Iluka Resources Limited · ASX:ILU

Iluka Resources — Bank of America Merrill Lynch Global Metals, Mining and Steel Conference 2016

31 slides from Iluka Resources's conference presentation, May 2016

  1. Slide 1: Iluka Resources Limited

    Iluka Resources Limited Bank of America Merrill Lynch Global Metals, Mining and Steel Conference David Robb, Managing Director and CEO, Iluka Resources Limited (ASX: ILU) Florida, May 2016

  2. Slide 2: Disclaimer – Forward Looking Statements

    Disclaimer – Forward Looking Statements Forward Looking Statements This presentation contains certain statements which constitute “forward-looking statements”. These statements include, without limitation, estimates of future production and production potential; estimates of future capital expenditu

  3. Slide 3: Mineral Sands – Part of Everyday Life

    Mineral Sands – Part of Everyday Life Roof/building/ Home/office Bathroom/ Kitchen/ Automotive Sporting goods/ Healthcare/ Aircraft/ construction lifestyle utilities recreation medicine industry 3

  4. Slide 4: Zircon Applications

    Zircon Applications Zirconia, Zirconium Chemicals Ceramics Refractory and Foundry and Metal ~50% of demand ~30% of demand ~20% of demand Zircon has many unique properties Zircon is opaque, water, chemical and Zircon is heat resistant and non-reactive Uses include fibre optics, abrasion resistant Use

  5. Slide 5: Titanium Applications

    Titanium Applications Pigment Titanium Metal Welding (flux) ~90% of demand ~6% of demand ~4% of demand Nanomaterials Growing market Titanium metal has high strength to Titanium dioxide pigment is opaque weight ratio and is corrosion resistant. Uses include solar cells, water (white), UV resistant an

  6. Slide 6: Iluka Resources Limited

    Iluka Resources Limited Objective – to create and deliver value for shareholders • ~A$2.4 bn market capitalisation; 6th ranked Australian resource company • Leading position in mineral sands industry ‒ largest producer of zircon – market share ~35% ‒ significant high grade titanium dioxide feedstock

  7. Slide 7: Sustainable Development

    Sustainable Development Land Rehabilitation Jacinth-Ambrosia • Stable LTIFR, increase in TRIFR – minor injuries/first aid – additional focus • Strong safety culture/performance evidenced by exemplary synthetic rutile kiln restart • Excellent land rehabilitation progress – 3rd consecutive year of net

  8. Slide 8: Capital Management Discipline

    Capital Management Discipline • Iluka’s approach: – maintain a strong balance sheet • Iluka’s distribution framework: – pay a minimum 40% of FCF not required for investing or balance sheet activity – distribute maximum practicable level of available franking credits • Balance sheet 2015 year end: –

  9. Slide 9: Capital Management Trend

    Capital Management Trend • Shareholder focused capital management approach evident since 2007 • 2010 - 2015 cash returned to shareholders >2X cash retained ($715m vs $340m) • Balance sheet strength enhanced in 2015 – additional facilities, longer tenor • Significant funding headroom – ability to act

  10. Slide 10: Balanced Apportionment of 2015 Cash Flow

    Balanced Apportionment of 2015 Cash Flow 2015 Operating Cash Flow Usage ($m) Innovation & Technology $28.0 Debt Reduction $75.5 Exploration $27.7 Tapira $2.7 Investment Free Cash Flow $125m $155m Capex $62.3 Fully Franked Dividends $79.5 Metalysis $4.1 Net cash inflow from operating activities in th

  11. Slide 11: Mineral Sands Value Chain

    Mineral Sands Value Chain CAPITAL DISCIPLINE RESOURCE MINING AND MINERAL SANDS SUSTAINABLE CUSTOMER MINERAL SANDS AND BALANCE SHEET DEVELOPMENT PROCESSING PROJECTS/GROWTH DEVELOPMENT FOCUS – PART OF MANAGEMENT OPTIONS EVERYDAY LIFE  Focus on return on capital  Resource identification,  Integrated

  12. Slide 12: Integrated and Flexible Operations

    Integrated and Flexible Operations 12

  13. Slide 13: Historical Production and Sales

    Historical Production and Sales Historical Zircon Production and Sales Historical Rutile and Synthetic rutile Production and Sales 2011 - 2015 2011 - 2015 Cumulative zircon production 1,976kt Cumulative rutile and synthetic rutile production 1,700kt Cumulative zircon sales 1,797kt Cumulative rutile

  14. Slide 14: Unit Costs and Unit Revenue – 2016 Trend

    Unit Costs and Unit Revenue – 2016 Trend Production, Revenue per tonne Sold and Unit Cash Costs / COGS $1136/t $1030/t $862/t $780/t $668/t $558/t • 2016 trend - lower cash costs of production; lower unit cash costs • COGS should inform modeling - refer Iluka’s Key Physical and Financial Parameters

  15. Slide 15: Iluka – Growth Focus

    Iluka – Growth Focus FINANCIAL FOCUS GROWTH FOCUS AREAS Marketing and Projects Exploration Innovation and Other Market Development Mineral Sands Mineral Sands / Technology Options - Direct sales - Internal options Other Commodities - resource - Metalysis, Tapira arrangements advanced commercialisati

  16. Slide 16: Industry Supply Considerations

    Industry Supply Considerations • Short term factors – inventory and surplus upgrading capacity in hands of major producers – fresh capital (~$1.6 billion) required to sustain production – cash flow and balance sheet stress for several industry players • Supply forecasts should allow for: – assemblag

  17. Slide 17: Global Grade and Assemblage Challenges

    Global Grade and Assemblage Challenges HM Grade Mineral assemblage in resources RZ Assemblage 5.0% 15% 13% Trash Sulphate Ilmenite 4.0% 12% Chloride Ilmenite Rutile (and other high grade TiO2) 3.0% 9% 9% Zircon Combined RZ in HM (RHS) 6% 2.0% 6% • Trash component in Heavy Mineral grade increasing •

  18. Slide 18: Industry Re-investment Activity

    Industry Re-investment Activity Source: TZMI, S&P Capital IQ, company announcements • Iluka estimates ~US$1.6b to be spent on major projects during the next few years to sustain production – this estimate excludes maintenance capital – relates to major existing producers, not potential new players 1

  19. Slide 19: Zircon Supply Outlook

    Zircon Supply Outlook Source: Iluka * Zircon production from 2016 onwards excludes any finished goods inventory held at 31 December 2015, but includes zircon processed from concentrate stockpiles held by Iluka at the end of 2015. • Zircon from existing producers declining due to depletion and declin

  20. Slide 20: Industry Technology Waves

    Industry Technology Waves 20

  21. Slide 21: Hub and Spoke Distribution

    Hub and Spoke Distribution 21

  22. Slide 22: Commitment to Internal Project Development

    Commitment to Internal Project Development Balranald, Murray Basin, Victoria/NSW Cataby, Western Australia Eucla Basin, South Australia Aurelian Springs/Hickory, United States Puttalam, Sri Lanka 22

  23. Slide 23: Exploration

    Exploration • Well funded, consistent exploration programme ~$20 million per annum • Gated approach to exploration progress and expenditure • Mineral sands exploration in Australia − testing new concepts in mature basins • Increasing international activity − Sri Lanka, Kazakhstan, Brazil, US, Denmar

  24. Slide 24: Innovation and Technology

    Innovation and Technology • Means to address resource challenges – current and future • Network of site based process specialists supported by central technology group • Dedicated Metallurgical Test Facility (MTF): − mimics mineral sands value chain − supports development of new technologies • Suppo

  25. Slide 25: Metalysis, UK

    Metalysis, UK • Iluka equity holding of 28% • Potential to revolutionise metal powder production: – cost-effective and simple – transformational products • Iluka shareholder value potential: – large position in valuable company (IPO) – titanium feedstock supply and customisation – increased global d

  26. Slide 26: Business Characteristics - 2016

    Business Characteristics - 2016 • Continued investment in exploration, technology, marketing, people • First half, significant investment in innovative mining and processing solutions • Cataby project execute planning and Balranald project FS Stage 1 completion • Physical and financial parameters (F

  27. Slide 27: Market Conditions – Zircon

    Market Conditions – Zircon • January/February sales in line with expectations • Low zircon buying in March for price-related reasons – rumoured 2Q price reduction by a major supplier • Iluka ASX Release 7 April – Zircon Reference Price reduced by ~10% to ~US$950/tonne1 • European zircon demand firme

  28. Slide 28: Market Conditions – High Grade TiO2

    Market Conditions – High Grade TiO2 • Demand for TiO2 pigment (largest market for feedstocks) improved since end of 2015 – series of price increases for pigment announced • Earlier R/SR supply requested by some customers • Additional TiO2 sales secured above contracted volumes • Demand improvement,

  29. Slide 29: Investment Considerations – Near Term

    Investment Considerations – Near Term • Sound financial position at “low point” of cycle – reasonable margins, +ve cash flow, balance sheet strength • Disciplined capital allocation and flexible investment timing • Lower operating costs • Value realisable from inventory • Counter-cyclical opportunit

  30. Slide 30: Investment Proposition – Medium Term

    Investment Proposition – Medium Term CREATE AND DELIVER VALUE FOR SHAREHOLDERS SHAREHOLDER FOCUS Iluka is focussed on shareholder returns through the cycle FAVOURABLE MINERAL SANDS Favourable medium term demand dynamics vs DEMAND VS SUPPLY challenging investment and supply outlook Integrated mining

  31. Slide 31: Iluka Resources Limited

    Iluka Resources Limited For more information contact: Dr Robert Porter, General Manager Investor Relations robert.porter@iluka.com +61 (0)3 9225 5008 / +61 (0) 407 391 829 www.iluka.com

Iluka Resources — Bank of America Merrill Lynch Global Metals, Mining and Steel Conference 2016 on 6ix