Blackwolf Copper and Gold — Investor Presentation (June 2021)
32 slides from Blackwolf Copper and Gold's investor presentation, Jun 16, 2021
Slide 1: Corporate Presentation
Corporate Presentation From the N orth, For the N orth June16, 2021 TSX-V:BWCG
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT DISCLAIMER The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning the Company and should be read in conjunction with all other disclosure documents of the Company. The information contained herein is
Slide 3: Corporate Vision
CORPORATE VISION Blackwolf’s founding Vision is to be an industry leader in transparency, inclusion, and innovation. The future of mining is Environmental, Social and Corporate Governance (ESG). The world’s largest investors are demanding it now. TSX-V:BWCG 3
Slide 4: About Blackwolf
ABOUT BLACKWOLF 100% interest in advanced-stage Cu, Au, Ag, Zn Niblack Project, SE Alaska ✓ Tidewater access with Significant drilling & infrastructure, recent engineering, community engagement & environmental baseline studies ✓ Newly confirmed geological interpretation = resource expansion & discov
Slide 5: Blackwolf Status Update
BLACKWOLF STATUS UPDATE • New management and board of directors team, corporate vision and structuring in 2020 • $5.4 million financing at $0.80 April, 2021 • Q4 2020 - 10 hole, 1,774 m Phase 1 drilling at high-grade historic Niblack Mine - results May 3, 2021 • New claims staked, considering additi
Slide 6: Blackwolf Project Locations
BLACKWOLF PROJECT LOCATIONS Southeast Alaska / Northwest BC Hyder Claims OPEN OPEN OPEN OPEN OPEN TSX-V:BWCG 6
Slide 7: Lookout Zone 2021 Drilling
LOOKOUT ZONE 2021 DRILLING TSX-V:BWCG 7
Slide 8: Niblack Mine 2020 Results
NIBLACK MINE 2020 RESULTS Highlights from Q4 2020 10 hole, 1,774m drilling program : • LO20-213: 11.08m avg 2.33% Cu, 2.98 g/t Au, 45.0 g/t Ag, 1.78% Zn or 5.52% Cu equiv. • LO20-213: 5.50m avg 4.32% Cu, 1.36 g/t Au, 30.8 g/t Ag, 4.43% Zn or 7.15% Cu equiv. • LO20-215: 7.59m avg 5.18% Cu, 2.66 g/t A
Slide 9: Niblack Mine 2020 Results
NIBLACK MINE 2020 RESULTS TSX-V:BWCG 9
Slide 10: Hyder Area Claims Staked
HYDER AREA CLAIMS STAKED • Last unexplored area of Golden Triangle • Staking recently completed; 3,689 hectares in two blocks. Exploration to commence imminently • Very limited modern exploration; numerous high-grade historic mines and prospects • Significant glacial melt and new geological models.
Slide 11: Golden Triangle Geology
GOLDEN TRIANGLE GEOLOGY TSX-V:BWCG 11
Slide 12: Texas Creek and Cantu Claims
TEXAS CREEK AND CANTU CLAIMS TSX-V:BWCG 12
Slide 13: Blackwolf's Strategy
BLACKWOLF’S STRATEGY Efficient Hub and Spoke Model ▪ High-grade base and precious metal ores ▪ Smaller environmental footprint deposits ▪ Located near tidewater ▪ Grow deposits through continued exploration ▪ Central processing facility Niblack Mine Central Processing Mine TSX-V:BWCG 13
Slide 14: Niblack Project Highlights
NIBLACK PROJECT HIGHLIGHTS • 100% interest 6,200 acre copper-gold-rich massive sulphide project, located at tidewater with past-production • Globally analagous to Bisha VMS Deposit (formerly Nevsun) with similar potential • NI43-101 resource of potentially bulk- mineable Cu-Au-Ag-Zn • Newly confirme
Slide 15: Current Resource
CURRENT RESOURCE Au Ag Cu Zn Niblack Tonnes Cu (%) (g/t) (g/t) Zn (%) (Mlb) Au (oz) Ag (oz) (Mlb) Indicated Lookout 5,638,000 0.95 1.75 29.52 1.73 118.1 317,220 5,351,052 215.0 Total 5,638,000 0.95 1.75 29.52 1.73 118.1 317,220 5,351,052 215.0 Inferred Lookout 2,370,000 0.73 1.42 21.63 1.17 38.1 108
Slide 16: >5km Trend & Select Intercepts
>5KM TREND & SELECT INTERCEPTS TSX-V:BWCG 16
Slide 17: Revised Geological Interpretation
REVISED GEOLOGICAL INTERPRETATION Overturned Antiform / Synform TSX-V:BWCG 17
Slide 18: Host Rhyolite Horizon: Previous Interpretation
HOST RHYOLITE HORIZON Previous interpretation (yellow) 43-101 Indicated Resource Zone Mafic/Felsic Mafic rocks rocks TSX-V:BWCG 18
Slide 19: Host Rhyolite Horizon: New Interpretation
HOST RHYOLITE HORIZON New Interpretation (purple) Q4 2020 Drilling Location TSX-V:BWCG 19
Slide 20: 2021 Drill Plans and Targets
2021 DRILL PLANS and Targets Lookout, Dama & Historic Niblack Mine Lookout Deposit • Underground drilling to extend down-dip of high grade zone • Westerly step-out drilling from underground to add high-grade tonnage Historic Niblack Mine • Q2 phase 2 stepout drilling to from Q4 2020 holes Dama Zone
Slide 21: Lookout Deposit High Grade Core Open for Expansion
LOOKOUT DEPOSIT High Grade Core Open for Expansion TSX-V:BWCG 21
Slide 22: Lookout Deposit Downdip Exploration Drilling
LOOKOUT DEPOSIT Downdip Exploration Drilling TSX-V:BWCG 22
Slide 23: 2021 Drill Plans: High-Grade Dama Zone
2021 DRILL PLANS High-Grade Dama Zone • Very high-grade Dama Zone discovered in 90s • 2001 USDA NFS implemented Roadless Rule prohibiting road construction and timber harvesting • October 2020 – USDA granted exemption to the Roadless Rule for SE Alaska TSX-V:BWCG 23
Slide 24: Strong Mining Fundamentals
STRONG MINING FUNDAMENTALS • Past production in early 20th century • 850 metre production size tunnel (2008) Lookout Deposit Block Model • Resource has good internal continuity • Ideal setting for bulk mining methods (i.e. longhole stoping) Average width: 15 metres Maximum width: 100 metres Average
Slide 25: Excellent Metallurgy
EXCELLENT METALLURGY Highlights: Strong Cu recoveries, from 94.3% to 94.9% in copper concentrate Strong Zn recoveries, from 90.2% to 93.3% in zinc concentrate Gold Recoveries average 72%, silver 76%; studies underway to improve Low penalty element concentration was observed in copper concentrate for
Slide 26: Environment, Permitting, Community
ENVIRONMENT, PERMITTING, COMMUNITY • Management has strong track record of community & indigenous engagement, advanced project permitting • Existing liabilities at Niblack; bonding & water treatment in place • Active Discussions ongoing with Communities and Indigenous Groups • Land tenure at Niblack
Slide 27: Contact
CONTACT Rob McLeod, P.Geo. Tom Kenney President, CEO & Director Corporate Communications (604) 617-0616 (587) 777-4333 rm@bwcg.ca tk@bwcg.ca 1800 - 555 Burrard, PO Box 220 Vancouver, BC V7X 1M9 (604) 343-2997 Twitter @BlackwolfCuAu info@blackwolfcopperandgold.com TSX-V:BWCG 27
Slide 28: Appendix
APPENDIX TSX-V:BWCG 28
Slide 29: Management & Directors
MANAGEMENT & DIRECTORS Robert McLeod, P.Geo., President, CEO & Director >25 yrs in mineral exploration & mining, past VP Exploration Underworld Resources (sold $140M) & CEO for IDM Mining (merged w/ Ascot Resources), past Chair of AME BC. Ryan Weymark, P.Eng., VP of Project Development Project manag
Slide 30: Phase I Metallurgical Program
PHASE I METALLURGICAL PROGRAM Heatherdale has completed a review of existing metallurgical testwork and has initiated a Phase I metallurgical program, focused on improving precious metal recoveries for the Niblack deposit. Phase I Metallurgical Program • Complete a more in-depth desktop bulk ore sor
Slide 31: Site Infrastructure
SITE INFRASTRUCTURE Accessible Deep Water at Niblack Anchorage Gravina Island Industrial Complex (potential) Dock & Barge Camp Supply Barge 1km of Underground Workings TSX-V:BWCG 31
Slide 32: Surface Exploration: IP Geophysics and Soil Sampling
SURFACE EXPLORATION IP Geophysics and Soil Sampling 2021 – targeting 5 km strike extension of host horizon TSX-V:BWCG 32
Blackwolf Copper and Gold — Investor Presentation (June 2021) on 6ix