 2021 • Q4 2020 - 10 hole, 1,774 m Phase 1 drilling at high-grade historic Niblack Mine - results May 3, 2021 • New claims staked, considering additi

  6. Slide 6: Blackwolf Project Locations

    BLACKWOLF PROJECT LOCATIONS Southeast Alaska / Northwest BC Hyder Claims OPEN OPEN OPEN OPEN OPEN TSX-V:BWCG 6

  7. Slide 7: Lookout Zone 2021 Drilling

    LOOKOUT ZONE 2021 DRILLING TSX-V:BWCG 7

  8. Slide 8: Niblack Mine 2020 Results

    NIBLACK MINE 2020 RESULTS Highlights from Q4 2020 10 hole, 1,774m drilling program : • LO20-213: 11.08m avg 2.33% Cu, 2.98 g/t Au, 45.0 g/t Ag, 1.78% Zn or 5.52% Cu equiv. • LO20-213: 5.50m avg 4.32% Cu, 1.36 g/t Au, 30.8 g/t Ag, 4.43% Zn or 7.15% Cu equiv. • LO20-215: 7.59m avg 5.18% Cu, 2.66 g/t A

  9. Slide 9: Niblack Mine 2020 Results

    NIBLACK MINE 2020 RESULTS TSX-V:BWCG 9

  10. Slide 10: Hyder Area Claims Staked

    HYDER AREA CLAIMS STAKED • Last unexplored area of Golden Triangle • Staking recently completed; 3,689 hectares in two blocks. Exploration to commence imminently • Very limited modern exploration; numerous high-grade historic mines and prospects • Significant glacial melt and new geological models.

  11. Slide 11: Golden Triangle Geology

    GOLDEN TRIANGLE GEOLOGY TSX-V:BWCG 11

  12. Slide 12: Texas Creek and Cantu Claims

    TEXAS CREEK AND CANTU CLAIMS TSX-V:BWCG 12

  13. Slide 13: Blackwolf's Strategy

    BLACKWOLF’S STRATEGY Efficient Hub and Spoke Model ▪ High-grade base and precious metal ores ▪ Smaller environmental footprint deposits ▪ Located near tidewater ▪ Grow deposits through continued exploration ▪ Central processing facility Niblack Mine Central Processing Mine TSX-V:BWCG 13

  14. Slide 14: Niblack Project Highlights

    NIBLACK PROJECT HIGHLIGHTS • 100% interest 6,200 acre copper-gold-rich massive sulphide project, located at tidewater with past-production • Globally analagous to Bisha VMS Deposit (formerly Nevsun) with similar potential • NI43-101 resource of potentially bulk- mineable Cu-Au-Ag-Zn • Newly confirme

  15. Slide 15: Current Resource

    CURRENT RESOURCE Au Ag Cu Zn Niblack Tonnes Cu (%) (g/t) (g/t) Zn (%) (Mlb) Au (oz) Ag (oz) (Mlb) Indicated Lookout 5,638,000 0.95 1.75 29.52 1.73 118.1 317,220 5,351,052 215.0 Total 5,638,000 0.95 1.75 29.52 1.73 118.1 317,220 5,351,052 215.0 Inferred Lookout 2,370,000 0.73 1.42 21.63 1.17 38.1 108

  16. Slide 16: >5km Trend & Select Intercepts

    >5KM TREND & SELECT INTERCEPTS TSX-V:BWCG 16

  17. Slide 17: Revised Geological Interpretation

    REVISED GEOLOGICAL INTERPRETATION Overturned Antiform / Synform TSX-V:BWCG 17

  18. Slide 18: Host Rhyolite Horizon: Previous Interpretation

    HOST RHYOLITE HORIZON Previous interpretation (yellow) 43-101 Indicated Resource Zone Mafic/Felsic Mafic rocks rocks TSX-V:BWCG 18

  19. Slide 19: Host Rhyolite Horizon: New Interpretation

    HOST RHYOLITE HORIZON New Interpretation (purple) Q4 2020 Drilling Location TSX-V:BWCG 19

  20. Slide 20: 2021 Drill Plans and Targets

    2021 DRILL PLANS and Targets Lookout, Dama & Historic Niblack Mine Lookout Deposit • Underground drilling to extend down-dip of high grade zone • Westerly step-out drilling from underground to add high-grade tonnage Historic Niblack Mine • Q2 phase 2 stepout drilling to from Q4 2020 holes Dama Zone

  21. Slide 21: Lookout Deposit High Grade Core Open for Expansion

    LOOKOUT DEPOSIT High Grade Core Open for Expansion TSX-V:BWCG 21

  22. Slide 22: Lookout Deposit Downdip Exploration Drilling

    LOOKOUT DEPOSIT Downdip Exploration Drilling TSX-V:BWCG 22

  23. Slide 23: 2021 Drill Plans: High-Grade Dama Zone

    2021 DRILL PLANS High-Grade Dama Zone • Very high-grade Dama Zone discovered in 90s • 2001 USDA NFS implemented Roadless Rule prohibiting road construction and timber harvesting • October 2020 – USDA granted exemption to the Roadless Rule for SE Alaska TSX-V:BWCG 23

  24. Slide 24: Strong Mining Fundamentals

    STRONG MINING FUNDAMENTALS • Past production in early 20th century • 850 metre production size tunnel (2008) Lookout Deposit Block Model • Resource has good internal continuity • Ideal setting for bulk mining methods (i.e. longhole stoping) Average width: 15 metres Maximum width: 100 metres Average

  25. Slide 25: Excellent Metallurgy

    EXCELLENT METALLURGY Highlights: Strong Cu recoveries, from 94.3% to 94.9% in copper concentrate Strong Zn recoveries, from 90.2% to 93.3% in zinc concentrate Gold Recoveries average 72%, silver 76%; studies underway to improve Low penalty element concentration was observed in copper concentrate for

  26. Slide 26: Environment, Permitting, Community

    ENVIRONMENT, PERMITTING, COMMUNITY • Management has strong track record of community & indigenous engagement, advanced project permitting • Existing liabilities at Niblack; bonding & water treatment in place • Active Discussions ongoing with Communities and Indigenous Groups • Land tenure at Niblack

  27. Slide 27: Contact

    CONTACT Rob McLeod, P.Geo. Tom Kenney President, CEO & Director Corporate Communications (604) 617-0616 (587) 777-4333 rm@bwcg.ca tk@bwcg.ca 1800 - 555 Burrard, PO Box 220 Vancouver, BC V7X 1M9 (604) 343-2997 Twitter @BlackwolfCuAu info@blackwolfcopperandgold.com TSX-V:BWCG 27

  28. Slide 28: Appendix

    APPENDIX TSX-V:BWCG 28

  29. Slide 29: Management & Directors

    MANAGEMENT & DIRECTORS Robert McLeod, P.Geo., President, CEO & Director >25 yrs in mineral exploration & mining, past VP Exploration Underworld Resources (sold $140M) & CEO for IDM Mining (merged w/ Ascot Resources), past Chair of AME BC. Ryan Weymark, P.Eng., VP of Project Development Project manag

  30. Slide 30: Phase I Metallurgical Program

    PHASE I METALLURGICAL PROGRAM Heatherdale has completed a review of existing metallurgical testwork and has initiated a Phase I metallurgical program, focused on improving precious metal recoveries for the Niblack deposit. Phase I Metallurgical Program • Complete a more in-depth desktop bulk ore sor

  31. Slide 31: Site Infrastructure

    SITE INFRASTRUCTURE Accessible Deep Water at Niblack Anchorage Gravina Island Industrial Complex (potential) Dock & Barge Camp Supply Barge 1km of Underground Workings TSX-V:BWCG 31

  32. Slide 32: Surface Exploration: IP Geophysics and Soil Sampling

    SURFACE EXPLORATION IP Geophysics and Soil Sampling 2021 – targeting 5 km strike extension of host horizon TSX-V:BWCG 32

Blackwolf Copper and Gold — Investor Presentation (June 2021) on 6ix