Dragon Mining Limited · HKEX:1712

Dragon Mining — RIU Melbourne Resources Round-up 2011

28 slides from Dragon Mining's conference presentation, Sep 29, 2011

  1. Slide 1: Dragon Mining Limited: An Established Nordic Gold Producer with an Exciting Future

    DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011

  2. Slide 2: Disclaimer

    Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company s own information and estimates. Company's estimates This presentation does not cons

  3. Slide 3: Notations

    Notations The information in this presentation that relates to exploration targets refers to targets that are conceptual in nature, where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Reso

  4. Slide 4: Established Nordic Gold Producer

    Established Nordic Gold Producer Svartliden Gold Mine  35,000 ounces Vammala Production Centre  30,000 ounces Game Changer  Kuusamo Gold Project St o g Financial Strong a c a Position os t o (30 Ju June e 2011) 0 )  $25.3m of liquid assets  2.3m Chalice shares (CHN) Production, Cashflow, Growth

  5. Slide 5: Corporate Overview

    Corporate p Overview p Issued Capital Share Price Performance High: 1.70 Ordinary Shares 75.2m 1.60 Options ($1.40 – $2.10) 2.6m 1.50 1.40 Market Capitalisation A$95m 1.30 1.20 Board of Directors 1.10 Peter P t Cordin C di E Executive ti Ch Chairman i Low: 1.06 Aug Sept 1.00 500k 300k Michael Naylor

  6. Slide 6: Outstanding Highlights

    Outstanding g Highlights g g  Two established and profitable production centres  1.1 million ounces of Resources  Outstanding game changing exploration project  Strong cash balance to aggressively grow assets  Moving to 150,000 150 000 ounce gold producer  Production, Cashflow, Growth – Exciti

  7. Slide 7: Scandinavia

    Scandinavia  Low sovereign risk  Long history of mining  World class geological region  No mining royalties  Low corporate tax rate Sweden - 26.3% Finland - 26.0%  Major mining, mining smelting and mining eq equipment ipment ind industry str

  8. Slide 8: Svartliden Gold Mine

    Svartliden Gold Mine Location

  9. Slide 9: Svartliden Gold Mine

    Svartliden Gold Mine Statistics to 30 June 2011 YTD Jun 2011 To Date Ore Processed 168,266 t 1,992,131 t Average Head Grade 2.5 g/t 4.5 g/t Average Recovery 87.3 % 90.4 % Gold Produced 11,578 oz 262,614 oz  Produce 30,000 ounces in 2011  Average cash cost US$850/oz

  10. Slide 10: Svartliden Gold Mine: Open Pit and Underground

    Svartliden Gold Mine Open Pit and Underground

  11. Slide 11: Southern Finland

    e Kuopio Orivesi Helsinki 60°N 4 SVARTLIDEN Stockholm 9 HANHIMAA KUUSAMO

  12. Slide 12: Vammala Production Centre

    Vammala Production Centre Statistics to 30 June 2011 YTD Jun 2011 To Date Ore Processed 103,441 t 780,737 t Average Head Grade 4.6 g/t 5.5 g/t Average Recovery 83.4 % 83.5 % Gold Produced 12,752 oz 115,684 oz  Produce 28,000 ounces in 2011  Average cash cost US$875/oz

  13. Slide 13: Orivesi Gold Mine

    Orivesi Gold Mine Extended Mine Life

  14. Slide 14: Jokisivu Gold Mine

    Jokisivu Gold Mine Extended Mine Life

  15. Slide 15: Kuusamo Gold Project

    Kuusamo Gold Project j Game Changer  High grade open pit resource  2,189,000 tonnes @ 5.4 g/t gold (383,500 ounces)  Potential for million ounce gold camp*.  Aggressive exploration strategy focussed on K samo North. Kuusamo North  3 rigs active with plans to drill up to 100,000 metres to confir

  16. Slide 16: Kuusamo North

    Kuusamo North Emerging Gold Camp

  17. Slide 17: Kuusamo North: Juomasuo Deposit

    Kuusamo North Juomasuo Deposit  1,400,000 tonnes @ 5.7 g/t gold (259,300 ounces)  Multiple, Multiple sub-parallel, sub parallel steeply dipping lodes.  298 historic drill holes for 17,191m.  Bonanza historic intercepts: • 57.30m @ 62.56 g g/t g gold • 3.70m @ 426.98 g/t gold • 21.30m @ 58.79 g/t

  18. Slide 18: Kuusamo North: Juomasuo Deposit

    Kuusamo North Juomasuo Deposit  50 drill holes for 12,815m 12 815m completed. completed  New highlight intercepts: • 14.55m @ 4.81 g/t gold A A • 11.85m @ 5.30 g/t gold • 5.30m @ 12.97 g/t gold • 7 30m @ 8.18 7.30m 8 18 g/t gold • 34.90m @ 9.30 g/t gold • 25.60m @ 9.66 g/t gold • 31.90m @ 45.67 g/

  19. Slide 19: Kuusamo North: Juomasuo Deposit

    Kuusamo North Juomasuo Deposit

  20. Slide 20: Kuusamo North: Hangaslampi Deposit

    Kuusamo North Hangaslampi Deposit  280,000 280 000 tonnes t @ 6.2 6 2 g/t /t gold ld (55,700 ounces).  Set of moderatelyy dipping pp g lodes striking N-S.  60 historical drill holes for 8,346m.  Exceptional historical intercepts: • 23.50m @ 13.25 g/t gold • 26.95m @ 5.78 g/t gold • 19.20m @ 7.00

  21. Slide 21: Kuusamo North: Hangaslampi Deposit

    Kuusamo North Hangaslampi Deposit  25 holes h l for f 2,542m 2 542 completed. l t d  New highlight intercepts: • 9.00m @ 30.17 g/t gold • 12.45m @ 7.15 g/t gold • 6.00m @ 7.51 g/t gold B B  Open along strike and with depth. Target – 150,000 to 300,000 ounces* * Refer to Slide – Notations (3)

  22. Slide 22: Kuusamo North: Hangaslampi Deposit

    Kuusamo North Hangaslampi Deposit

  23. Slide 23: Kuusamo North: Stand Out Target Areas

    Kuusamo North Stand Out Target Areas

  24. Slide 24: Kuusamo Gold Project: Project Development

    Kuusamo Gold Project j Project Development Metallurgy and Flow Sheet Development  Trial mining and processing of Juomasuo ore in 1990’s 1990 s.  Test work program in development. Environmental Impact Assessment  Established good local community and municipal dialogue with open briefings.  Progra

  25. Slide 25: Kuusamo Gold Project: Regional Potential

    Kuusamo Gold Project j Regional Potential  200km² holding.  Highly prospective.  Excellent targets. 2.0m @ 16.00 g/t Au  Gold deposits Meurastuksenaho (42 400 ounces @ 3.6 (42,400 3 6 g/t /t gold) ld) 9.0m @ 10.35 g/t Au and Sivakkaharju (11,300 ounces @ 7.5 g/t gold). Up to 29.5 g/t Au  Gold d

  26. Slide 26: Production Project Pipeline

    Production Project j Pipeline p Moving to a 150,000 Ounce Gold Producer! 2011 2012 2013 2014 Svartliden 30 000 30,000 35 000 35,000 35 000 35,000 35 000 35,000 Vammala 28,000 40,000 55,000 55,000 Kuusamo 60,000 TOTAL 58,000 75,000 90,000 150,000 TOTAL 70,000 75,000 115,000 140,000 Reserves (oz) Reso

  27. Slide 27: Investment Opportunity

    Investment Opportunity pp y  Two T o established and profitable production prod ction centres  1.1 million ounces of Resources  Outstanding game changing exploration project  Strong cash balance to aggressively grow assets  Moving to 150,000 ounce gold producer  Production, Cashflow, Growth –

  28. Slide 28: Appendices: Gold Resource Inventory

    Appendices Gold Resource Inventory Gold G ld Classification Tonnes Ounces (g/t) Svartliden Gold Mine, Sweden (31 July 2011) Measured 197,900 3.8 24,300 Indicated 1,034,600 , , 3.7 125,400 , Inferred 62,600 3.7 7,400 Total 1,295,100 3.8 157,100 Vammala Production Centre, Finland (31 December 2010) Me

Dragon Mining — RIU Melbourne Resources Round-up 2011 on 6ix