  1. Slide 1: Montepuez Graphite Project Investor Presentation

    Montepuez Graphite Project Investor Presentation February 2020 1

  2. Slide 2: Montepuez Graphite Project Summary

    Montepuez Graphite Project Summary Ore resources of 119.6 million tonnes 8.1% TGC1 Ore Body6 Ore reserves of 42.2 million metric tonnes 9.3% TGC Plant feed of 500,000 tpa 12% TGC Operations6 Product output of +50,000 tpa 96%TGC OPEX7 Opex is in the lowest cost quartile / tonne in the global market U

  3. Slide 3: The Team

    The Team Battery Minerals executive team has a combined 100 years of industry experience with extensive experience in Mozambique and African project development and operations Organisational Chart Jeremy Sinclair David Flanagan Jeff Dowling Board Member Non-Executive Chairman Board Member Naomi Scot

  4. Slide 4: The Market – Traditional Graphite

    The Market – Traditional Graphite Demand for graphite is expected to double in the next five years, driven by LiB manufacturers and traditional markets 1 Natural Graphite Flake Producer1 2 Spheronizers & Purifiers2 3 Coaters Mining and Processing Shaping Purification Coating Natural Graphite Spheric

  5. Slide 5: The Market – LiB

    The Market – LiB A paradigm shift in the demand for sustainable transportation … where graphite will play a central role as an essential mineral and energy storage is on the horizon … towards the manufacturing of LiBs LIB demand by end-use sector Composition of a NMC3 6-2-2, 62 kWh LiB GWh 4,500 5,0

  6. Slide 6: Our Projects

    Our Projects Pemba Port 60km unsealed road Berth 8 – 12m deep draft Capacity 3 – 4 Mtpa cargo and goods 200km sealed road from 60km sealed Pemba to town of road Montepuez Vessel Size Geared – 30,000dwt to 40,000dwt Shipping China / USA / Europe via Route Durban or Dar es Salaam Upgrade in 24/7 opera

  7. Slide 7: Montepuez Graphite Project – Ore Bodies

    Montepuez Graphite Project – Ore Bodies Project is underpinned by high quality and strategically large resources and reserves providing a +50 life of mine November 2018 Ore Reserve Estimate1 Significant Exploration Upside Ore Ore Type %TGC (Mt) Weathered 5.98 8.34% Fresh 36.21 9.42% Total 42.19 Buff

  8. Slide 8: Montepuez Graphite Project – Stage 1

    Montepuez Graphite Project – Stage 1 With Site infrastructure completed, The Project is positioned for construction start and a fast track path to production Stage 1 Project Metrics1 Project Achievements Plant Feed 500,000 tpa Approvals Mining and Environmental Licenses Approved Grade Processed 12 %

  9. Slide 9: Montepuez Graphite Project Stage 1 Economics

    Montepuez Graphite Project Stage 1 Economics4 Low CAPEX and lowest cost quartile OPEX with a year 1 to 10 basket price of US$ 923/t concentrate = Robust project economics Capital Breakdown1 US$ mn Year 1 – 10 C13 Cost Breakdown US$/t flake Process Plant and Power 27.4 Mining 100 Mining Equipment and

  10. Slide 10: Balama Central Graphite Project

    Balama Central Graphite Project Project is underpinned by high grade and quality resources and reserves providing a +35 life of mine Balama Central Project Metrics Project Achievements November 2018 Ore Reserve Estimate1 Mining and Environmental Licenses Ore Plant Feed 500,000 tpa Approvals Ore Type

  11. Slide 11: Our Community

    Our Community Battery Minerals will continue to make key social and environmental interventions in the local community over the life of mine Food Security Health Education Training Infrastructure • Support improved crop • Upgraded Mirate Health • Built fully equipped school – • Committed to employ 7

  12. Slide 12: The Value of Vertical Integration

    The Value of Vertical Integration The anode pre-cursor value chain is currently controlled by China, an opportunity exists to enter this valuable vertically integrated with the increased participation of strategic non-Chinese customers who rely on anode pre-cursor material supply Added value to inve

  13. Slide 13: Our Path Forward

    Our Path Forward Battery Minerals is positioned to respond to the growing, diversified graphite market Fund The Project Build the Project Commission the Project • ThirdWay Africa appointed as lead financial • Complete due diligence • Wet commission the process plant advisor1 • Appoint EPCM • Complet

  14. Slide 14: Disclaimer

    Disclaimer Forward Looking Statements • Statements and material contained in this Presentation, particularly • The information in this report that relates to Battery Minerals’ • Battery Minerals confirms that it is not aware of any new those regarding possible or assumed future performance, resource

  15. Slide 15: Appendix - Resource and Reserve Details

    Appendix - Resource and Reserve Details Montepuez Graphite Project Balama Central Graphite Project Montepuez Graphite Project1 Ore Reserve Estimate (6% TGC cut-off grade) 3 November 2018 Ore Reserve Estimate Pit Ore type Ore (Mt) TGC (%) Deposit Ore type Ore (Mt) TGC (%) Lennox Weathered 3.36 11.09

  16. Slide 16: Thank You

    THANK YOU Battery Minerals – Perth Battery Minerals – Maputo 10 Ord Street, Edificio Solar Das Acácias, West Perth, WA 6005 Avenida Julius Nyerere, N 4000, Australia Porta 05, Maputo, Mozambique David Flanagan – Non-Executive Chairman T + 61 (08) 6148 1000 E david.flanagan@batteryminerals.com ThirdW

Battery Minerals — Investor Presentation (February 2020) on 6ix