  1. Slide 1: Corporate Presentation - TD Securities Mining Conference

    CORPORATE PRESENTATION TD SECURITIES MINING CONFERENCE J A N U A R Y 1 9 , 2 0 17

  2. Slide 2: Cautionary Notes

    CAUTIONARY NOTES Cautionary Note Regarding Forward-Looking Information This presentation contains certain information that may constitute forward-looking information under applicable Canadian and U.S. securities legislation, including but not limited to information about results of exploration, deve

  3. Slide 3: Gaining Scale in North America

    GAINING SCALE IN NORTH AMERICA GROWING PRODUCTION PROFILE, STRONG UPSIDE POTENTIAL Consolidating in Three Flagship Assets Northern Nevada – True North developing in Nevada; Aurora provides three mines serviced into our third significant additional optionality by one central mill operation in North A

  4. Slide 4: Executive Management Team

    EXECUTIVE MANAGEMENT TEAM TRACK RECORD OF EXECUTION PAUL ANDRÉ HUET, A.Sc.T. MIKE DOOLIN PRESIDENT, CEO AND DIRECTOR CHIEF OPERATING OFFICER 29 years of mining experience within 28 years with extensive experience in North America, focused on underground metallurgy, design, and permitting of narrow v

  5. Slide 5: Compelling Value Proposition

    COMPELLING VALUE PROPOSITION • No LTA’s for ~4 years at Fire Creek, ~2 years at Midas and ~357 days at True North MANAGEMENT • Significant experience in narrow vein underground mining TRACK RECORD • On track to achieve full year financial and operational targets Flagship Assets in Nevada: GROWING •

  6. Slide 6: Consolidated Operational Highlights

    CONSOLIDATED OPERATIONAL HIGHLIGHTS Three months ended December 31, 2016 Twelve months ended December 31, 2016 Nevada True Nevada True Fire Creek Midas TOTAL Fire Creek Midas TOTAL Total North Total North ORE TONS MILLED 27,721 53,809 81,530 63,962 145,492 120,553 190,982 311,535 95,710 407,245 AVER

  7. Slide 7: 2017 Operational Guidance

    2017 OPERATIONAL GUIDANCE GEO Production Cash Costs per GEO Sold(1) CapEx ($M) LOW HIGH LOW HIGH LOW HIGH MIDAS 42,000 45,000 $925 $950 $11 $12 MIDAS MILL – – – – $4 $5 FIRE CREEK 97,000 100,000 $475 $500 $27 $29 HOLLISTER(2) 30,000 35,000 $935 $960 – – NEVADA TOTAL 169,000 180,000 $670 $700 $42 $46

  8. Slide 8: Evolving into Mid-Tier Producer

    EVOLVING INTO MID-TIER PRODUCER 8

  9. Slide 9: Nevada Operational Highlights

    NEVADA OPERATIONAL HIGHLIGHTS CONSOLIDATED STATISTICS Q4 2016 FY 2016 Production (GEOs) 43,264 150,099 Sales (GEOs) 40,504 150,068 Tons per day milled 886 tpd 854 tpd Mill head grade (AuEq) 0.57 opt 0.52 opt 93.7% Au 93.7% Au Recovery 84.0% Ag 86.7% Ag • YTD production of 150,099 GEOs; above the top

  10. Slide 10: Fire Creek Operational Highlights

    FIRE CREEK OPERATIONAL HIGHLIGHTS FIRE CREEK STATISTICS Q4 2016 FY 2016 Production (GEOs) 27,873 102,352 Sales (GEO)s 27,342 99,986 Tons per day milled 301 tpd 330 tpd Mill head grade (AuEq) 1.07 opt 0.91 opt 93.8% Au 93.6% Au Recovery 84.4% Ag 86.6% Ag • 2016 YTD production of 102,352 GEOs; increas

  11. Slide 11: Midas Operational Highlights

    MIDAS OPERATIONAL HIGHLIGHTS MIDAS STATISTICS Q4 2016 FY 2016 Production (GEOs) 15,391 47,747 Sales (GEOs) 13,162 50,082 Tons per day milled 585 tpd 523 tpd Mill head grade (Au Eq) 0.32 opt 0.27 opt 93.5% Au 93.9% Au Recovery 83.9% Ag 86.7% Ag • Average GEO mill head grade of 0.32 opt; ~14% increase

  12. Slide 12: True North Operational Highlights

    TRUE NORTH OPERATIONAL HIGHLIGHTS TRUE NORTH STATISTICS Q4 2016 FY 2016 Production (Au Eq oz) 8,445 10,198 Sales (Au Eq oz) 7,028 8,028 Tons milled 695 tpd 262 tpd Mill head grade (Au Eq) 0.14 opt 0.11 opt Recovery 93.4% Au 92.7% Au Course gold on shaker table • P&P Mineral Reserve of 85.5k(1) Au oz

  13. Slide 13: True North Exploration Overview

    TRUE NORTH EXPLORATION OVERVIEW 967-16-005 967-16-004 4.89 opt Au over 2.4 ft., 1.76 opt Au over 1.0 ft., or or 60.4 g/t over 0.3 m 167.7 g/t over 0.7 m 620-16-013 0.95 opt Au over 6.0 ft., or 32.7 g/t over 1.8m 588-16-024 1.24 opt Au over 5.0 ft., or 42.4 g/t over 1.5m 711 up-dip drilling 24 Level

  14. Slide 14: Hollister/Aurora Acquisition Overview

    HOLLISTER/AURORA ACQUISITION OVERVIEW • Purchase price of $80M cash plus shares and warrants Hollister • A high-grade, fully permitted (EIS in hand) underground gold mine ~19 miles from the Midas mill – Historical production from 2007 - 2012 of ~425,000 GEOs at an average grade of ~1.0 opt • High gr

  15. Slide 15: Hollister/Aurora Acquisition

    HOLLISTER/ AURORA ACQUISITION • Power costs significantly reduced when connected to the grid • Powerline and surface exploration now possible with EIS on hand • EIS includes permitting for secondary ramp at Hatter Graben • Drifting extended Gloria zone ~1,200 ft to the West • New and improved dewate

  16. Slide 16: Potential Synergies of ~$15M Annually

    HOLLISTER/AURORA ACQUISITION POTENTIAL SYNERGIES OF ~$15M ANNUALLY Shorter Trucking Distance to Mill – Lower Transportation Costs • Hollister to Aurora mill (~277 miles @ ~$100/t) vs Midas mill (~19 miles @ ~$10/t); Realizable saving of ~$90/t Lower Milling Costs • Aurora milling cost (~$96/t) vs Mi

  17. Slide 17: Hatter Graben Vein System

    HOLLISTER/AURORA ACQUISITION HATTER GRABEN VEIN SYSTEM Gloria West Currently ~1,800 ft of strike Currently ~1,800 ft of strike, Vein System and vertical extension Open and vertical extension of of ~1,200 ~1,200ft ft Hatter Graben Vein System Open In All Directions GLOR15 – 034: GLOR15 – 034: 18.36 o

  18. Slide 18: Aurora Property - Significant Exploration Potential

    AURORA PROPERTY SIGNIFICANT EXPLORATION POTENTIAL ANN PIT Channel Sample Assay SILICA RIBS 0.49 Au opt – HIGH LEVEL EXPOSURE 0.56 Au opt MVG drill hole Intercept: 5 feet @ 0.93 opt Au PROSPECTUS PIT HUMBOLDT PIT 1000 FT N 18

  19. Slide 19: Delivering on Our Commitments

    DELIVERING ON OUR COMMITMENTS MILESTONES ACHIEVED TO DATE  NO LOST TIME INCIDENTS  RECEIVED ENVIRONMENTAL ASSESSMENT AT FIRE CREEK  ACQUIRED THE TRUE NORTH MINE AND MILL IN MANITOBA, CANADA  SECURED $25 MILLION REVOLVING CREDIT FACILITY; INCREASED TO $35  POSITIVE PRODUCTION DECISION MADE AT TR

  20. Slide 20: For More Information

    For More Information John Seaberg SVP Investor Relations and Corporate Development Office 775.284.5757 Cell 303.668.7991 jseaberg@klondexmines.com

  21. Slide 21: Track Record of Operational Excellence

    TRACK RECORD OF OPERATIONAL EXCELLENCE MIDAS POST-ACQUISITION IMPROVEMENTS • Reduced workforce by 50% • 2 yard scoops, from 4 yard scoops • Increased resource, doubled grade to the mill • Transferred 25% of the equipment • Jumbo’s replaced by handheld drills for use at Fire Creek – reduced • Pre-KDX

  22. Slide 22: Selected Financial Data

    SELECTED FINANCIAL DATA SOLID FINANCIAL RESULTS (UNAUDITED) Q3 2016 Q3 2015 • Sold 7,700 more GEOs, including first 1,000 gold Revenue $53.0M $38.4M ounces from True North Income from Operations $13.1M $6.3M • ~38% increase in revenue, higher realized prices of Net Income $7.2M $4.1M $141 per gold o

  23. Slide 23: Balance Sheet Strength

    BALANCE SHEET STRENGTH IMPROVING LIQUIDITY AND WORKING CAPITAL ~$183 Million of Available Liquidity (US$M) Q3 2016 Q2 2016 Cash Flow $16.6 $23.6 from Operations Cash Balance $131.1 $36.9 Working Capital $119.9 $29.5 Secured Promissory $11.4 $11.3 Note (1) Metal inventory is the value of the estimate

  24. Slide 24: Buy-Side Outreach

    BUY-SIDE OUTREACH SHIFTING FOCUS TO INSTITUTIONAL INVESTORS CURRENT SHAREHOLDERS LOCATION % OWNERSHIP SENTRY INVESTMENTS Toronto, ON 10.87% VAN ECK ASSOCIATES New York, NY 10.01% K2 & ASSOCIATES Toronto, ON 8.4% U.S. GLOBAL INVESTORS San Antonio, TX 8.17% OPPENHEIMER New York, NY 4.94% FIDELITY (CAN

  25. Slide 25: Mineral Reserves

    MINERAL RESERVES Fire Creek Mineral Reserves Category Tons (k) Au opt Au g/t Ag opt Ag g/t AuEq opt AuEq g/t Au koz Ag koz AuEq koz Proven 121 1.703 58.40 1.37 47.1 1.722 59.05 206 166 208 Probable 119 0.715 24.51 0.50 17.0 0.722 24.74 85 59 86 Total P&P 240 1.213 41.59 0.94 32.2 1.226 42.03 291 225

  26. Slide 26: Mineral Resources

    MINERAL RESOURCES Fire Creek Mineral Resources Category Tons (k) Au opt Au g/t Ag opt Ag g/t AuEq opt AuEq g/t Au koz Ag koz AuEq koz Measured 180 1.637 56.12 1.30 44.7 1.655 56.74 294 234 298 Indicated 346 0.591 20.27 0.51 17.5 0.598 20.50 205 176 207 Total M&I 526 0.948 32.52 0.78 26.8 0.959 32.89

  27. Slide 27: Notes to Mineral Reserves and Resources

    NOTES TO MINERAL RESERVES AND RESOURCES Notes to Nevada’s Mineral Reserve and Resource 1. Mineral Resource is inclusive of Mineral Reserve. 2. Fire Creek and Midas Mineral Reserves are calculated at a gold price of US$1,200 per ounce and a silver price of US$17.00 per ounce. 3. Fire Creek and Midas