Cloud Peak Energy — Investor Presentation (November 2016)
41 slides from Cloud Peak Energy's investor presentation, Nov 15, 2016
Slide 1: Cautionary Note Regarding Forward-Looking Statements
Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking statements” within the meaning of the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements are not statem
Slide 2: Cautionary Note Regarding Forward-Looking Statements
Cautionary Note Regarding Forward-Looking Statements ‘This presentation contains Yrwardootng statements” within the meaning ofthe safe harbor povisns of Seton 27A of the Secures Act of 833d Section 2 of he Secures xchange Act f| 1934 Foard looting statements ae not statements of store facts, ad ofte
Slide 3: Company and Financial Overview
One of the largest U.S. coal producers 2015 coal shipments from our three mines of 75.1 million tons 2015 proven & probable reserves of 1.1 billion tons Only pure-play PRB coal company Extensive NPRB projects and options for long-term growth opportunities Employs approximately 1,300 people Company a
Slide 4: Low-Risk Surface Operations
Low-Risk Surface Operations One of the best safety records in the industry Proportionately low, long-term operational liabilities Surface mining reduces liabilities and allows for high-quality reclamation Strong environmental compliance programs and ISO-14001 certified Highly productive, non-unioniz
Slide 5: Extensive Coal Reserves and Projects
Extensive Coal Reserves and Projects Spring Creek Mine – MT 2015 Tons Sold 17.0M tons 2015 Proven & Probable Reserves 259.1M tons Average Reserve Coal Quality 9,350 Btu/lb Mine Life (1) 15 years Cordero Rojo Mine – WY 2015 Tons Sold 22.9M tons 2015 Proven & Probable Reserves 339.2M tons Average Rese
Slide 6: Increasing Workload: A Function of Surface Mining in the PRB
Increasing Workload A Function of Surface Mining in the PRB 7 Additional overburden as coal seams dip further down geologically moving west Haul distances increase as mining pits migrate further from load-out More equipment, personnel, resources required to maintain steady production Imposes product
Slide 7: Increasing Workload: A Function of Surface Mining in the PRB
Increasing Workload Additional overburden as coal seams dip further down geologically moving west A Function of Haul distances increase as mining pits migrate further Surface Mining from load-out . " in the PRB More equipment, personnel, resources required to maintain steady production Imposes produ
Slide 8: Good Safety Record = Well-Run Operations
Good Safety Record = Well-Run Operations Source: Mine Safety and Health Administration Note: Total Incident Rate = (total number of employee incidents x 200,000) / total man-hours. 9 Top Coal Producing Companies - 2015 Incident Rates (MSHA) September 30, 2016 YTD MSHA AIFR 0.11 0.61 0.61 0.73 0.91 1
Slide 9: Finance, Market Conditions, and Regulations
Finance, Market Conditions, and Regulations 10
Slide 10: Financial Summary
Financial Summary Cash and cash equivalents $ 90 Credit Agreement capacity $400 A/R securitization 30 Available borrowing capacity (1) 430 Letters of credit issued (2) (71) Total Available Liquidity $449 Bonding Obligations (as of October 31, 2016, in millions) Surety bonds outstanding $425 Self-bon
Slide 11: Challenging Domestic Environment
Challenging Domestic Environment Current environment Hot summer led to lower stockpiles Lower natural gas injections Increasing natural gas prices Utilities encouraged/forced to not burn coal Renewable mandates Subsidies NGO anti-coal initiatives/litigation Excessive regulations Clean Power Plan, fe
Slide 12: Natural Gas Storage and Pricing
Natural Gas Storage and Pricing Storage Mild winter led to near record levels of gas in storage Storage levels are up 48 Bcf or 1% from last year Injections have slowed and now near levels from 1 year ago Pricing and Rig Count Financial pressure on oil and gas producers Rig count has stabilized at a
Slide 13: Federal Regulatory Pressures
Federal Regulatory Pressures CPP – Clean Power Plan Final rule granted two-year extension from proposed regulation, but still targets coal generation reduction Supreme Court stayed CPP in February 2016 pending resolution of legal challenges En banc oral argument held before D.C. Circuit Court in Sep
Slide 14: Responding to Market Conditions
15 Responding to Market Conditions Preliminary data from MSHA indicates year-to-date coal production in the U.S. down 24% compared to 2015 Reducing production to balance market demand Aligning workforce with forecast production Moved dragline from Cordero Rojo Mine to Antelope Mine 8400 volumes cont
Slide 15: Powder River Basin SPRB Production Decline in 2016
16 Powder River Basin SPRB Production Decline in 2016 Downward demand pressures on 8800 Btu (~60 MT) and 8400 Btu (~30 MT) mines Cordero Rojo Mine reduced from 35 MT in 2014 to <20 MT in 2016 2017 volumes are expected to be 10 to 20 million tons higher than 2016 as the inventory stockpiles are lower
Slide 16: High Quality Customer Base
High Quality Customer Base Our Deliveries to Power Plants in 2015 Coal Deliveries to Power Plants by Region Source: IHS CERA, SNL 17 PRB coal is burned in many newer plants We are focused on supplying newer plants with long depreciable life and strong emissions controls
Slide 17: Continued Forward Sales Strategy
18 Continued Forward Sales Strategy 2017 has 45 million tons committed and fixed at weighted-average price of $12.34/ton. 2018 has 22 million tons committed and fixed at weighted-average price of $12.60/ton 45 22 2 2 47 24 0 10 20 30 40 50 60 70 80 2017 2018 Committed tons with variable pricing Comm
Slide 18: International thermal coal pricing turnaround and exports
19 Recent turnaround in international thermal coal pricing has been significant Reduced Chinese domestic production has increased imports in 2016 Lack of capital could reduce supply response in Australia and Indonesia Newcastle spot prices have recently exceeded $100 per tonne as demand increases ag
Slide 19: Exports – 2015 Amendments to Logistics Agreements
20 Exports – 2015 Amendments to Logistics Agreements Export shipments reduce the take-or-pay obligations on a ton for ton basis. 2016-2018 Transportation Obligations as of December 31, 2014 (1)(3) 2016-2018 Amended Transportation Obligations as of December 31, 2015 (2)(3)(4) Mtpa Annual Obligation M
Slide 20: Spring Creek Complex Quality Advantage and Export Distance
21 Spring Creek Complex Quality Advantage and Export Distance 4770-4850 4544 Average Source: SNL, Wood Mackenzie, Company estimates Higher Quality Product Location Spring Creek Complex is closer to export West Coast terminals than SPRB mines Fewer bottlenecks in NPRB Quality Spring Creek Mine is a p
Slide 21: Spring Creek Complex Potential Development Options
22 Spring Creek Complex Potential Development Options (1) Non-reserve coal deposits are not reserves under SEC Industry Guide 7. Estimates of non-reserve coal deposits are subject to further exploration and development, are more speculative, and may not be converted to future reserves of the company
Slide 22: Key Projects – Non-Federal Coal
23 Key Projects – Non-Federal Coal Youngs Creek Project 287 million tons of non-reserve coal deposits at December 31, 2015(1) Contracted royalty payments of 8% vs. 12.5% federal rate 38,800 owned acres of surface land connecting Youngs Creek, Spring Creek, and Big Metal deposits Big Metal Project Ex
Slide 23: Cloud Peak Energy Terminal Position
24 Cloud Peak Energy Terminal Position Westshore Terminal – Existing lowest cost, cape-size port Capesize vessels – deep-water port Amended agreement in 2015 to eliminate volume obligations and reduce take-or-pay commitments from 2016-2018 As seaborne thermal coal prices have recently rebounded, we
Slide 24: Cloud Peak Energy Terminal Position
Cloud Peak Energy Terminal Position Westshore Terminal — Existing lowest cost, cape-size port = Capesize vessels ~ deep-water port = Amended agreement in 2015 to eliminate volume obligations and reduce take-or-pay commitments from 2016-2018 = Asseaborne thermal coal prices have recently rebounded, w
Slide 25: 2016 Guidance
26 2016 Guidance (as of October 27, 2016) Coal shipments for our three mines (1) 57 – 60 million tons Committed sales with fixed prices (2) Approximately 61 million tons Anticipated realized price of produced coal with fixed prices Approximately $12.41 per ton Adjusted EBITDA (3) $90 – $100 million
Slide 26: 2016 Guidance
2016 Guidance {as of October 27, 2016) Coal shipments for our three mines () 57-60 n tons Committed sales with fixed prices ) Approximately 61 million tons Anticipated realized price of produced coal with fixed prices Approximately $12.41 per ton Adjusted EBITDA ®) $90 - $100 million Net interest ex
Slide 27: Average Cost of Produced Coal
Note: Represents average cost of product sold for produced coal for our three mines. $10.23/ton $9.57/ton 2012 2013 2011 $9.12/ton 2014 $10.19/ton Royalties and taxes Labor Repairs, maintenance, and tires Fuel and lubricants Explosives Outside services Other mining costs 2015 $9.81/ton Average Cost
Slide 28: Major Mine Equipment - 2015
29 Major Mine Equipment - 2015 (1) Dragline has been moved from Cordero Rojo Mine to Antelope Mine Antelope Mine 2 draglines (1) 8 shovels 24 830E haul trucks 15 930E haul trucks 18 dozers 3 excavators 5 drills Cordero Rojo Mine 2 draglines 6 shovels 32 830E haul trucks 15 dozers 2 excavators 4 dril
Slide 29: Owned and Operated Mines
30 Owned and Operated Mines Our Owned and Operated Mines segment comprises the results of mine site sales from our three mines primarily to our domestic utility customers and also to our Logistics and Related Activities segment. (in millions, except per ton amounts) Q3 2016 Q3 2015 First Nine Months
Slide 30: Logistics and Related Activities
31 Logistics and Related Activities Our Logistics and Related Activities segment comprises the results of our logistics and transportation services to our domestic and international customers. (1) Non-GAAP measure. Reconciliation tables for Adjusted EBITDA are included in the Appendix (in millions)
Slide 31: Statement of Operations Data (Quarterly)
Three Months Ended September 30, Nine Months Ended September 30, 2016 2015 2016 2015 Revenue $217.1 $ 301.7 $572.5 $ 863.4 Operating income $ 10.9 17.5 $ 31.1 (25.4) Net income (loss) (1) $ (1.6) 8.9 $ (2.7) (48.7) Earnings per common share Basic $(0.03) $ 0. 15 $(0.04) $ (0.80) Diluted $(0.03) $ 0.
Slide 32: Statement of Operations Data (Annual)
Revenue $1,124.1 $1,324.0 $ 1,396.1 $ 1,516.8 $ 1,553.7 Operating income (81.4) 131.8 112.4 241.9 250.5 Net income (loss) (1) (204.9) 79.0 52.0 173.7 189.8 Earnings per common share Basic $ (3.36) $ 1.30 $ 0.86 $ 2.89 $ 3.16 Diluted $ (3.36) $ 1.29 $ 0.85 $ 2.85 $ 3.13 Year Ended December 31, 2015 2
Slide 33: Balance Sheet Data
Cash, cash equivalents and investments $ 90.3 $ 89.3 $ 168.7 $ 312.3 $ 278.0 $479.4 Restricted cash 8.5 8.5 2.0 — 4.5 71.2 Property, plant and equipment, net 1,439.5 1,488.4 1,589.1 1,654.0 1,678.3 1,350.1 Total assets 1,726.9 1,802.2 2,151.2 2,342.4 2,333.3 2,297.8 Senior notes, net of unamortized
Slide 34: Reconciliation of Non-GAAP Measures: Adjusted EBITDA
Three Months Ended September 30, Nine Months Ended September 30, Trailing Twelve Months Ended September 30, 2016 2016 2015 2016 2015 Reconciliation of Non-GAAP Measures Adjusted EBITDA 35 Net income (loss) $ (1.6) $ 8.9 $ (2.7) $ (48.7) $ (158.9) Interest income — — (0.1) (0.1) (0.1) Interest expens
Slide 35: Reconciliation of Non-GAAP Measures: Adjusted EBITDA (Annual)
Year Ended December 31, 2015 2014 2013 2012 2011 Net income $ (204.9) $ 79.0 $ 52.0 $ 173.7 $ 189.8 Interest income (0.2) (0.3) (0.4) (1.1) (0.6) Interest expense 47.6 77.2 41.7 36.3 33.9 Income tax (benefit) expense 77.4 34.9 11.6 62.6 11.4 Depreciation and depletion 66.1 112.0 100.5 94.6 87.1 Amor
Slide 36: Reconciliation of Non-GAAP Measures: Adjusted EPS
Excludes per share impact of premiums paid at option contract inception of $0.10 during the nine months ended September 30, 2015 for original settlement dates in subsequent periods. Three Months Ended Nine Months Ended September 30, September 30, 2016 2015 2016 2015 Reconciliation of Non-GAAP Measur
Slide 37: Reconciliation of Non-GAAP Measures: Adjusted EPS (Annual)
Diluted earnings per common share $ (3.36) $ 1.29 $ 0.85 $ 2.85 $ 3.13 Tax agreement (benefit) expense — (0.96) 0.17 (0.48) 0.33 Tax valuation allowance 1.83 (0.13) (0.10) (0.28) (0.84) Derivative financial instruments: Exclusion of fair value mark-to-market gains 0.50 (0.13) (0.42) (0.37) (0.04) In
Slide 38: Adjusted EBITDA by Segment
Three Months Ended Nine Months Ended September 30, September 30, 2016 2015 2016 2015 Adjusted EBITDA by Segment 39 Excludes premiums at option contract inception of $5.8, related to our Logistics and Related Activities segment, during the nine months ended September 30, 2015, for settlement dates in
Slide 39: Other Data
Former non-operating interest divested by Cloud Peak Energy in September 2014. Represents only the three company-operated mines. Q3 Q2 Q1 Q4 Q3 Year Year Year Year Year 2016 2016 2016 2015 2015 2015 2014 2013 2012 2011 Tons sold Antelope Mine 8,612 6,273 6,852 9,467 9,038 35,167 33,647 31,354 34,316
Slide 40: Sulfur Content by Basin
41 41 Sulfur Content by Basin Source: SNL U.S. Coal Consumption by Region Region/ Avg Btu Average lbs SO2 PRB/ 8,600 0.5 – 1.0/MMBtu Rocky Mountain 11,500 0.9 – 1.4/MMBtu Illinois Basin 11,500 2.5 – 6.0/MMBtu Appalachia 12,000 1.2 – 7.0/MMBtu Lignite 6,000 1.4 – 4.0/MMBtu Cloud Peak Energy Mines Ant
Slide 41: Sulfur Content by Basin
Sulfur Content by Basin Region/ a Average Ibs SO; PRB/ 8,600 0.5 - 1.0/MMBtu Rocky Mountain | 0.9-1.4/MMBtu 11,500 Mlinois Basin sale 2.5 -6.0/MMBtu ‘Appalachia a oes 1.2-7.0/MMBtu Lignite A 1.4-40/MMBtu Cloud Peak Energy Mines Antelope an 0.50/MMBtu Cordero Rojo ann 0.69/MMBtu Spring Creek cers 0.7
Cloud Peak Energy — Investor Presentation (November 2016) on 6ix