Slide 1: Damage and restoration status regarding the Tohoku-Pacific Ocean Earthquake and future prospects
Damage and restoration status regarding the Tohoku-Pacific Ocean Earthquake and future prospects March 30, 2011 Nippon Telegraph and Telephone Corporation

Slide 2: Damage condition of communication facilities
x Physical damage^ submersion depletion of battery capacity ^Submersion^ destruction by flood^ physical damage, depletion of battery capacity ^ Mobile phone base station ^ x NTT building (Relay building) x Cable disruption, damaged ducts NTT building (Exchange office building) x x x x x 1 1 2 4 x Co

Slide 3: Restoration status of communication services
Maximum: March 13, 2011 Maximum number of affected circuits Approx. 1.5 million circuits As of March 28, 2011 Number of affected circuits Approx. 112,000 circuits (Recovery rate: 93%) Maximum Maximum: March 12, 2011 Maximum number of off-the-air base station equipment 6,720 base stations As of March

Slide 4: Restoration actions taken and to be taken
*1 Number of buildings with commercial power supply disruptions and equipment failures due to the earthquake. *2 Excluding areas surrounding Fukushima Nuclear Power Plant (9 fixed-line service buildings and 68 mobile base stations). Actions taken so far: Relief efforts by mobile power-supply vehicle

Slide 5: Measures to secure communication and safety confirmation
Securing a means of communication Deployment of mobile base station vehicles (approx. 30 vehicles) Securing a means of communication Rental of free satellite mobile phones (approx. 870 handsets), mobile phones (approx. 1,440 handsets) and tablet PCs (approx. 180 terminals) Securing a means of commun

Slide 6: Tohoku - Pacific Ocean Earthquake: Current Status and Restoration Plan
Tohoku - Pacific Ocean Earthquake: Current Status and Restoration Plan NTT DOCOMO, INC. March 30, 2011

Slide 7: Damage to Base Stations & Restoration Measures
Damage to Base Stations & Restoration Measures 788 base stations requiring inspection as of March 22 Immediately inspected disrupted base stations & implemented temporary repairs Services restored at 413 base stations by March 28 Services disrupted at 307 base stations as of March 28 Base Stations R

Slide 8: Restoration Progress & Outlook
Restoration Progress & Outlook Late April May March 24 68 (Within 30 km of nuclear plant) 248 491 (Disrupted) 229 (Service restored) Microwave: 23 Satellite: 24 Optical fiber & temporary optical fiber: 183 Large zone: 18 Mountain regions: 41 Tunnels: 18 59 Evacuation centers Temporary housing Highly

Slide 9: Service Restoration Schedules (248) Base Stations Expected to be Restored (1/2)
Service Restoration Schedules (248) Base Stations Expected to be Restored (1/2) ^ Scheduled for Completion by Late April Scheduled for Completion by Late April Iwate 137 137 Iwate Mid-April Late April Iwate 89 48 Miyagi 89 89 Miyagi Mid-April Late April Miyagi 61 28 Fukushima 22 22 Fukushima Mid-Apr

Slide 10: Base Stations Expected to be Restored (2/2)
Base Stations Expected to be Restored (2/2) Service Restoration Schedules (59) Scheduled for Completion by May Scheduled for Completion by May Scheduled for Completion by May Mountain Regions Tunnels Iwate 47 37 10 Miyagi 8 1 7 Fukushima 4 3 1 Total 59 41 18 Restoration Schedule Undetermined: 68 (Wi

Slide 11: Service Restoration Measures (1/3)
Service Restoration Measures (1/3) 1. Optical fiber and temporary optical fiber Restoring transmission lines by installing optical fiber cables Prefectural node Branch ring sub-node Branch ring sub-node Branch ring sub-node :^Existing optical fiber :^Temporary optical fiber 5

Slide 12: Service Restoration Measures (2/3)
Tsunami 2. Large zone scheme Utilizing large zone scheme applied to high-elevation base stations to restore services in affected areas Service Restoration Measures (2/3) 6 Damaged by tsunami

Slide 13: Service Restoration Measures (3/3)
3. Entrance microwave system Restoring relay transmission lines and access transmission lines by utilizing entrance microwave system Service Restoration Measures (3/3) Relay station 4. Satellite circuits Restoring service by installing satellite circuits Disconnected optical cable Disconnected optic

Slide 14: Restoration Area Maps
Restoration are map uploaded on website (Japanese only) beginning March 20 ^^^Online map shows restoration status in the heavily damaged Iwate, Miyagi and Fukushima prefectures. Users can search by ^^ ^^^municipalities to confirm areas in which: DOCOMO's FOMA 3G service is available Services are sch

Slide 15: Disaster Recovery Programs
Disaster Recovery Programs Program Program Before After 1 Extension of walk-in payment deadline for charges (extension approximately one month) Payment deadline of May 2 for March bills Payment deadline of May 2 for March billsPayment deadline of May 31 for April bills 2 Mobile phone repair charges

Slide 16: Base Station Equipments and Base Stations
^ ^^Base Station Equipments and Base Stations^ Attachment 1 Currently reports are based on the number of disrupted base station equipments In the future, the number of disrupted base stations is to be updated as recovery efforts are made at each base station sites are made at each base station sites

Slide 17: Facility Damage
Facility Damage Displaced by tsunami 1. Base station facility (Matsuhima-Nobiru, Miyagi) 4. docomo Shop (Ishinomaki-Higashi, Miyagi) 2. Transmission facility (Noda-mura, Iwate) 3. Base station facility (Ishinomaki-Midori-cho, Miyagi) Attachment 2 2 Collapse by tsunami (Concrete post)

Slide 18: Service Recovery (Iwate)
Service Recovery (Iwate) 4:00 a.m. on Monday, March 28 Iwaizumi Miyako Ofunato 6:00 p.m. on Sunday, March 13 Kamaishi - Kaminakashima Attachment 3-1 3 Service disrupted Service available

Slide 19: Service Recovery (Miyagi)
Service Recovery (Miyagi) Kesennuma Ishinomaki - Oshika Peninsula Sendai - Matsushima Attachment 3-2 4 4:00 a.m. on Monday, March 28 6:00 p.m. on Sunday, March 13 Service disrupted Service available

Slide 20: Service Recovery (Fukushima)
Service Recovery (Fukushima) Attachment 3-3 5 4:00 a.m. on Monday, March 28 6:00 p.m. on Sunday, March 13 Service disrupted Service available Fukushima Daiichi Nuclear Plant Fukushima Daini Nuclear Plant Fukushima Daiichi Nuclear Plant Fukushima Daini Nuclear Plant
Source: SEC EDGAR · 6-K filed Mar 31, 2011
More decks from NTT Docomo Inc
ESG Presentation (September 2021)30 slides · Sep 30, 2021
FY2017/1-3Q Earnings Presentation30 slides · Jan 30, 2018
H1 FY2017 Earnings Presentation43 slides · Oct 26, 2017
Q1 FY2017 Earnings Presentation23 slides · Jul 27, 2017
FY2016 Earnings Presentation70 slides · Apr 27, 2017
9M FY2016 Earnings Presentation58 slides · Jan 27, 2017