Renewables Infrastructure Group Limited GBP Red.Shs · LSE:TRIG

Renewables Infrastructure Group Limited GBP Red.Shs — The Renewables Infrastructure Group — H1 2016 Earnings Presentation

29 slides from Renewables Infrastructure Group Limited GBP Red.Shs's earnings presentation, Aug 18, 2016

  1. Slide 1: Interim results for six months to 30 June 2016

    THE RENEWABLES INFRASTRUCTURE GROUP Interim results for six months to 30 June 2016 18 August 2016 www.TRIG-Ltd.com

  2. Slide 2: Important Information

    IMPORTANT INFORMATION By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound by the following limitations: This document is an advertisement and is not a prospectus. Any decision to purchase shares in The Renewables Infrastructure Compa

  3. Slide 3: Contents

    CONTENTS Introduction 4 Speakers: Overview of Results 5 Richard Crawford, InfraRed Capital Partners Growth and Funding 6 Phil George, InfraRed Capital Partners Stability of Project Revenue Sources 7 Valuation 8 Jaz Bains, Renewable Energy Systems Financial Results 10 Operations 13 Growth in Renewabl

  4. Slide 4: Introduction to TRIG

    INTRODUCTION TO TRIG The leading London-listed renewables investment company1  TRIG is invested in 51 operational onshore wind and solar projects in the UK, France and Ireland About Us  London-listed Guernsey investment company (IPO in 2013) with independent board of non-executive directors  Advi

  5. Slide 5: Overview of Results

    OVERVIEW OF RESULTS For the six months to 30 June 2016 FINANCIAL NAV per share: 97.0p (Dec 2015: 99.0p), reflects dividends relating to 9 months1 Earnings per share: 2.6p (H1 2015: 3.2p), affected by lower power prices Ongoing charges: 1.15% (H1 2015: 1.24%) Funding: Revolving acquisition facility r

  6. Slide 6: Growth and Funding

    GROWTH AND FUNDING Scale, diversification, strategic partnerships INVESTMENTS EVOLUTION OF TRIG’S PORTFOLIO January 2016: £44m in French solar portfolio (21MW)1 Jun-2016 Dec-2015 IPO o Diversified across four French regions of Provence, Corsica, Jul-2013 Guadeloupe and La Réunion Number of Projects

  7. Slide 7: Stability of Project Revenue Sources

    STABILITY OF PROJECT REVENUE SOURCES More than two-thirds of near-term revenues not linked to power prices PROJECT REVENUE BY TYPE1 Next 12 months2 £250m £200m £150m £100m £50m - 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 Fixed

  8. Slide 8: Portfolio Valuation Bridge – June 2016

    PORTFOLIO VALUATION BRIDGE – JUNE 2016 Movement of key elements in the Directors’ valuation 3 1 2 1. Consists of changes in interest rates and discount rates 2. At the Company level there was a £6.1m loss on FX hedges. The net FX impact for the Company is hence a £5.7m gain for the period. 3. This r

  9. Slide 9: Valuation – Key Variables

    VALUATION – KEY VARIABLES 30 June 2016 31 December 2015 Discount Rate1 Weighted average 8.7% 9.0% Power Prices2 Weighted by market Based on third party forecasts Based on third party forecasts UK 2.75% 2.75% Inflation France & Rep. of Ireland 2.00% 2.00% Foreign Exchange EUR / GBP 1.20 1.36 BLENDED

  10. Slide 10: Summary Income Statement

    SUMMARY INCOME STATEMENT Reflects lower power prices partially offset by reduced discount rates and FX movements Six months to Six months to 30 June 2016 30 June 2015 £m £m Statutory Adjustments Expanded Basis1 Expanded Basis Basis Total operating income 25.9 6.9 32.8 17.1 Acquisition costs - - - (0

  11. Slide 11: Summary Balance Sheet

    SUMMARY BALANCE SHEET NAV per share impacted by acceleration of dividend in H1 30 June 2016 31 December 2015 £m £m Statutory Basis Adjustments Expanded Basis Expanded Basis Portfolio value 743.0 16.5 759.5 712.3 Working capital (4.5) (1.2) (5.7) (0.9) Debt - (15.9) (15.9) - Cash 5.6 0.6 6.2 15.2 Net

  12. Slide 12: Summary Cash Flow

    SUMMARY CASH FLOW Resilient cash flows; lower dividend cover in current power price environment Six months to Six months to 30 June 2016 30 June 2015 £m £m Statutory Basis Adjustments Expanded Basis Expanded Basis Cash received from investments 23.8 7.0 30.8 24.8 Operating and finance costs outflow

  13. Slide 13: Diversification – Technology / Location

    DIVERSIFICATION – TECHNOLOGY / LOCATION June 2016: 680 MW net capacity / 51 projects France 13% Rep. of Ireland / SEM 2% England / GB 30% N. Ireland / SEM 8% BY JURISDICTION/ POWER MARKET1 Scotland / GB 47% Solar Onshore Wind / 31% Atlantic 63% BY TECHNOLOGY/ WEATHER SYSTEM2,3 Onshore Wind / Mediter

  14. Slide 14: Operational Performance (1)

    OPERATIONAL PERFORMANCE (1) Challenging weather conditions in H1 – mitigated by diversification UK AVERAGE WIND SPEED4 OVERALL PRODUCTION / WEATHER H1 aggregate portfolio generation was 738 GWh1 o Up 29% on H1 2015 with increase in portfolio scale o 9% below P50 budget for portfolio o Largest contri

  15. Slide 15: Operational Performance (2)

    OPERATIONAL PERFORMANCE (2) Active management to maximise operational performance SPECIFIC FACTORS (H1 2016) ENHANCEMENT INITIATIVES Unusual levels of grid outages: Comprehensive portfolio monitoring: enabling multi-site initiatives due to new (mainly solar) plant connections and interventions Equip

  16. Slide 16: Growth in Renewables Market

    GROWTH IN RENEWABLES MARKET Further portfolio opportunities UK RENEWABLES: CAPACITY OUTLOOK ▲ UK pipeline remains strong, driven by historic build March March Estimate Estimate Generation activity in onshore wind and solar PV 2015 2016 2020 2020 2015 Capacity1 Capacity2 Capacity3 EV3 TWh4 ▲ UK new d

  17. Slide 17: Outlook

    OUTLOOK Distinct management  InfraRed and RES: active management of portfolio combination  Diversified Substantial portfolio  Low ongoing charges ratio Power price forward  Impetus from currency movement post Brexit market improving  Long term supply / demand dynamics Generating attractive  Ca

  18. Slide 18: Appendices

    ATRIG APPENDICES 18

  19. Slide 19: TRIG – Experienced Management

    TRIG – EXPERIENCED MANAGEMENT INDEPENDENT BOARD INVESTMENT MANAGER OPERATIONS MANAGER Helen Mahy CBE (Chair)  20 years of experience in  One of the world's leading renewable infrastructure and real estate funds energy developers and operators Jonathan Bridel  Over US$9 billion of equity under  P

  20. Slide 20: Senior Management Team

    SENIOR MANAGEMENT TEAM Over 100 years of relevant experience on the TRIG Advisory Committee TRIG Independent Board Helen Jonathan Klaus Shelagh (Non-Executive) Mahy CBE Bridel Hammer Mason (Chairman) Investment matters TRIG Investment Werner Chris Tony Jon Richard von Gill Roper Entract Crawford Com

  21. Slide 21: Operations Management

    OPERATIONS MANAGEMENT Breadth and depth of capability provided by RES MANAGING PERFORMANCE RES: RESOURCING STRUCTURE o Availability – minimising lost production, fault rectification o Generation – maximising output, maintenance planning, turbine & grid settings o Financial – budget control, minimisi

  22. Slide 22: Counterparties

    COUNTERPARTIES Broad spread of high quality equipment, maintenance and off-take counterparties COUNTERPARTIES BY RELATIVE VALUE OF ASSOCIATED PROJECTS AND NUMBER OF PROJECTS1 The supplier that TRIG has the largest exposure to is Siemens who provide turbine maintenance services to 46% of the TRIG pro

  23. Slide 23: NAV Sensitivities

    NAV SENSITIVITIES Based on portfolio as at 30 June 2016 23

  24. Slide 24: Dividend Schedule

    DIVIDEND SCHEDULE Dividend target of 6.25p per share, with upside from inflation Period Aggregate annual dividend per share Interim dividends per share Payment timing Q4 2016 1.5625p Target 3/2017 Q3 2016 1.5625p Target 12/2016 6.25p Q2 2016 1.5625p Due 9/2016 Q1 2016 1.5625p Paid 6/2016 H2 2015 3.1

  25. Slide 25: Enhancing Diversification – Akuo Portfolio

    ENHANCING DIVERSIFICATION – AKUO PORTFOLIO Investment in January 2016  15 operational French solar PV projects o Gross generating capacity of 49MW  Euro €57m (£44m) investment1 o 49% of holding company equity + 100% of a mezzanine loan  Partnering with Akuo Energy - a major renewables developer i

  26. Slide 26: Outlook: EU Power Capacity Installations

    OUTLOOK: EU POWER CAPACITY INSTALLATIONS Wind + Solar PV: dominating European new power capacity 2013 Share of EU New Power Capacity (Total = 35GW) 2014 Share of EU New Power Capacity (Total = 27GW) 2015 Share of EU New Power Capacity (Total = 29GW) Source: Data from EWEA Annual Statistics (Copyrigh

  27. Slide 27: UK Government Benchmark Yields

    UK GOVERNMENT BENCHMARK YIELDS Low rate environment makes yielding assets attractive UK GILT YIELDS (LAST 5 YEARS) 5 4.5 IPO 4 30-yr Gilt 3.5 3 10-yr Gilt 2.5 2 1.5 1 3-yr Gilt 0.5 0 Source: InfraRed, Thomson Reuters 27

  28. Slide 28: TRIG: Key Facts

    TRIG: KEY FACTS Fund Structure ▲ Guernsey-domiciled closed-end investment company Performance ▲ Quarterly dividend of 1.5625p ▲ Maintained annual dividend yield of c.6.0% Issue / Listing ▲ Premium listing of ordinary shares on the Main Market of the ▲ 2015 Total Shareholder Return of 8.1% (versus 0.

  29. Slide 29: Contacts

    CONTACTS INVESTMENT MANAGER OTHER ADVISERS INFRARED CAPITAL PARTNERS LTD ADMINISTRATOR / COMPANY SECRETARY REGISTRAR 12 CHARLES II STREET AZTEC FINANCIAL SERVICES (GUERNSEY) LTD CAPITA REGISTRARS (GUERNSEY) LTD LONDON SW1Y 4QU EAST WING MONT CREVELT HOUSE +44 (0)20 7484 1800 TRAFALGAR COURT BULWER A

The Renewables Infrastructure Group — H1 2016 Earnings Presentation on 6ix