  1. Slide 1: Can dry tailings be economically viable?

    Packed with Performance Webinar Can dry tailings be economically viable?

  2. Slide 2: Safe Harbor Statement

    Safe Harbor Statement The information in this document is provided for guidance only and as is without warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose or non-infringement. Information in this do

  3. Slide 3: Agenda and Key information

    Agenda Key information ▪ Webinar will be recorded ▪ Use the question box for all questions you have 1. Introduction during the presentation ▪ If you require any assistance during 2. Presentation presentation, please write into the question box as well. Moderator will be monitoring throughout 3. Q&A

  4. Slide 4: Today's speaker

    Today’s speaker ▪ 28 years of industry experience ▪ Responsible for Tailings Management Solutions Rodrigo Gouveia rodrigo.gouveia@mogroup.com 4

  5. Slide 5: Tailings in numbers

    Tailings in numbers 3.6bt Tailings generation in 2018 for Iron ore and Copper 5.2bt respectively Important tailings dams 12 accidents in last 10 years Existing tailings dams ~8000 operating beyond limit Catastrophic failures 17 expected between 2020-29 if nothing is done Of the mines operated by 70%

  6. Slide 6: Mining industry is at the crossroads

    Mining industry is at the crossroads Key challenges Stricter Lower head Water scarcity Tailings dam Cost of environment grades and recovery failure tailings and & safety reclamation legislation 6

  7. Slide 7: Dry tailings will replace wet tailings in few years

    Dry tailings will replace wet tailings in few years ▪ The solution must be sustainable and socially responsible, conserve water and reduce social impact ▪ Dry-tailings addresses main concerns on water scarcity, tailing dams collapse risks and pressure from society and legislation ▪ New modern techno

  8. Slide 8: Economically viable integrated solution

    Economically viable integrated solution Island of solutions can bring the best financial balance on tailings management VPX™ filter • Highest pressure in its category • Up to 90% water recovery MHC™ Hydrocyclone • Fully electro-mechanical closing for highest safety and minimum maintenance • Future r

  9. Slide 9: Comparative cost study for dry, paste and wet tailings

    Comparative cost study for dry, paste and wet tailings Dry tailings towards being the most viable solution ▪ CAPEX and OPEX costs for tailings dewatering and tailings handling were triangulated using various sources: operations in Australia, Brazil and Canada, consultants, experts and Metso ▪ Gold,

  10. Slide 10: CAPEX comparison for different tailings routes

    CAPEX comparison for different tailings routes CAPEX (cost per solid ton of Dry Paste Wet tailing, in Eur/ton) Handling 0.4 - 0.6 2.0 - 2.4 2.4 - 2.8 Dewatering 2.6 - 3.2 1.3 - 1.7 0.4 - 0.6 Water Infra 0.2 - 0.4 1.0 - 1.2 1.5 - 1.9 Total 3.2 - 4.2 4.3 - 5.3 4.3 - 5.3 Drivers • Filtration plant (>90

  11. Slide 11: OPEX comparison for different tailings routes

    OPEX comparison for different tailings routes OPEX (cost per solid ton Dry Paste Wet of tailing, in Eur/ton) Handling 0.9 - 1.1 0.3 - 0.5 0.4 - 0.6 Dewatering 1.8 - 2.2 0.6 - 0.8 0.1 - 0.3 Water Infra Zero 0.1 - 0.3 0.3 - 0.5 Total 2.7 - 3.3 1.0 - 1.6 0.8 - 1.4 Drivers • Energy and maintenance • Tai

  12. Slide 12: Total comparison for different tailings routes

    Total comparison for different tailings routes TOTAL (cost per solid ton Dry Paste Wet of tailing, in Eur/ton) Handling 1.3 - 1.7 2.3 - 2.9 2.8 - 3.4 Dewatering 4.4 - 5.4 1.9 - 2.5 0.5 - 0.9 Water Infra 0.2 - 0.4 1.1 - 1.5 1.8 - 2.4 Total 5.9 - 7.5 5.3 - 6.9 5.1 - 6.7 ▪ Higher OPEX in some situation

  13. Slide 13: Reduced need for area to store dry tailings

    Reduced need for area to store dry tailings ▪ Reduce the TSF footprint by 50% or more ▪ Safe stacking of tailings, even in seismic zones ▪ Reduce risk of catastrophic tailings dam flows ▪ Reduce groundwater contamination through seepage 13

  14. Slide 14: Metso VPX

    Metso VPX™ Smart and future ready filtration solution ▪ Designed from grounds up to perform for any difficult-to-filter material, no matter how high the clay content is, Metso VPX™ has passed the toughest test ▪ Capable of handling higher volumes, Metso VPX™ takes a significant leap in innovation fo

  15. Slide 15: IPS (Inclined Plate Settlers)

    IPS (Inclined Plate Settlers) Maximum process recovery, minimum plant footprint 50% smaller Robust Maximized Increased plant footprint design recovery rate uptime Low environmental 20% lower Maximized Lower impact Operating costs throughput Installation costs July 13, 2020 15

  16. Slide 16: Why Worry about Water?

    Why Worry about Water? ▪ By far, the largest consumer of water is beneficiation, and in particular, flotation ▪ In a typical copper concentrator utilizing flotation: ✓ Total water requirement is 1.5 to 3.5 m3 water per ton of ore ✓ Make up water requirement is 0.6 to 1.0 m3 water per ton of ore 12.4

  17. Slide 17: Why Worry about Water?

    Why Worry about Water? ▪ Cost of supplying water is measured in dollars and sense ✓ The 2,500 L/s Escondida Water System desalination plant cost $3.4B ✓ Cost to supply water to the mine is approximately $5/m 3, including: RO Plant: 3.4 kWh/m3 Pumping: 14.0 kWh/m3 (3100m asl, 175km) TOTAL: 17.3 kWh/m

  18. Slide 18: Industry Trends towards Water Conservation

    Industry Trends towards Water Conservation Dry Stack Tailings – The Benefits Stack Up 12.4M m3 ▪ 100,000 mtpd Cu ore 6.8M m3 ▪ 2.5 m3/mt ore ▪ Semi-arid region Plant 0.4M m3 TSF TSF Pond 22M m3 34M m3 ▪ 90% solids in concentrate 88M m3 12.4M m3 13.8M m3 ▪ 50% solids in tailings ▪ Neglect rain, other

  19. Slide 19: Industry Trends towards Water Conservation

    Industry Trends towards Water Conservation Dry Stack Tailings – The Benefits Stack Up Evaporation reduces significatively Water sent to TSF eliminated ▪ 100,000 mtpd Cu ore Make-up water 0M m3 reduced ▪ 2.5 m3/mt ore 1.5M m3 0.4M m3 ▪ Semi-arid region Plant TSF TSF Pond 9M m3 88M 8.5M m3 0M m3 ▪ 90%

  20. Slide 20: TCO comparison by using trucks vs. conveyors to transport tailings

    TCO comparison by using trucks vs. conveyors to transport tailings - 10 Km distance / 2700tph ▪ Overland conveyor is the routing from the mine until the beneficiation plant (MEur) ▪ Included in the conveyor’s cost: earth All equipment, infrastructure and moving, civil works, site erection installati

  21. Slide 21: Recent cost added/increased to wet tailings operation

    Recent cost added/increased to wet tailings operation Sensitive and confidential subject in the mining industry ▪ After recent colapses in tailing dams, insurance deductible cost has increased ▪ There are an increased number of reports, controls, inspections and people connected to tailings manageme

  22. Slide 22: What's next

    What’s next Enabling socially responsible and sustainable mining ▪ Red F footprint by 50% or more ▪ Focus is on challenging the conventional for the best solution ▪ Customized solutions including different equipment, advanced process control and operational planning ▪ Close cooperation with customer

  23. Slide 23: Questions?

    Questions?

  24. Slide 24: Thank you for joining!

    Thank you for joining! ▪ Webinar recording and material will be emailed post-webinar ▪ Any unanswered questions from the chat will be replied to via email ▪ Still have a question? Please reach out to mining.webinars@metso.com and we will get back to you! ▪ Follow all our social media channels to sta

  25. Slide 25: mogroup.com

    Memo OOO0 ¢ Partner for positive change +) {y] (in) mogroup.com