Ivanhoe Mines Ltd. Class A · TSX:IVN

Ivanhoe Mines Ltd. Class A — Investor Presentation (November 2022)

25 slides from Ivanhoe Mines Ltd. Class A's investor presentation, November 2022

  1. Slide 1: Investor Presentation November 2022

    TSX: IVN | OTCQX: IVPAF INVESTOR PRESENTATION November 2022

  2. Slide 2: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS The information contained in this presentation and other information furnished by or on behalf of Ivanhoe Mines Ltd. (“Ivanhoe”) is confidential and has been prepared to assist the recipients hereof in conducting their own evaluation of Ivanhoe and does not

  3. Slide 3: Ivanhoe at a Glance

    IVANHOE AT A GLANCE CORPORATE INFORMATION TSX: IVN LISTINGS OTCQX: IVPAF SHARE PRICE C$10.98 / share(1) MARKET CAP US$10.1 billion(1) SHARES, OPTIONS, Common Shares: 1,214.0 million(2) RSUs & DSUs Options, RSUs & DSUs: 24.7 million(2) CASH POSITION US$663 million(3) CITIC Metal 26.0% Zijin Mining 13

  4. Slide 4: A Leading Producer, Developer and Explorer in Africa

    A LEADING PRODUCER, DEVELOPER AND EXPLORER IN AFRICA World’s fastest growing major copper mine with the highest grades Ps World’s highest-grade zinc project OWNERSHIP: : OWNERSHIP: Ivanhoe Mines (39.6%) |_KAMOA-KAKULA o | Ivanhoe Mines (62%) Zijin Mining Group (39.6%) | We =) | Gécamines (38%) Gover

  5. Slide 5: The World's Next Diversified Major Miner

    THE WORLD’S NEXT DIVERSIFIED MAJOR MINER Ivanhoe will be a responsible, leading supplier of critical metals for the clean-energy transition, including copper, nickel, zinc and PGMs. IN PRODUCTION CONSTRUCTION DEVELOPMENT EXPLORATION KAMOA-KAKULA PLATREEF KIPUSHI WESTERN FORELAND The world’s fastest

  6. Slide 6: DRC: Awakening a Copper Giant

    DEMOCRATIC REPUBLIC OF THE CONGO DRC: AWAKENING A COPPER GIANT On track to become the 3rd largest global copper producer Change in status for 2015 copper projects by country, % in 2020 100% Abundant hydro-power capacity 80% Median population age of 17 New government since 2019 – first 60% peaceful t

  7. Slide 7: ESG Performance at a Glance

    ESG PERFORMANCE AT A GLANCE Approx. 900 community Bulk earthworks now Over 100 members of An additional farmers producing high- are underway for the local small-medium 50 boreholes of quality food under the Kamoa Centre of enterprises have potable water to be attended Ivanplats’ Kamoa Sustainable Ex

  8. Slide 8: Q3 2022: Kamoa-Kakula Approaches 400 ktpa Copper

    Q3 2022: KAMOA-KAKULA APPROACHES 400 KTPA COPPER 97.8kt copper production Phase 2 commercial production in April 2022; combined copper production from Phase 1 and 2 to reach ~450kt by Q2 2023 following de-bottlenecking program 93.8kt payable copper sales Lower end of FY 2022 production guidance incr

  9. Slide 9: Kamoa-Kakula: Quarterly Performance

    KAMOA-KAKULA: QUARTERLY PERFORMANCE (Figures shown on 100% basis for Kamoa-Kakula) Significant increase in payable copper sold to 93.8kt driven by Copper Sold (kt) the ramp up of the Phase 2 concentrator C1 cash costs stable in Q3 with ongoing elevated logistics charges 85.8 93.8 Negative adjustment

  10. Slide 10: Kamoa-Kakula C1 Cash Cost

    KAMOA-KAKULA C1 CASH COST (All values in US$ per pound of payable copper) Higher logistics charges and other inflationary pressures continued in the Breakdown of C1 Cash Cost (US$ per lb.) third quarter Q1 2022 Q2 2022 Q3 2022 2022 full-year C1 cash cost guidance 0.56 range tightened to $1.35/lb. to

  11. Slide 11: $4.51/lb. $4.34/Ib.

    $4.51/lb. $4.34/Ib. e e $3.50/Ib. ' H H i H i H i H i H H H H H i H H — H i i - H i i H a T =H i H YTD 2022 YTD 2022 f \. t Qi 2022 Q2 2022 Q3 2022 YTD 2022 E Q1 2022 Q2 2022 Q3 2022 od i + VS Qe et 4 EBITDA/ EBITDA Margin (US$ million / %) P| Capital Expenditure (US$ million) < ACA ails OS NN a w z

  12. Slide 12: = Se i

    = Se i # ca faa i - Record quarterly Efoduction of 97.8kt of ede * . === Ore tonnes milled (000’s ahced Se Coppel ore grade processed (%) copper in Q3 2022, with record monthly | 5.96% H 9 production of 33.5kt.of copper in September a= Sal thi rag" 5.44% 5.60% TT Ss Lo ee : ee a4 igiz@ H Lower end o

  13. Slide 13: Kamoa-Kakula Phase 3: Construction Well Underway

    KAMOA-KAKULA PHASE 3: CONSTRUCTION WELL UNDERWAY Civil construction works underway for Phase 3 expansion and direct-to-blister flash smelter; both expected to be commissioned in Q4 2024 Basic engineering design for Kamoa-Kakula’s Phase 3 expansion complete; results to be included in the updated tech

  14. Slide 14: On Track to Become World's Third-Largest Copper Mining Complex

    ON TRACK TO BECOME THE WORLD'S THIRD-LARGEST COPPER MINING COMPLEX BY Q4 2024 Phase 3 to increase Kamoa-Kakula’s processing capacity to over 14 Mtpa, positioning Kamoa Copper Kamoa-Kakula Phased Ramp-Up to 600ktpa as the world’s third-largest copper mining complex ~600ktpa Cu by 2024 16 Design throu

  15. Slide 15: Kamoa-Kakula Among the World's Largest Copper Deposits

    KAMOA–KAKULA AMONG THE WORLD’S LARGEST COPPER DEPOSITS Measured & Indicated Resource and Grade Inferred Resource and Grade 150 3.0% Contained Copper (Mt) Copper Grade (%) 125 2.5% 100 2.0% 75 1.5% 50 1.0% 25 0.5% - - Source: Company filings, Wood Mackenzie. 15 Note: Selected based on copper containe

  16. Slide 16: Kamoa-Kakula: Integrated Development Plan

    KAMOA-KAKULA: INTEGRATED DEVELOPMENT PLAN Phase 5 (Full Processing Capacity) 19.0 Phase 4 15.2 Kakula West Mine Milled (Mtpa) 11.4 Phase 3 Kamoa North Kansoko Mine Mines 7.6 Phase 2 (7.6 Mtpa) Phase 1 (3.8 Mtpa) July 2021 3.8 Kakula Mine Direct-to-Blister Copper Smelter Commences – 2020 2022 2024 20

  17. Slide 17: Western Foreland: The Next Great Copper Frontier

    WESTERN FORELAND: THE NEXT GREAT COPPER FRONTIER Ivanhoe controls ~2,400 km2 of exploration licences adjacent to the Kamoa-Kakula mining complex, covering a strike length of ~175 km Regional large-scale exploration drilling targeting Kamoa-Kakula- style copper mineralization has commenced 17 17

  18. Slide 18: Platreef: Underground Development Underway

    PLATREEF: UNDERGROUND DEVELOPMENT UNDERWAY Phase 1 first production in Q3 2024; planned phased development to become one of the world’s largest, lowest-cost producers of vital “green metals” – palladium, rhodium, nickel, platinum, copper and gold Underground mine works advancing well, with over 300

  19. Slide 19: Key Highlights: February 2022 FS

    KEY HIGHLIGHTS: FEBRUARY 2022 FS Shown on 100%-basis in US$ 2022 FS (Phase 1 → 2) Annual Throughput 0.7Mt → 5.2Mt Annual 3PE+Au 113koz → 591koz Annual Ni + Cu 8Mlb → 42Mlb Total Cash Costs (LOM) (1) $514/oz 3PE+Au Initial / Expansion Capital $0.5 Bn / $1.5 Bn LONG- After-tax NPV8%(2) $1.7 Bn TERM PR

  20. Slide 20: Platreef: Potential to Become Among World's Largest Primary PGM Producers

    PLATREEF: POTENTIAL TO BECOME AMONG THE WORLD’S LARGEST PRIMARY PGM PRODUCERS Platreef 2014 PEA 3PE+Au Production 2019 (Pd Eq. oz) (LoM Average) 1,600 3PE+Au Production Palladium Equivalent Production (koz) 1,400 Ni+Cu Production Ni+Cu Production 2019 (Pd Eq. oz) Platreef 1,200 2022 FS (Phase 2) 1,0

  21. Slide 21: Platreef: Industry Leading Cash Cost

    PLATREEF: INDUSTRY LEADING CASH COST Global primary PGM producer net total cash cost + sustaining capital (2021), US$/3PE+Au oz Quartile 1 Quartile 2 Quartile 3 Quartile 4 1,800 1,600 Platreef 2022 FS cash cost: 1,400 US$514/oz 3PE+Au 1,200 US$/3PE+Au 1,000 800 600 400 200 0 Western Limb Eastern Lim

  22. Slide 22: Kipushi: Historic, Ultra-High-Grade Zinc Deposit

    KIPUSHI: HISTORIC, ULTRA-HIGH-GRADE ZINC DEPOSIT World’s top 10 major zinc mines (ranked by 2020 production) Brownfield, ultra-high-grade zinc mine with significant, rehabilitated 600 35 underground infrastructure Contained Zinc Production (kt) Contained zinc production (kt) 500 30 Ore milled head g

  23. Slide 23: Kipushi: In Construction

    KIPUSHI: IN CONSTRUCTION Breaking-of-ground ceremony in August marked the start of construction activities 2022 Feasibility Study Results at Different Zinc Prices: First concrete pour took place in October 2022; bulk of long-lead items for the processing plant NPV8% (US$ Billion) IRR (%) ordered 97%

  24. Slide 24: Key Highlights: February 2022 FS

    KEY HIGHLIGHTS: FEBRUARY 2022 FS Shown on 100%-basis in US$ FS Throughput 800ktpa Zinc Produced(1) 240ktpa C1 Cash Costs(1) US$0.65/lb Initial Capital $382M LONG- After-tax NPV8%(2) $941M TERM PRICES IRR (Real %)(2) 41% SPOT After-tax NPV8%(3) $1.4B PRICES (Sept 2022) IRR (Real %)(3) 54% (1) Life-of

  25. Slide 25: Three long-life, world-class Robust, experienced Committed support from key Strong balance sheet with Kakula

    29 Cu Three long-life, world-class Robust, experienced Committed support from key Strong balance sheet with Kakula is on track to mines with low costs, low management team with an partners CITIC and Zijin cash & cash equivalents of increase annual copper capital intensity and established track recor