Slide 1: Innovation and Technology
Innovation and Technology 27 September 2019 1 © Subsea 7 - 2019 subsea7.com
Slide 2: Introduction
Introduction Isabel Green, Head of Investor Relations 2 © Subsea 7 - 2019 subsea7.com
Slide 3: Early engagement, long distance tie-backs, technology enablers
EARLY ENGAGEMENT LONG DISTANCE TIE-BACKS TECHNOLOGY ENABLERS COST-EFFICIENT PIPELINE SUBSEA AUTONOMY, IRM & RENEWABLE ENERGY & 3 MATERIALS DIVING © Subsea 7 - 2019 SUSTAINABILITY subsea7.com
Slide 4: Agenda
Agenda Monica Thomas Darren Giles Arne Michelle James Richard 4 © Subsea 7 - 2019 subsea7.com
Slide 5: Our Vision and Values framework
Our Vision and Values framework 5 © Subsea 7 - 2019 subsea7.com
Slide 6: © Subsea 7 - 2019 subsea7.com
6 © Subsea 7 - 2019 subsea7.com
Slide 7: Subsea 7 in Norway
Subsea 7 in Norway Monika Bjørkmann, VP Norway 7 © Subsea 7 - 2019 subsea7.com
Slide 8: Subsea 7 on the Norwegian Continental Shelf
Subsea 7 on the Norwegian Continental Shelf Vigra Spoolbase (6-300) Wick Wester Fabrication Site Tromsø Office (1) Stavanger Main Office (425) Glasgow Pipeline Production Group Dusavik Base (24)
Slide 9: Norway 2019 Operational Highlights
Norway 2019 Operational Highlights Equinor Snorre EP Equinor Johan Castberg Equinor Johan Sverdrup Equinor IRM Equinor Askeladd Aker BP Ærfugl Aker BP Valhall Flank West and North Wintershall Nova 9 © Subsea 7 - 2019 subsea7.com
Slide 10: Snorre Highlights
Snorre Highlights Snorre field life was originally expected to last until 2011- 2014. It is now expected to produce beyond 2040. • Total length of 20,976m in three Pipeline Bundles. • The west Pipeline Bundle, at 7.619m long, is one of the longest executed from Wick Fabrication Site. • The east Pipe
Slide 11: Snorre Expansion
Snorre Expanison Technology and Innovation: • First project to incorporate Swagelining Linerbridge technology in polyethylene lined water injection lines. • Swagelining’s LinerBridge® technology is the world’s first all-polymer lining connector that removes the need for costly Corrosion Resistant Al
Slide 12: Ærfugl Highlights
Ærfugl Highlights First use of new technology enables development of Ærfugl. • Subsea 7’s first awarded EHTF project. • The application of Subsea 7’s Electrically Heat Traced Flowline (EHTF) technology to prevent hydrate formation and improve production efficiency. • Development and installation of
Slide 13: Ærfugl
Ærfugl Project Scope: • 20.3km EHTF Pipe-in-Pipe (10-inch/16- inch) and related topside equipment • Pipeline End Terminations, inline tees, inline power inlet structures and glass reinforced plastic covers. • Dynamic and static power umbilical. • Dynamic and static service umbilical. • Flying leads
Slide 14: Our technology strategy
Our technology strategy Thomas Sunde, VP Technology 14 © Subsea 7 - 2019 subsea7.com
Slide 15: Why innovate?
Why innovate? Changing Business Environment Advanced Technology Increased Competition Human Nature Make Change or Be Changed 15 © Subsea 7 - 2019 subsea7.com
Slide 16: Unlocking New Innovation Pathways
Unlocking New Innovation Pathways Innovation = Invention + Commercialisation Creativity Collaboration Source: Cambridge Method for Value Generation © Inclusion Open to New Ideas Creating a climate that Understanding the Taking a broader view enables innovation: relationships between of value creatio
Slide 17: Creating value through technology
Creating value through technology • Business driven technology innovation • Balanced portfolio of fast to market technologies and next horizon game changers Defend Leading Position Differentiate Disrupt 17 © Subsea 7 - 2019 subsea7.com
Slide 18: Our technology programmes
Digitalisation and Automation Subsea Power Distribution and Electrification Environmental Sustainability Integrated Data and Surveillance Systems* Long Tie-backs HPHT Field Developments Cost Efficient Materials Deep Water Risers Marginal Fields and Towed Solutions Lean Tie-backs System Standardisati
Slide 19: Integrated SPS SURF technology solutions
Integrated SPS SURF technology solutions • Technology provides opportunities SURF Life of Field Riser Systems within: Processing • Overall System Innovation Systems • Enhanced product portfolio Flowline Systems • Collabration creates joint value Bundles Subsea Subsea Flexibles Umbilicals 19 Processi
Slide 20: Digitalisation and Automation
Digitalisation and Automation Concept/ Source: Fieldap Engineering FEED Source: Livemint Procurement Construction Life of Field Installation 20 © Subsea 7 - 2019 subsea7.com
Slide 21: Digitalisation
Digitalisation • Strategy in development with new VP assigned. Focus areas within i-Tech 7, early engagement and Pipeline Bundles • Planning software made available by Schlumberger to Subsea Integration Alliance for early engagement • i-Tech 7 and Leidos have a 5 year digitalisation partnership agre
Slide 22: Intellectual Property (IP) in numbers
Intellectual Property (IP) in numbers • ~1500 granted and pending patents • ~230 patent families • 19 trademark families Patent Families : 228 IDFs & New Inventions Per Year RECORD COUNT CATEGORY 60 Rigid Pipelines Dynamic Riser Design 50 i-Tech Structures 40 Swagelining 30 Welding and Materials Flo
Slide 23: Field development
Field development Darren Cormell, VP Field Development
Slide 24: Early engagement
Early engagement • Forming collaborative relationships • Identifying and managing risk • Accelerating the development process • Providing robust and reliable solutions • Improving predictability of CAPEX, OPEX and TOTEX 24 © Subsea 7 - 2019 subsea7.com
Slide 25: Our flexible approach to early engagement
Our flexible approach to early engagement • All stages of the field development planning process • Integrated Field Development (IFD) • Subsea Integration Alliance • Customer alliances, partnerships, affiliates and frame agreements • Integrated Customer and 3rd party teams • Other • Integrated SURF
Slide 26: Front end resources and capability
Front end resources and capability • Access to more than 400 dedicated front end resources worldwide • Globally connected • Supported by parent company organisations • More than 600 personnel deployed on front end work daily • Extensive global study track record + +
Slide 27: Field Development Group
Field Development Group More than ever before, operators are seeking innovative, creative and reliable field development solutions to overcome the complexities facing today’s industry. From early engagement to seamless execution
Slide 28: Our supplier-led solutions
Our supplier-led solutions • Combining field development planning with execution and delivery knowhow – underpinned by foundation of core technical skills • A growing story of success – delivering value to our customers
Slide 29: Integrated Field Development Framework
Integrated Field Development Framework • Taking a holistic approach to field development – understanding to impact to production & cost for our solutions • Working within an integrated framework – deliver consistent results with confidence
Slide 30: Evolution to solution – efficient supplier-led solutions
Evolution to solution – efficient supplier-led solutions
Slide 31: Value Delivery Framework – Uncover the true value
Value Delivery Framework – Uncover the true value CAPEX Environment ■ SPS & SURF costs ■ CO2 emissions (tonne) ■ Well construction ■ CO2 financial impact (taxes) ■ Topside facilities and process ■ Hosts Uptime & Reliability ■ Improved facility availability ■ Reduced shutdown & start up impacts OPEX
Slide 32: Pipeline capabilities
Pipeline capabilities Giles Mitchell
Slide 33: Rigid pipeline delivery through local solutions and supply chain partnerships
Subsea 7 support client’s projects by offering consistent and progressive delivery of global rigid pipeline systems, through locally tailored solutions, automation and strategic supply chain partnerships. 3333 © Subsea 7 - 2019 © Subsea 7 - 2019 subsea7.com subsea7.com
Slide 34: Pipeline Bundles
A solution which integrates multiple flowline and control systems within a single steel carrier pipe with manifold structures at each end. Subsea processing functions can also be incorporated. Following full function testing onshore, the pipeline bundle is launched and transported to its offshore lo
Slide 35: Piggy-back pipeline installation
A solution to improve the efficiency of offshore installation by allowing two products to be installed simultaneously and also minimising seabed preparation. In 2012 Subsea 7 developed and patented an automated piggy-back machine allowing piggy- back pipeline installation rate to be increased from 3
Slide 36: High performance insulation coatings
A solution to improve the thermal performance of a single pipe by applying high performance insulation coatings. We have worked with a variety of suppliers and coating systems, qualifying up to 100mm thick IMPP, and high performance Ultra and NEMO FJC products. We work with clients to optimise repai
Slide 37: Pipe-in-Pipe thermal solution
A solution to improve thermal performance of a flowline by sleeving the production pipeline within an outer pipe with high performance insulation material contained within the dry annulus. Subsea 7’s high-performance PIP solution uses insulation with reduced internal pressure, offering unrivalled pe
Slide 38: Direct electrical heating systems
A solution which enables the development of subsea fields through enhanced thermal performance avoiding hydrates and wax formation. The pipeline heating system for wet insulated pipelines creates an electrical loop from a current generator located on the topsides directly connected to both ends of t
Slide 39: Electrically heat traced flowline solution
A solution which offers significantly enhanced flow assurance properties. EHTF technology allows the carried fluid to be maintained above wax or hydrate appearance temperature along its journey from the wellhead to the host facility. The system can operate either in a passive or active functionality
Slide 40: Single pipe and CRA solutions
A solution for simple field developments and where flow assurance is not a concern. Typically, the single pipe is fabricated from carbon steel with an external anti- corrosion coating. For flowlines transporting aggressive fluids the single pipe can be fabricated from solid or metallurgically clad c
Slide 41: Mechanically lined pipe (MLP) solution
A more cost-effective corrosion resistant pipeline solution as an alternative to more expensive options such as solid corrosion-resistant alloys or metallurgical clad pipe. Subsea 7 qualified MLP for use in the challenging, deepwater Sapinhoá-Lula NE field development, Brazil. MLP offers cost saving
Slide 42: Swagelining and LinerBridge solution
The most cost-effective corrosion resistant pipeline solution for water injection service. Our in-house Swagelining® system offers clients lower OPEX, reduced operational complexity and increased oil recovery through ensured injection water cleanliness. Development continues to expand the applicatio
Slide 43: Largest portfolio of deepwater riser systems
We have the largest portfolio of deepwater riser systems in the world. Subsea 7 provides deepwater and ultra-deepwater riser technology best suited to your field characteristics including extreme water depth, harsh environment, host constraints or hydrocarbon composition. 4343 © Subsea © Subsea 7 -
Slide 44: We have expanded our portfolio
We have expanded our portfolio Subsea 7 has installed over through investment in: • Technology development • State-of-the-art pipelay fleet 6,000km • Onshore fabrication facilities of flowlines and risers globally. 4444 © Subsea © Subsea 7 - 2019 7 - 2019 © Subsea 7 - 2019 subsea7.com subsea7.com
Slide 45: Pipelay fleet
Subsea 7’s pipelay fleet is designed to ensure the most technically suitable and cost-effective installation methods can be used to deliver your projects. Reel-lay, S-lay, J-lay and Towed Pipeline Bundle solutions from shallow to ultra-deepwater. 4545 © Subsea © Subsea 7 - 2019 7 - 2019 © Subsea 7 -
Slide 46: Subsea 7 Pipeline Welding Technology
Subsea 7 Pipeline Welding Technology • Dedicated Pipeline Production Team responsible for the strategic development and deployment of all aspects of pipeline welding both onshore and offshore • Fully integrated approach gives clients reduced project risk and greater schedule certainty • Global weldi
Slide 47: Future for pipeline welding- Automation of pipeline fabrication
Future for pipeline welding- Automation of pipeline fabrication • Automation feasibility study in progress including • Automation of firing line manufacturing processes • Elimination of manual operations • Automation of material movement through the firing line • Digital data capture and management
Slide 48: Electrically Heat Traced Flowline
Electrically Heat Traced Flowline Arne Skeie, Specialist Engineer
Slide 49: Background for the Electrical Trace Heating Flowline technology
Background for the Electrical Trace Heating Flowline technology • Flow assurance – EHTF solutions can remove flow assurance challenges related to hydrates and wax formation • Subsea 7 has been developing the Electrical Trace Heating Flowline (EHTF) technology for more than 10y • EHTF technology is a
Slide 50: EHTF technology differentiators
Subsea 7 Electrical Heat Tracing Flowline technology differentiators • Vacuum/reduced pressure in PiP annulus resulting in a very low U-value PiP and subsequently less required power input • Low voltage (1KV) – Reduced electrical aging of EHTF Heating wires and less challenging wet mate connections
Slide 51: EHTF Projects in progress
EHTF Projects in progress BP/Manuel - GoM • 8km tie-back in 1900m water depth • 8”/12” EHTF pipeline • Fabrication 2019 and installation 2020 AkerBP/Ærfugl phase 1 - Norway • 20km tie-back in 450m water depth • 10”/16” EHTF pipeline • Fabrication 2019 and installation 2020 AkerBP/Ærfugl phase 2 - No
Slide 52: Ærfugl field layout
Ærfugl field layout 52 © Subsea 7 - 2019 subsea7.com
Slide 53: Ærfugl EHTF Pipe-in-Pipe Cross Section
Ærfugl EHTF Pipe-in-Pipe Cross Section Performance Requirements • Arrival temperature topside 45 degrees – steady state mode • Keep production fluid at minimum 25 degrees during shut down – maintenance mode • Elevate temperature in water filled flowline from 3 C to 25 C within 40 hours – heat-up mod
Slide 54: EHTF - Technology Qualification Status
EHTF - Technology Qualification Status • Qualified according to API 17n and complying with DNV- RP-A203 • Technology Readiness Level 4 qualification testing completed last year. • TRL 5 qualification almost complete: ➢ Structure mock-up tests (ILT, ILPIS, Special Joint) - Complete ➢ Bend tests (A, B
Slide 55: EHTF - 200 m Test at Vigra
EHTF - Technology Qualification Status – 200 m Test at Vigra Fabrication Line Stalk Racks Pipe Storage Welding Tie-in Station FJC Tie-in Station Quayside Spooling Line 55 © Subsea 7 - 2019 subsea7.com
Slide 56: EHTF - 200 m Test at Vigra
EHTF - Technology Qualification Status – 200 m Test at Vigra • 2 x 100m PiP stalks fabricated at Vigra • Welded and spliced together to a 200m long stalk • Heating cables used to heat stalk, thermal testing performed • Reeled onboard lay vessel Seven Oceans • Electrical testing (IR, continuity) prio
Slide 57: Subsea Electrical Power Distribution Unit (SEPDU)
Subsea Electrical Power Distribution Unit (SEPDU) Objectives: • Enable a long step-out heating system • Reduce topside scope • Simplify subsea power cable design Status: • TRL4 achieved in 2018 • TRL5 achievement expected Q1 2021 • Several EHTF prospects require 1 or more SEPDU(s) 57 © Subsea 7 - 20
Slide 58: SEPDU Concept
SEPDU Concept SEPDU principle: • Receives MV electrical power from the host facility (e.g. a production platform or FPSO) • Reduces the voltage to the value required for EHTF heating • Provide power outputs to the EHTF power cable triplets • Can power other equipment such as MEG pump etc. SEPDU desi
Slide 59: Conclusion
Conclusion • EHTF is enabling tenchnology for a number of current projects and future prospects • All qualification tests performed to date were successful and show a robust technology development • The system demonstrates high flexibility with several ways to configure electrical architecture and o
Slide 60: Swagelining and Liner Bridge
Swagelining and Liner Bridge Michelle Tinney, Swagelining
Slide 61: Swagelining’s Integrated Liner System
Subsea 7 - Swagelining’s Integrated Liner System • Polymer lining - to provide a 50year internal corrosion barrier with material selection and full liner design service • Connectors - LinerBridge® to join pipeline stalks together to provide a continuous end to end polymer corrosion barrier • InsuLin
Slide 62: Benefits of Polymer Lining that add up
Benefits of Polymer Lining that add up DESIGNED FOR LIFE LOWER LIFE CYCLE COSTS ENHANCE FLOW Our polymer liners have a 50 year We can lower the total life Our pipeline liners are the design life, ensuring no loss in expenditure (totex) of your pipeline thinnest in the industry, hydraulic performance
Slide 63: Swagelining Process Overview
Swagelining Process Overview The Swagelining Technique • Uses principle of cold die drawing to induce residual elastic strain which results in a tight compression fitting liner, offering advantages over alternative lining methods. Long length pulls • 12-20m polymer sticks are fusion welded onsite to
Slide 64: Potential for a TOTEX Saving
Potential for a TOTEX Saving view Potential 35% cost reduction between CRA mechanically lined and polymer lined solution for reel-lay over life of line 64 © Subsea 7 - 2019 subsea7.com
Slide 65: LinerBridge
LinerBridge® A polymer connector removing the need for CRA connectors Simple, Yet Ingenious Offers a step change in project economic and risk profile, through complex CRA application removal Proven Technology Utilises robust and proven electrofusion welding technology, from utilities industry Size R
Slide 66: End terminations
End terminations Elimination of reeled CRA welding from lined pipelines • Made possible through Swagelining’s innovative use of WeldLink® technology within flange or structure terminations. Improved offshore flexibility • LinerBridge® technology allows for cut-to-length reducing metrology spool leng
Slide 67: Track Record
Track Record • 350km + pipelines protected from internal corrosion since 1994 using our proven technology: • 1994 - 1st polymer lined subsea pipe installed for Shell on Brent South Field in 1994 • 1995 – BP Foinaven water injection 10” x 12km & 12” x 4km • 1996-2003 - 53km of BP Schiehallion water i
Slide 68: Swagelining for steel catenary risers (SCR)
Swagelining for steel catenary risers (SCR) Fatigue resistant liners The inherent fatigue resistance of Swagelining’s polymer liner materials makes them the logical choice when selecting a cost effective corrosion barrier for riser applications. Weight reduction When compared to a carbon steel pipe
Slide 69: Swagelining for S-Lay
Swagelining for S-Lay Adapting qualified LinerBridge® technology Offering the industry a polymer lined pipeline solution suitable for high efficiency mechanised welding. Step-change in economics Modified LinerBridge® internal energisation system under testing With no negative impact on current S-lay
Slide 70: Swagelining for hydrocarbon service
Swagelining for hydrocarbon service Industry value The development of a polymer lining solution for hydrocarbon transportation has the capacity to deliver industry changing results. LinerVent® LinerVent® allows management of any gas permeation through the polymer liner. Qualification COREL JIP (2000
Slide 71: Autonomy and remote operations
Autonomy and remote operations James Jamieson, i-Tech 7
Slide 72: Global Trends
Global Trends • The environment • Cost of services • Digitalisation Customer • Environmental Impact, reduced CO2 • Increased value, lower cost • Smarter use of data Vehicle Remote Control & Autonomy Technology • High bandwidth communications, 4G/5G • Portable energy, batteries • Autonomous systems L
Slide 73: Remote Tasks
Remote Tasks Inspection Repair - ROV - Heavy Intervention - General Visual Inspection - Crane / Module handling - High power tasks Vehicle on task Operations Maintenance - Light Intervention - Torque tool - Manipulator operations 73 i-Tech 7 is a Subsea 7 brand, © Subsea 7, i-Tech Limited 2019 i-Tec
Slide 74: Remote Onshore Control
Remote Onshore Control Sim-Ops temporary drop-off vehicle Unmanned Surface Vessel (USV/UVV combination) Seabed Hosted EWROV Power Communications Seabed Hosted Electrification Autonomy (Caretaker) 74 i-Tech 7 is a Subsea 7 brand, © Subsea 7, i-Tech Limited 2019 i-Tech7.com
Slide 75: WROV Remote Piloting & Onshore Control Centre
WROV Remote Piloting & Onshore Control Centre Connection via 4G ONSHORE: Pilot and Co-Pilot Onshore Control Centres established, UK & Norway. Technology building block • High quality Low latency image transmission • 4G LTE network access (fourth-generation, high speed low latency) • Advanced control
Slide 76: Electrification
Electrification ➢ Electric Work Class ROV ➢ Electric propulsion and tooling ➢ Increased reliability ➢ Environmentally clean ➢ Seabed hosted enabled Technology building block • Advancement in POWER components • Data enabled components • Mature autonomy control • Inductive power connections • Advances
Slide 77: Seven Viking IRM vessel hybrid upgrade
Seven Viking IRM vessel hybrid upgrade • 1300 kWh energy storage (33x more than Nissan Leaf car) • Fuel saving of up to 20% • 33% reduction in engine running hours 77 i-Tech 7 is a Subsea 7 brand, © Subsea 7, i-Tech Limited 2019 i-Tech7.com
Slide 78: Autonomy
Autonomy What we mean by Autonomy Underwater ➢ Application of intelligent behaviours that enable underwater systems to operate independently ➢ Reduce the dependency on surface vessel support & required resources ➢ Increasing efficiency Technology building block • Intelligent autonomous vehicle syste
Slide 79: AIV - Planned mission vs executed
AIV - Planned mission vs executed 79 i-Tech 7 is a Subsea 7 brand, © Subsea 7, i-Tech Limited 2019 i-Tech7.com
Slide 80: Revolutionising Offshore Operations
Transforming Operations Revolutionising Offshore Operations Remote Control Autonomy Electrification Deployment 80 i-Tech 7 is a Subsea 7 brand, © Subsea 7, i-Tech Limited 2019 i-Tech7.com
Slide 81: Offshore wind and the Beatrice project
Offshore wind and the Beatrice project Richard den Holland, Seaway 7
Slide 82: Seaway 7 Business Unit Structure
Seaway 7 Business Unit Structure Renewables & Heavy Lifting Life of Field Heavy Lifting Cable Installation Integrated Solutions Foundations & Substations IAG & EXP Cable Systems Renewables EPCIs Transport & Installation EPIC, T&I & IMR Integrated Projects Zoetermeer (Netherlands) Leer (Germany) Aber
Slide 83: Seaway 7 – Fixed Offshore Wind Capabilities Resources
Seaway 7 – Fixed Offshore Wind Capabilities Resources Offices • Zoetermeer, Netherlands • Paris, France • Aberdeen, Scotland • Leer, Germany • Hamburg, Germany • Taipei, Taiwan • Local project offices Personnel Seaway Aimery and Seaway Moxie • ~500 Onshore, ~550 Offshore moored in Eemshaven Fleet •
Slide 84: Seaway 7 – Some Track Record
Seaway 7 – Fixed Offshore Wind Capabilities Some Track Record Seaway Heavy Lifting Seaway Offshore Cables Wikinger (substation) Baltic 2 OWF, 33kV Inner Array Grid Cable Walney extension (substation) System (2014-2015) Galloper (substation) Humber Gateway, 33kV Inner Array Grid Cable Merkur (substat
Slide 85: Experience – Foundations EPCI and T&I
Seaway 7 – Fixed Offshore Wind Capabilities Experience – Foundations EPCI and T&I 600+ WTG Foundations 600+ WTG 30+ Foundations Substations 85 © Subsea 7 - 2019 subsea7.com
Slide 86: Experience - Submarine Cable Systems
Seaway 7 – Fixed Offshore Wind Capabilities Experience - Submarine Cable Systems EPIC, T&I and IMR 600+ WTG Beatrice project - Foundations 30+ Substations Largest EPCI to date 86 © Subsea 7 - 2019 subsea7.com
Slide 87: Currently ongoing Renewables Projects
Seaway 7 – Fixed Offshore Wind Capabilities Currently ongoing Renewables Projects Trianel Windpark Borkum II (GER) Completed • EPCI FOU • 32x Monopiles • EPCI IAC • 32x Transition Pieces • 36x 33kV Cables (59 km) • 2x Fab. Yards Triton Knoll (UK) • T&I FOU • 90x Monopiles • T&I OSS • 92x Transition
Slide 88: Seaway 7 Technology Development
Seaway 7 – Fixed Offshore Wind Capabilities Technology Development Q3 – 2020 Crane Upgrade Boom Extension Q4 – 2019 Mono Pile Installation on DP 88 © Subsea 7 - 2019 subsea7.com
Slide 89: EPCI fixed wind case study: The Beatrice project
EPCI fixed wind case study: The Beatrice project • £2.6B project. One of the largest ever private infrastructure projects in Scotland. • Expected to power on average 450k homes over a 25 year lifetime. • Worlds deepest bottom founded offshore wind farm (55m) • Subsea 7/SHL scope at $1.3Billion is th
Slide 90: Beatrice WTG Foundations Supply Chain Management
Supply Chain Management > 100 Contracts Technip, Levator Subcontractor EEW, Steel Transition Bracings, Taewoong, TP Forged Main Frame Rollings Flange SSAB, Secondary Steel Plates Beatrice WTG Foundations Levator, TP Bifab, Jacket Fab Ecosse, Boulder Clearance Sanistaal, Secondary Steel Bladt, pin ou
Slide 91: Preparation: Some Technology Developments
Preparation Some Technology Developments • Diverless installation. • Jacket to pile grout: • BASF MasterFlow 9800 • Design code evolution • Tooling: • Pre-piling template • Pile cleaning tooling • Bauer drilling • Remote lifting 91 © Subsea 7 - 2019 subsea7.com
Slide 92: Remote Jacket Lifting Arrangement
Preparation Safety Moment Standardisation Remote Jacket Lifting Arrangement 92 © Subsea 7 - 2019 subsea7.com
Slide 93: Wind Turbine Foundations
Foundations Wind Turbine Foundations • 84 Number • Atkins design • 4 leg 4 bay jacket • Top 2 bays and TP standardised across the site. • Fixed pile spacing 24m centres • 5 clusters • Pile stick-up range 2 - 6m • Pile diameter 2.2m • Pile penetration typ. 40m. 93 © Subsea 7 - 2019 subsea7.com
Slide 94: Inner Array Cables: Cable Routing in TP
Inner Array Cables Cable Routing in TP 94 © Subsea 7 - 2019 subsea7.com
Slide 95: Floating wind expertise
Floating wind expertise Major Contracted Components of an Offshore Floating Windfarm Seaway 7‘s positioning for floating wind farms: FOWT 1. EPC of floaters & moorings 2. Integration & final assembly of the Floating Offshore Wind Turbine unit (FOWT) @ quay or in shelter area. 3. Installation of the
Slide 96: Carbon Trust - Contribution to Floating Wind JIP
Floating wind expertise Carbon Trust - Contribution to Floating Wind JIP Floating Wind Joint Industry Project (JIP) Seaway 7/SHL Lead delivery contractor Seaway Heavy Lifting (SHL) lead a second study into heavy lift offshore operations during the installation and maintenance of floating wind farm.
Slide 97: GEPS-Techno - Le Croisic 150kW demonstrator
Renewables Floating Technology Development GEPS-Techno - Le Croisic 150kW demonstrator Wave Energy converter A rolling buoy seawater turbines Support a start-up a technology to maturity Built by STX @ St Nazaire WAVEPEARL® Operational since August 2019 @ SEMREV site in France Seaway 7 contribution t
Slide 98: © Subsea 7 - 2019 subsea7.com