Slide 1: Trace Group Hold
TRACE GROUP HOLD
Slide 2: Trace Group Hold PLC will be 12 years old in November 2008
Trace Group Hold PLC will be 12 years old in November 2008. Its science- based mission in the field of construction has given it a strength of purpose which has focused effort and resource yet allowed related activities to be developed or brought in at appropriate times. The outcome has been an enti
Slide 3: Memberships and construction capabilities
A member of The Industrial Capital Association in Bulgaria, The Bulgarian Construction Chamber, The Chamber of Commerce and Industry and a major contractor for projects under The Ministry of Defense of RB, the Holding pursues to remain at the top tier of construction ventures, harness quality and br
Slide 4: Engineering Infrastructure
ENGINEERING INFRASTRUCTURE Capital repair, reconstruction and construction are being carried out under the Programme for Rehabilitation of Transit Roads in the Republic of Bulgaria co-financed by the European Bank for Reconstruction and Development, Phare Programme, Sapard Programme, Republic's Road
Slide 5: Slide 5
Slide 6: Bridges and bridging facilities
Bridges and bridging facilities l The pursued extension in key scientific and engineering areas was given practical expression through the establishment of a subsidiary company – PSF-Mostengineering JSC – Yambol which is concentrated in the field of bridge erecting and whose complementary strengths
Slide 7: Slide 7
Slide 8: Water- and Gas-supply Systems
Water- and Gas-supply Systems The integration of novel technologies has improved the effectiveness and efficiency of the process of constricting water- and gas-supply systems whose implementation gained ground in the following directions: Facilities for the Preservation of the Environment The Holdin
Slide 9: Slide 9
Slide 10: Emergency and Recovery Activities
Emergency and Recovery Activities l As the extent and timing of a natural disaster is ever uncertain, a clearer ‘translational’ approach towards the means of addressing it is a sine qua none. We are well aware of the need to respond quickly to any such detrimental trend and are careful to manage our
Slide 11: Slide 11
Slide 12: Special Purpose Facilities
SPECIAL PURPOSE FACILITIES l Construction and Repair of Airports l Construction of firing grounds, buildings, military facilities, etc The merging of knowledge pathways and laboratory-based research enabled us to design and construct Graf Ignatievo Airport for merely three months employing novel tec
Slide 13: Slide 13
Slide 14: High Construction
HIGH CONSTRUCTION l A complementary, but never marginal, directive has recently began to gather momentum within the scope of our objectives which provided matter for the establishment of a special department to carry out the construction of modern communal, industrial and administrative buildings.
Slide 15: Slide 15
Slide 16: The Holding's mission
The Holding’s mission is distinctive amongst similar statements through its reference to the application of training and the disposition of graduates’ transferable skills effectively directing them towards a range of career paths in construction industry and commerce, thus encouraging the recruitmen
Slide 17: Our mission can be broken down into a series of intentions
Our mission can be broken down into a series of intentions: Continue to embody and deliver world-class performance in every single aspect of our work; Be vigilant in maintaining our reputation and avoid anything which might cause confusion over what our brand stands for; Develop our already extensiv
Slide 18: Central office in Sofia
CENTRAL OFFICE IN SOFIA Trace Group Hold PLC 71, James Boucher str. Sofia, Bulgaria phone: + 359 2 965 79 40; fax: + 359 2 965 79 43 e-mail: tracegroup@tracebg.com; Chief Executive Director: Tsvetan Tsonev web: www.tracebg.com