Tidewater Midstream & Infrastructure Ltd. · TSX:TWM

Tidewater Midstream & Infrastructure — SIS Global Forum 2019

16 slides from Tidewater Midstream & Infrastructure's conference presentation, September 2019

  1. Slide 1: Business Model Support via VMGSim at a Canadian Midstream Company

    TIDEWATER MIDSTREAM & INFRASTRUCTURE LTD Business Model Support via VMGSim at a Canadian Midstream Company SIS Global Forum 2019 – September : TWM

  2. Slide 2: Agenda

    Agenda § Tidewater Corporate Profile § Key Processing Facilities and Infrastructures § Gas Processing Plants § Gas and NGL Pipeline Infrastructures § Recent and Current Developments § Western Canada: Montney, Deep Basin § VMGSim Product Applications § Modeling § Support for New Developments § Operat

  3. Slide 3: Tidewater Corporate Profile

    Tidewater Corporate Profile Stock Symbol TSX: TWM Common Shares Outstanding ~331 million Insider Ownership (Fully Diluted) ~6.0% Market Capitalization1 $453 million Enterprise Value2 $878 million Total Midstream Processing >1.5 Bcf/day / >1 Bcf/day Capacity (gross/net) and Length of >2,500 mi / >1,9

  4. Slide 4: Tidewater is a High Growth Midstream Company

    Tidewater is a High Growth Midstream Company Connectivity Strategy 1 u Tidewater Pioneer Pipeline network backed by 15 year take-or- pay with TransAlta. Offers producers direct connectivity from wellhead, through Tidewater’s extensive processing network direct to an end market u Own key NGL, oil and

  5. Slide 5: Corporate Responsibility

    Corporate Responsibility Ø Phasing Out Coal-Generated Electricity Ø The Pioneer Pipeline increases the amount of natural gas TransAlta co-fires at its Sundance and Keephills generating stations to facilitate the reduction of carbon emissions and costs Ø Health, Safety & Environment Ø Tidewater’s hea

  6. Slide 6: Tidewater Facilities and Connectivity

    Tidewater Facilities and Connectivity 6

  7. Slide 7: Montney Assets & Newly Commissioned Pipestone Gas Plant

    Montney Assets & Newly Commissioned Pipestone Gas Plant Ø Pipestone Gas Plant built and fully contracted Ø 100 MMscfd 5% Sour Gas Processing Facility, Deep Cut, 150 bbls/MMscf condensate stabilization, 100 bbls/MMscf C2+ recovery Montney Processing Facilities & Pipelines Ø Construction complete Augu

  8. Slide 8: Pipestone Development

    Pipestone Development Diameter ODM 2° 10°. 8.6 4 Scrvice Fluid: 5° Sour Gas. Fuel Gas = HE Liquids. Total ROWEsECing this. 82 mi * Total’ Pipe Ecngth 83 mi

  9. Slide 9: Overview of Deep Basin Assets

    Overview of Deep Basin Assets Ø Pioneer Pipeline physically connects Tidewater’s largest gas Deep Basin Processing Facilities & Pipelines processing complex (Brazeau River Complex-BRC) to a large new demand source in TransAlta’s Sundance and Keephills power plants and is anchored by a 15 year take-o

  10. Slide 10: Pioneer Coal to Gas Project

    Pioneer Coal to Gas Project Diameter OD: 20” NPS, 1,440 psi MOP Service Fluid: Sweet Natural Gas Total Length: 81 mi Mainline Length: 119 km Sundance Lateral: 11 km Capacity: Sundance Power Plant Startup (2019): 130 MMscf/d Future: 400+ MMscf/d Keephills Power Plant Purpose: Power Generation, Coal D

  11. Slide 11: Virtual Materials Group (VMG) Product Applications

    Virtual Materials Group (VMG) Product Applications Case 1: Effective Transportation of Raw Feed/Sales Products at Tidewater Facilities Decision process supported by VMGSim (Process) and Pipe Workspace Ø Selection of optimal pipe dimeter for current commercial demand and future growth Ø Case study ba

  12. Slide 12: Virtual Materials Group (VMG) Product Applications

    Virtual Materials Group (VMG) Product Applications Case 2: Operational Troubleshooting (cont’d) Ø Maximize C2 content in C2 spec streams and maximize C3-mix product that is ideal for fractionation Ø Optimizer functionality built into model of a processing facility with four gas processing trains acc

  13. Slide 13: Virtual Materials Group (VMG) Product Applications

    Virtual Materials Group (VMG) Product Applications Case 3: Gas Processing, Operator Training Ø Fort Saskatchewan Plant Operator Screen Ø Operator HMI image imbedded into Excel and Symmetry linked via Excel Add-In Ø Provides familiar workspace and displays only data operations can historize Ø Used to

  14. Slide 14: What's Next

    What’s Next Integrated Digital Technologies for Midstream Developments Asset and Project Development Decision Support Ø Feasibility Ø Cost and Schedule Estimating Ø Operability Operations and Design / Definition •Pre-FEED •Safety Maintenance •Key Inputs •Quality •Key Objectives (Products) •FEED •Ope

  15. Slide 15: Thank You / Questions

    Thank You / Questions Loni van der Lee Vanni N. Tomaselli Lead Process Engineer Director, Capital Projects lvanderlee@tidewatermidstream.com vtomaselli@tidewatermidstream.com +1 (587) 392-3021 +1 (587) 393-4808 Tidewater Midstream and Infrastructure Ltd. Suite 900, 222 3rd Avenue SW Calgary, AB T2P

  16. Slide 16: Virtual Materials Group (VMG) Product Applications

    Virtual Materials Group (VMG) Product Applications •Minimize •Determine ‘why’ Operational Upsets and ‘what’ •Maximize Efficiency •Advise on and Reliability Operational Adjustments Maximize Plant Process Value to Modeling Producers Support Competitive Continuous and Early Operational Investment Monit