Slide 1: Investor Presentation
Investor Presentation June 2024 CSE: BFG | OTC: BFGFF | FWB: YW5
Slide 2: A World of Copper / Gold / Silver Opportunity
GIANT MINING CORP. A WORLD OF COPPER / GOLD / SILVER OPPORTUNITY 2
Slide 3: Company Introduction
COMPANY INTRODUCTION • Giant Mining Corp. operates in the exploration and development of the Majuba Hill Copper Property, targeting the expanding electric vehicle (EV) industry, located in the mining-supportive region of Nevada. • The company is overseen by an expanding team of professionals special
Slide 4: Management and Directors
MANAGEMENT AND DIRECTORS David Greenway – CEO & Director Natasha Sever, BCom, CPA – CFO David Greenway is a respected CEO with over 20 Natasha Sever is a highly skilled and years of expertise in managing, financing, and accomplished CFO with dual CPA designations developing growth strategies for a r
Slide 5: Directors Cont'd
DIRECTORS CONT’D Bradley J. Dixon, B.Sc., JD – Director Mr. Dixon, partner at Givens Pursley LLP and Litigation Group co-chair, brings 20+ years of experience specializing in complex commercial litigation. His expertise encompasses diverse disputes in construction, secured transactions, real estate,
Slide 6: Technical Advisors
TECHNICAL ADVISORS Buster Hunsaker, B.S., M.S. - Senior Geologist and Qualified Person Buster Hunsaker is an accomplished exploration geologist, providing comprehensive turn-key exploration services to senior and junior mining companies in North America, South America, and Mongolia. With a wealth of
Slide 7: Advisory Board
ADVISORY BOARD John Ryan, B.S., J.D. – Advisory Board Mr. Ryan has been an active entrepreneur and mining engineer in the resources sector for over twenty years. He has extensive experience in the natural resource sector having served as an officer and/or director of companies such as Bunker Hill Mi
Slide 8: Copper
COPPER • Copper is crucial for the electric vehicle (EV) industry; each EV requires approximately 183 pounds of copper for motors, batteries, and wiring, significantly more than traditional vehicles. • The current price of copper is approximately $4.33 per pound, reflecting its critical role and dem
Slide 9: Global Copper Demand
GLOBAL COPPER DEMAND • The global copper demand is forecasted to grow incrementally by 2%-3% in 2024, with total consumption expected to reach around 26 million metric tons, reflecting the increasing demand from various sectors including electric transport and energy infrastructure. • China is ant
Slide 10: Copper Price – 5 Yr
Price ($) PRICE-5 YR Historical Price of Copper (April 2019 - April 2024) Copper Price ($ per pound) 2019 2020 2021 2022 2023 Date 2024 10
Slide 11: Copper and the Race to Net-Zero
COPPER AND THE RACE TO NET-ZERO • Crucial Role in Renewable Energy: Copper is an essential component in both solar and wind energy systems, which are two primary pillars of the clean energy transition. Its superior electrical conductivity enables efficient energy transfer in solar panels and wind tu
Slide 12: Majuba Hill Copper Property, Nevada
• Location & Infrastructure • Copper Production • Advancing to a Resource Majuba Hill Copper Property, Nevada 12
Slide 13: 2023 NI43-101 Technical Report
2023 NI43-101 TECHNICAL REPORT • Primary Conclusions: “…a copper Exploration Target has been estimated with a range of between 50 million tonnes and 100 million tonnes. Estimated grades of the Exploration Target range from 0.15% Cu to 0.30% Cu. There is potential for developing a higher- grade zone
Slide 14: Location
LOCATION • Majuba Hill is in northern Nevada 251 km (156 miles) northeast of Reno, in Pershing County. • U.S. Highway 80 Interstate/Freeway from Reno. Gravel Road Access maintained by Pershing County • Property Tenure • 403 federal lode mining claims • Two private property parcels • Total of 3,404 h
Slide 15: Infrastructure
INFASTRUCTURE • Access Roads • Power Supply • Transportation • Water Supply • Ore stockpiles • Processing Space • Leach pads, Processing plant • Waste Management Space • Tailings, Waste Dumps • Administration Facilities • Offices, Communications, Safety 15
Slide 16: Historic Copper Production
HISTORIC COPPER PRODUCTION Historic underground mines at Majuba Hill produced copper, tin, and silver from the early 1900s to the 1950s. Historic high-grade Production • Underground mines produced high-grade copper, silver, and tin ore from outcropping porphyry copper mineralization. • 2.8 million p
Slide 17: Geology and Mineralization
GEOLOGY AND MINERALIZATION 17
Slide 18: Advancing to a Resource
ADVANCING TO A RESOURCE “The project location, jurisdiction and potential processing methods are relatively favorable if quantities of copper and related elements can be defined to meet requirements for classification as Mineral Resources. At this point a copper Exploration Target has been estimated
Slide 19: 2023 NI43-101 Technical Report
2023 NI43-101 TECHNICAL REPORT • Whittle Pit: Computer Model that uses algorithm for first pass design • Evaluates the economics and determine best mining strategy for a mineral deposit (Open pit vs Underground). • Utilizes the block model, • Utilizes the value of ore deposit vs cost of mining scena
Slide 20: Block Model Parameters
BLOCK MODEL PARAMETERS • Total Drilling-104 holes • 25,005 meters in 49 RC/55 Core • Drill Holes Mineral Estimation-78 holes • 22,543 meters in 33 RC/45 Core • Grade Domains: • 0.02 to 0.05% Cu-Low Grade • 0.05 to 0.5% Cu-Mid Grade • >0.5% Cu-High Grade • Copper Price: • $3.50 to 8.90 per pound • Mi
Slide 21: Cross-Section with Select Whittle Pits
CROSS-SECTION WITH SELECT WHITTLE PITS Exploration Target-Conceptual Pits • 50 million to 100 million tonnes • 0.15% Cu to 0.30% Cu Potential Higher-grade Zones • 10 to 20 million tonnes • 0.40 % Cu to 0.80% Cu 21
Slide 22: Cross-Section from Block Model
CROSS-SECTION FROM BLOCK MODEL Cu Price Material Processed Waste Total Strip Scenario Pit $/lb k Tonnes % Cu K Lbs k Tonnes k Tonnes Ratio Ini - 3.00 Proc - 90% Rec 13 $3.50 654 0.40 5,784 2,540 3,194 3.88 Ini - 3.00 Proc - 90% Rec 43 $6.20 23,875 0.14 74,488 66,045 89,920 2.77 Ini - 3.00 Proc - 70%
Slide 23: Planned Drilling – 15 to 20 Holes
PLANNED DRILLING – 15 to 20 Holes Block Model Section 1110 With Whittle Pit Outlines Section 1110 With Existing Holes and Planned Drilling 23
Slide 24: Share Structure
SHARE STRUCTURE Issued and Outstanding 23,463,106 Warrants 20,635,747 Options 10,000 Restricted Share Units 5,000 Fully Diluted 44,113,853 Share Price Share Price (05/28/2024) $0.87 52-week High-Low $0.25 -$1.01 Market Capitalization $20,412,902 CSE: BFG | OTC: BFGFF | FWB: YW5 24
Slide 25: 25
25
Slide 26: Contact Us
CONTACT US We value our investors - Please contact us via your preferred method if you have any questions. Royal Centre, Suite 1500 1055 West Georgia Street, PO Box 11117 Vancouver, British Columbia Canada V6E 4N7 Contact: Joel Warawa, VP of Corporate Communications Phone: 1 (855) 475-0745 Email: in
Slide 27: Disclaimer and Forward-Looking Statements
DISCLAIMER AND FORWARD-LOOKING STATEMENTS This presentation (the “Presentation”) has been prepared solely for information purposes in connection with the contemplated issue of shares in Giant Mining Corp. (“Giant Mining” or the “Company”) and is being furnished by Giant Mining to a limited number of
Slide 28: Thank You
THANK YOU 28
Slide 29: Appendix Slides
Appendix Slides “Join us as we uncover the potential for value creation and market cap growth in the world of copper exploration with Majuba Hill Copper” Buster Hunsaker - Senior Geologist 29
Slide 30: Select Whittle Pit Scenarios
SELECT WHITTLE PIT SCENARIOS Cu Price Material Processed Waste Total Strip Scenario Pit $/lb k Tonnes % Cu K Lbs k Tonnes k Tonnes Ratio Ini - 3.00 Proc - 90% Rec 13 $3.50 654 0.40 5,784 2,540 3,194 3.88 Ini - 3.00 Proc - 90% Rec 43 $6.20 23,875 0.14 74,488 66,045 89,920 2.77 Ini - 3.00 Proc - 70% R
Slide 31: Work Program 2020
WORK PROGRAM 2020 In 2020, Majuba Hill Copper carried out various activities at the Majuba Hill project. Here are the key highlights: Drilling: • Five core holes and four Reverse Circulation (RC) holes were drilled, totaling 8,706 feet (2,653.6 m). • Two core holes specifically targeted the historic
Slide 32: Work Program 2021
WORK PROGRAM 2021 In 2021, Majuba Hill Copper conducted extensive drilling and geological work at the Majuba Hill Porphyry Copper Project. Here are the key highlights: Drilling: • 14,893.5 feet (4,539.5 m) were drilled in 15 Reverse Circulation (RC) holes and 2 core holes. • The 2 core holes targete
Slide 33: Work Program 2022
WORK PROGRAM 2022 In 2022, Majuba Hill Copper carried out various activities at the Majuba Hill project. Here are the key highlights: Soil Sampling: • Collected 1050 additional soil samples which significantly increased the size of the DeSoto and the Copper Gold Target zones. • The DeSoto Target was
Slide 34: Significant Drill Results
SIGNIFICANT DRILL RESULTS From To Interval From Length Copper Hole To (ft) (meters) (meters) (meters) (ft) (ft) (%) MHB-2 0.0 44.5 44.5 0 146 146.0 1.41% MHB-3 129.5 176.8 47.2 425 580 155.0 0.68% MHB-6 125.0 144.8 19.8 410 475 65.0 0.15% 228.6 243.8 15.2 750 800 50.0 0.72% inc 237.7 243.8 6.1 780 8
Slide 35: 35
35