Vital Metals Ltd · ASX:VML

Vital Metals — BBY Conference 2006

24 slides from Vital Metals's conference presentation, May 11, 2006

  1. Slide 1: Vital Metals Ltd May 2006

    Slide 1: Vital Metals Ltd May 2006

    Je, Vital Metals Ltd 11 May 2006 The Manager Australian Stock Exchange Limited Company Announcements Level 10 20 Bond Street SYDNEY NSW 2000 Dear Sir Presentation to BBY Conference in Sydney Please find following the Presentation to be given by Executive Chairman, W Ryan at the BBY Conference in Syd

  2. Slide 2: Vital Metals Ltd

    Slide 2: Vital Metals Ltd

    y AN Vital Metals Ltd

  3. Slide 3: Vital Metals Ltd - Structure

    Slide 3: Vital Metals Ltd - Structure

    44 Vital Metals Ltd - Structure

  4. Slide 4

    Slide 4

  5. Slide 5: $300.00 $250.00 § $200.00 | $150.00 © $100.00 |

    Slide 5: $300.00 $250.00 § $200.00 | $150.00 © $100.00 |

    $300.00 $250.00 § $200.00 | $150.00 © $100.00 |

  6. Slide 6: Chinese Tungsten

    Slide 6: Chinese Tungsten

    hinese Tun

  7. Slide 7: Project Location Map

    Slide 7: Project Location Map

    |A& Project Location Ma

  8. Slide 8: Watershed - Location Map

    Slide 8: Watershed - Location Map

    (44 Watershed — Location Map aN EPM(A)15064 WATERSHED PROJECT ~ Mount Carbine ungsten) ‘Tenement pending Historie mine Road Drainage

  9. Slide 9: Watershed Aerial

    Slide 9: Watershed Aerial

    band ersh Aeria

  10. Slide 10: Geology (rhyolite dyke, scheelite)

    Slide 10: Geology (rhyolite dyke, scheelite)

    hyoite oyke arerite Catesitieste | = : Rabon aan

  11. Slide 11: Western Zone drill section

    Slide 11: Western Zone drill section

    WESTERN | 14% Tm @0.61% 100m AGDE6 Zone 55 |

  12. Slide 12: Fluorescent scheelite

    Slide 12: Fluorescent scheelite

    Fluorescent scheelite

  13. Slide 13: Drill Core showing fluorescence

    Slide 13: Drill Core showing fluorescence

  14. Slide 14: Watershed Project - Resources

    Slide 14: Watershed Project - Resources

    rshed Project - Resources

  15. Slide 15

    Slide 15

  16. Slide 16: Watershed Project - Environmental

    Slide 16: Watershed Project - Environmental

    A Watershed Project - Environmental

  17. Slide 17: Watershed Project - Metallurgy

    Slide 17: Watershed Project - Metallurgy

  18. Slide 18: Watershed Timing

    Slide 18: Watershed Timing

    AA Watershed Timin

  19. Slide 19: Watershed - Development Program

    Slide 19: Watershed - Development Program

  20. Slide 20: Mt Mulgine - Magnetic

    Slide 20: Mt Mulgine - Magnetic

    4& Mt Mulgine — Magnetic

  21. Slide 21: Mt Mulgine - Location

    Slide 21: Mt Mulgine - Location

  22. Slide 22: Mt Mulgine Base Metal Occurrences

    Slide 22: Mt Mulgine Base Metal Occurrences

    ‘¥e Biase metal Ocurre

  23. Slide 23: Mt Mulgine Project

    Slide 23: Mt Mulgine Project

    | Maxime dinate aesoy_WC3 % 24 100 Pie we 2a ot wt “Cale-silcate Moztisey Metamoerhit Sate Diitete Coste with tree

  24. Slide 24: Vital Metals Overall Objectives

    Slide 24: Vital Metals Overall Objectives

Source: ASX announcement, May 11, 2006

More decks from Vital Metals Ltd

All 48 Vital Metals decks