Thor Energy Plc · LSE:THR

Thor Energy — SAEMC (December 2023)

19 slides from Thor Energy's conference presentation, Dec 1, 2023

  1. Slide 1: SAEMC Presentation – Alford East: accelerating exploration with Fleet Space Technologies

    For personal use only SAEMC Presentation Alford East: accelerating exploration with Fleet Space Technologies 1 December 2023 Nicole Galloway Warland Managing Director

  2. Slide 2: Disclaimer, legal notice and competent person statement

    OVERVIEW PROJECTS NEXT STEPS Disclaimer, legal notice and competent person statement For personal use only This document and all other information (whether in writing or otherwise) which may be made available is: 1. Supplied solely for the intended recipient and may not be copied, reproduced, furthe

  3. Slide 3: Focused on Uranium and Energy Metals – Transitioning to Green Economy

    OVERVIEW PROJECTS NEXT STEPS Focused on Uranium and Energy Metals – Transitioning to Green Economy For personal use only Energy Metals - Copper REE Projects: ▪ Alford East ▪ Alford West- EnviroCopper Limited (ECL) – Thor 30% Equity Interest ▪ Kapunda – OZ Minerals (now BHP) investing A$2.5M into ECL

  4. Slide 4: In Situ Recovery (ISR)

    OVERVIEW PROJECTS NEXT STEPS In Situ Recovery (ISR) For personal use only ▪ ESG – Favourable alternative to traditional mining Colorado Prospects ▪ Low-cost / low environmental impact metal production ▪ Hydrometallurgical process rather than a high-cost mining operation (no large pit / no crushing o

  5. Slide 5: Environment Social Governance (ESG) – Social License to Operate

    OVERVIEW PROJECTS NEXT STEPS Environment Social Governance (ESG) – Social License to Operate For personal use only Committed to building enduring relationships, built on mutual respect, active partnerships and long-term commitment Community Networking Events Strong positive landholder engagement Env

  6. Slide 6: Alford Copper Belt

    OVERVIEW PROJECTS NEXT STEPS Alford Copper Belt For personal use only Source: http://saemc.com.au/archive/2017/17drown.pdf ▪ Alford Copper belt is a semi-coherent zone of oxide copper- gold mineralization within structurally controlled troughs of highly kaolinised, oxidised metasomatite, adjacent to

  7. Slide 7: Broad copper and high grade REE results

    OVERVIEW PROJECTS NEXT STEPS Broad copper and high grade REE results (TREO 500ppm Cut-off) For personal use only Hole ID From (m) To (m) Interval TREO % TREO ppm MREO ppm Colorado HREO ppm % HREO to TREO Prospects Cu % 21AEDD005 6.3 43 36.7 0.16 1577 399 662 42 1.20 including 17.8 23.8 6 0.31 3077 7

  8. Slide 8: Accelerating Exploration

    OVERVIEW PROJECTS NEXT STEPS For personal use only Accelerating Exploration 07

  9. Slide 9: Fleet Space Technologies Collaboration

    OVERVIEW PROJECTS NEXT STEPS Fleet Space Technologies Collaboration For personal use only ▪ Fleet and Thor form collaborative partnership Deeply weathered “trough” structure that (AIM/ASX: 4 September 2023) hosts oxide copper- ▪ ANT surveys gold & REE ▪ 3D Modeling with AI and ML combining all data

  10. Slide 10: Ambient Noise Tomography (ANT)

    Ambient Noise Tomography (ANT) For personal use only Advanced ambient seismic array technology Ambient Noise – waves, weather, man-made activities Image under cover up to 2.5km Satellite-enabled real-time data Near-Zero ESG Impact 9

  11. Slide 11: Ambient Noise Tomography to New geological 3D Model

    OVERVIEW PROJECTS NEXT STEPS Ambient Noise Tomography to New geological 3D Model For personal use only 6 Integrated 3D Model Combining Thor’s 3D geological Model “Our objective is to partner with you to increase your geologic understanding.” 10

  12. Slide 12: Surveys - Rapid deployment of geodes, global satellite coverage, minimal impact

    OVERVIEW PROJECTS NEXT STEPS Surveys - Rapid deployment of geodes, global satellite coverage, minimal impact For personal use only Survey 1 Survey 2 Survey Details ▪ 2 surveys each comprising 96 Geodes ▪ Geodes deployed for 1-2 weeks sending real time data to satellite ▪ Survey 1: 120m spacing, 500m

  13. Slide 13: Processing and Preliminary 3D Model

    OVERVIEW PROJECTS NEXT STEPS Processing and Preliminary 3D Model For personal use only Vibrations travelling in northeast direction 12

  14. Slide 14: Next Step-Integrating Thor's 3D geological model with ANT 3D model

    OVERVIEW PROJECTS NEXT STEPS Next Step-Integrating Thor’s 3D geological model with ANT 3D model For personal use only ▪ Drilling data (new and historical ) ▪ Regolith & Lithology ▪ Mineralisation ▪ Structural data ▪ Geophysics – gravity & magnetics In Progress 13

  15. Slide 15: 1% Copper correlation with low velocity 'trough'

    OVERVIEW PROJECTS NEXT STEPS 1% Copper correlation with low velocity ‘trough’ For personal use only Plan View – 107.5mRL 14

  16. Slide 16: Integration of data

    OVERVIEW PROJECTS NEXT STEPS Integration of data For personal use only A A’ A A’ Plan View – 107.5mRL Cross Section – 6257397mN 15

  17. Slide 17: Future Growth

    OVERVIEW PROJECTS NEXT STEPS For personal use only Future Growth

  18. Slide 18: Next Steps in the ISR assessment

    OVERVIEW PROJECTS NEXT STEPS Next Steps in the ISR assessment For personal use only Hydrometallurgy Alford East ▪ Drill testing newly Identified targets in 3D model ▪ Further pump testing ▪ Hydrometallurgical studies (column test work for copper recovery) Alford West (ECL) ▪ Passive Seismic geophysi

  19. Slide 19: Thank You

    For personal use only Thank You Nicole Galloway Warland nicole@energyplc.com Australian Office AIM/ASX: THR OTCQB: THORF

Thor Energy — SAEMC (December 2023) on 6ix