Aurania Resources Ltd. · TSXV:ARU
Aurania Resources — Shareholder Meeting (June 2021)
19 slides from Aurania Resources's shareholder meeting presentation, Jun 21, 2021
Slide 1: Annual and Special Meeting of Shareholders – June 2021
Annual and Special Meeting of Shareholders – June 2021 June 21, 2021
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward-looking information that involves substantial known and unknown risks and uncertainties, most of which are beyond the control of Aurania. Forward-looking statements include estimates and statements that describe Aurania’s future plans, ob
Slide 3: 2020-2021 – Snapshot of the Past 12 Months
2020-2021 – Snapshot of the Past 12 Months 2020-2021 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun COVID Infections 15/44 employees infected in Ecuador 4/44 Concession “Initial Exploration” extended Ec fees paid Peru fees paid compliance Community access 33/55 36/55 38/55 41/55 agreements signed M
Slide 4: Exploration Status: Gold
Exploration Status: Gold Lost Cities LiDAR Profiles: • Multiple engineered roads identified in LiDAR – field-checked • Extensive historic infrastructure emerging • Spanish? • Collapsed excavation on silver vein at Tiria-Shimpia – thought to be Spanish working TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 4
Slide 5: Exploration Status: Gold
Exploration Status: Gold Epithermal Gold 1. Kuri-Yawi: LiDAR MobileMT Drilled two holes – results pending 2. Latorre C: Sinter Gold in soil beneath sinter Covered by MobileMT & LiDAR 3. Kuripan: Gold in streams & soil Epithermal alteration Epithermal veinlets Volatile pathfinder
Slide 6: Exploration Status: Copper
Exploration Status: Copper Copper 1. Sediment-hosted copper-silver: Tsenken N1 Drilled 3 holes (1,564m) 4th underway Drilling expected to continue towards Tiria-Shimpia 2. Porphyry: Awacha Kuri-Yawi Tatasham 3. IOCG: Tsenken N2/N3 Drilled 6 holes (1,891m) Vector towards Tsenken N
Slide 7: Exploration Status: Silver-Zinc
Exploration Status: Silver-Zinc Silver- Zinc 1. 22km long & open along trend 2. 3 high-grade zones identified to date 3. Multiple metal-bearing layers 4. Gallium & Indium sweeteners in some areas? 5. 1st drill hole scheduled to start by month- end TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 7
Slide 8: Scout Drilling Schedule – Subject to Reprioritizing!
Scout Drilling Schedule – Subject to Reprioritizing! Ecuador Drill Rig 1: Planned drill sequence: Tsenken N2 Copper-silver CTsenken N3 opper-silver Tsenken N1 Copper-Silver Tsenken West/B Kuri-Yawi 2 645m in 1,246m in Underway Copper-silver Gold-copper 3 holes 4 holes Hole 1:722m Hole 2:433m Hole
Slide 9: Summary of Drilling to Date
Summary of Drilling to Date Target Type Date drilled # Metreage holes Crunchy Hill Mar-May 2019 10 3,605 Epithermal gold- Oct 2019 – Feb 2020 7 3,010 Kuri-Yawi silver Drilled to date Mar 2021 – Jun 2021 2 1,948 Tsenken Porphyry copper Sept 2020 – Dec 2020 6 1,891 N2/N3 Sed-hosted Tsenken N1 Feb 2021
Slide 10: Management
Management Aurania Resources Ltd. Tony Wood, B.Sc. Tony is based in Vancouver, Canada. He is a qualified Chartered Accountant in Canada and the CFO UK. His executive experience includes oversight of finance and operations, strategic planning and organizational development of various publicly-trade
Slide 11: Environment & Water
Environment & Water • Working with communities to provide clean water • Work with communities to install waste management systems to reduce pollution • Environmental work to ISO14001 standards • Continue to develop a close working relationship with Ministry of Environment & Water • Maiden ESG report
Slide 12: What to Expect in 2021-2022
What to Expect in 2021-2022 Drilling discovery potential Ranking Target Commodity Ranked in order of 1 Tiria-Shimpia Silver-zinc 2 Tsenken N1/B Sediment-hosted copper-silver 3 Kuri-Yawi “B1” 4 Latorre C Epithermal gold-silver 5 Kuripan Exploration: Complete reconnaissance exploration M&A: Initial jo
Slide 13: Sediment-hosted Copper-Silver
Sediment-hosted Copper-Silver Aurania applied for exploration concessions covering 384,000 hectares in adjacent Peru. To date 70/415 concessions have been granted. 208,000 hectares Status of Vicus claims: Exploration work in Peru will pending focus on data that is free from the government e.g. seism
Slide 14: Composition of the 2021-2026 Peruvian Congress
Composition of the 2021-2026 Peruvian Congress 2021-2026 Peruvian Congress Left-wing Right-wing 208,000 hectares Status of Vicus claims: pending Centre- Centre-right left- TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 14
Slide 15: Additional Slides for Reference
Q&A Additional Slides for Reference TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 15
Slide 16: Kuri-Yawi Target Concept
Kuri-Yawi Target Concept Vertical MobileMT geophysical profiles of epithermal and porphyry targets West a. Profile 1 East Epithermal 1,000m 500m Altitude in metres above sea level gold target 500m 300m elevation 0m Porphyry copper b. Profile 2 700m target 1,000m 500m 300m elevation 0m TSXV:ARU OTCQB
Slide 17: Kuri-Yawi: Section of holes 1/2
Kuri-Yawi: Section of holes 1/2 – 8 - 9 West East YW-002 Lava TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 17
Slide 18: Tsenken and Tiria-Shimpia: part of the same mineralized system?
Tsenken and Tiria-Shimpia: part of the same mineralized system? Vertical profile through part of Tiria-Shimpia 1km Vertical profile through part of Tsenken N1 Tsenken Increasing copper TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 18
Slide 19: Exploration Model for Tsenken N1 – Tiria-Shimpia
Exploration Model for Tsenken N1 – Tiria-Shimpia Metal zoning in the Kupferschiefer (Borg et al., 2012) Tiria-Shimpia Tsenken Drill holes TSN1 - 1-4 b. Tsenken N4 Tsenken N3 Tsenken N2 Tsenken 1-10km TSN1-4 TSN1-3 TSN1-1/2 TSXV:ARU OTCQB:AUIAF FRANKFURT:20Q 19