Energy World Corporation Ltd · ASX:EWC
Energy World — Corporate Update (March 2014)
54 slides from Energy World's corporate update, Mar 3, 2014
Slide 1: Site Photo Presentation - Sengkang LNG and Philippines LNG Hub Terminal
ENERGY WORLD CORPORATION LTD. 9A Seaforth Crescent, Tel : (61 2) 9247 6888 Seaforth NSW 2092, Australia. Fax: (61 2) 9247 6100 1 March 2014 For personal use only The Listing Manager Company Announcement Platform ASX Limited Total no. of page(s): 1 + attachment Dear Sirs, SITE PHOTO PRESENTATION - SE
Slide 2: Site Photo Presentation
ENERGY WORLD CORPORATION LIMITED ENERGY WORLD CORPORATION LIMITED For personal use only Site Photo Presentation
Slide 3: Indonesian Projects
ENERGY WORLD CORPORATION LIMITED ENERGY WORLD CORPORATION LIMITED For personal use only Indonesian Projects
Slide 4: LNG Tank base for 88,000M³ and First Slipform Equipment being Erected
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Tank base for 88,000M³ and First Slipform Equipment being Erected
Slide 5: LNG Storage Tank: Bored-Piles, Pile Heads and Base Slab Completed
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Storage Tank: Construction of Bored-Piles, Pile Heads and Base Slab Completed with Assembling of Slipforming Material In Progress
Slide 6: LNG Storage Tank: Graveling at Base Slab in Progress
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Storage Tank: Graveling at Base Slab Storage Tank In Progress
Slide 7: LNG Storage Tank: Vertical Trumplates Installation in progress
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Storage Tank: Vertical Trumplates Installation in progress
Slide 8: Main Processing Plant Area – Phase I
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Plant Area – Phase I
Slide 9: 1st Cold Box Erection
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only 1st Cold Box Erection
Slide 10: 2nd Cold Box ready for Erection
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant Cold Box 1 For personal use only Cold Box 2 Cold Box 1 Cold Box 2 2nd Cold Box ready for Erection
Slide 11: Main Processing Plant Area – Phase I
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Plant Area – Phase I
Slide 12: LNG Processing Equipment being Erected
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Processing Equipment being Erected
Slide 13: Main Processing Plant Area – Pre-treatment Plant of MPA I
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Plant Area – Pre-treatment Plant of MPA I
Slide 14: Main Processing Plant Area – Pre-treatment Plant of MPA I
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Plant Area – Pre-treatment Plant of MPA I
Slide 15: Compressor
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Compressor
Slide 16: Compressor
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Compressor
Slide 17: Main Processing Area Phase IB
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Area Phase IB
Slide 18: Construction of Permanent Jetty
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Construction of Permanent Jetty
Slide 19: Permanent Jetty: Bored Pile at Loading Platform & Berthing Dolphin
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Permanent Jetty: Construction of Bored Pile at Loading Platform & Berthing Dolphin In Progress
Slide 20: Switch Yard
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Switch Yard
Slide 21: Permanent Workshop / Warehouse
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Permanent Workshop / Warehouse
Slide 22: EWC Site Visit
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only EWC Site Visit
Slide 23: Main Processing Plant Area – Phase I
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Main Processing Plant Area – Phase I
Slide 24: Compressor
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Compressor
Slide 25: Cold Box
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Cold Box
Slide 26: LNG Marine Loading Arms
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only LNG Marine Loading Arms
Slide 27: For personal use only
ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only
Slide 28: Power Station
ENERGY WORLD CORPORATION LIMITED Sengkang Power Station For personal use only
Slide 29: Gas Plant
ENERGY WORLD CORPORATION LIMITED Sengkang Gas Plant For personal use only
Slide 30: Gas Plant
ENERGY WORLD CORPORATION LIMITED Sengkang Gas Plant For personal use only
Slide 31: Gas Plant: Safety First
ENERGY WORLD CORPORATION LIMITED Sengkang Gas Plant For personal use only Safety First
Slide 32: Drilling / Testing Wasambo Gas Project
ENERGY WORLD CORPORATION LIMITED Drilling / Testing Wasambo Gas Project For personal use only
Slide 33: Meeting with President of Indonesia
ENERGY WORLD CORPORATION LIMITED Meeting with President of Indonesia For personal use only Meeting with President of Indonesia, Dr. Susilo Bambang Yudhoyono
Slide 34: Construction Progress Photos at Pagbilao LNG Hub Terminal and Power Station
ENERGY WORLD CORPORATION LIMITED ENERGY WORLD CORPORATION LIMITED For personal use only Construction Progress Photos at Pagbilao LNG Hub Terminal and Power Station
Slide 35: Foundation and Slipform Assembly for The 130,000M³ LNG Tank
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Foundation and Slipform Assembly for The 130,000M³ LNG Tank
Slide 36: Prestressing Ducts and Vertical Rebar Installation at Tank Wall
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Installed storage of prestressing ducts and couplers Installation of Vertical rebar at tank wall ongoing
Slide 37: Hydraulic Hose and Jack Installation
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Installation from copper tube to hydraulic hose until to hydraulic jack
Slide 38: Installation of Prestress Duct to Trumplate in Tank Buttress
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Installation of prestress duct to trumplate in the tank buttress
Slide 39: Rebar and Stressing Duct Guide at Tank Wall
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Fabrication and installation of rebar and stressing duct guide at tank wall ongoing
Slide 40: Slipform Engineering Workshop
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Slipform Engineering Workshop
Slide 41: Stripping of Hill for Roadway and Regasification
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Stripping of hill for the location of roadway and regasification Formation of pipeway and roadway ongoing
Slide 42: Drilling Rig Machine / Piles
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Drilling Rig machine / Piles 1.5M Ø45M Length
Slide 43: LNG Jetty Foundation
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only LNG Jetty Foundation
Slide 44: Jetty Loading Arms ready for Shipping
ENERGY WORLD CORPORATION LIMITED Pagbilao LNG Hub Terminal For personal use only Jetty Loading Arms ready for Shipping
Slide 45: Pagbilao Power Station Site: 600MW CC Power Plant
ENERGY WORLD CORPORATION LIMITED Pagbilao Power Station Site For personal use only Artist Impression 600MW CC Power Plant Site Area for the 600MW Combined Cycle Power Station showing Location of LNG Tank and Power Station Site
Slide 46: Pagbilao Power Station Site Works
ENERGY WORLD CORPORATION LIMITED Pagbilao Power Station For personal use only Lay-out of round about location going to LNG area and Power Station completed Riprapping for slope protection beside Warehouse B and Power Station
Slide 47: 200MW Gas Turbine Units ready for Shipping
ENERGY WORLD CORPORATION LIMITED Pagbilao Power Station For personal use only 200MW Gas Turbine Units ready for Shipping
Slide 48: Combined Cycle Power Plant – Equipment of Gas Turbine
ENERGY WORLD CORPORATION LIMITED Pagbilao Power Station For personal use only Combined Cycle Power Plant – Equipment of Gas Turbine
Slide 49: Australian Projects
ENERGY WORLD CORPORATION LIMITED Australian Projects For personal use only Abbot Point Eromanga Gilmore Australia
Slide 50: Gilmore LNG Facility – Placing equipment on the foundations
ENERGY WORLD CORPORATION LIMITED Australia – Gilmore LNG Facility – Placing equipment on the foundations For personal use only Cold Box
Slide 51: Fueling Station
ENERGY WORLD CORPORATION LIMITED Fueling Station For personal use only
Slide 52: Site at Abbot Point and Power Station
ENERGY WORLD CORPORATION LIMITED Site at Abbot Point and Power Station For personal use only
Slide 53: South Australia - Southern Cooper Project (PEL 96)
ENERGY WORLD CORPORATION LIMITED South Australia - Southern Cooper Project (PEL 96) PEL 96 • 33.3% For personal use only Percentage Australia Interest of EWC Operating • Strike Oil Limited Party Production • PEL obtained 13 May 2009 PEL 96 Status Future • Being determined Investment Obligation South
Slide 54: Commencement of Drilling Operations at Le Chiffre (PEL96)
ENERGY WORLD CORPORATION LIMITED Commencement of Drilling Operations at Le Chiffre 1 (PEL96) For personal use only