Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Non-Deal Roadshow (April 2013)

20 slides from Turquoise Hill Resources's roadshow presentation, April 2013

  1. Slide 1: An emerging new world-class copper and gold producer

    An emerging new world-class copper and gold producer Company presentation April 2013

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Investment proposition

    Investment proposition 1 Unique pure copper and gold exposure with attractive industry fundamentals 2 World class asset, strategically located next to the key growth market 3 Attractive growth profile with further expansion options 4 Plan in place to fund ongoing project development 5 Delivering on

  4. Slide 4: Unique North America-listed pure copper and gold exposure

    Unique North America-listed pure copper and gold exposure Top 15 producing copper mines (2020)(1) 2020E C1 Cash Cost ($/lb) Turquoise Hill Resources/ Oyu Tolgoi(2) Bubble size reflects contained copper resources (kt) Independent copper producer and publicly traded Owned by diversified miner or priva

  5. Slide 5: Oyu Tolgoi projected to be a major gold producer

    Oyu Tolgoi projected to be a major gold producer Top 10 deposits by contained gold reserves and  Oyu Tolgoi ranks as top 4 gold deposit resources (moz)(1) globally by contained reserves and resources  First 10 years average annual production of 495koz of gold compares favourably with mid-tier gold

  6. Slide 6: World-class asset, experienced operator

    World-class asset, experienced operator  Strategic location: o At the doorstep of the major growth market, 80km from Chinese border  Near-term and large scale: o Commercial production in June 2013(1) o Multi decade mine life o 2.2bt Measured & Indicated (M&I) and 4.4bt Inferred resource: ranks in

  7. Slide 7: Delivering on key project milestones

    Delivering on key project milestones Milestone Timeline Commence pre-stripping of open pit overburden Completed - Q2 2012  Sign binding power purchase agreement with the Inner Mongolia Power Completed – Q4 2012  Company Open 100ktpd concentrator Completed – Q4 2012  First concentrate produced Com

  8. Slide 8: Commercial production on track for June 2013

    Commercial production on track for June 2013  Phase 1 construction 99% complete  Forecast phase-one capital cost $6.2 billion, within 3% of budget  At the end of February, the mine stockpiled more than 12 million tonnes of ore  Shaft #2 construction at Hugo North progressing well – headframe rea

  9. Slide 9: Significant expansion potential and execution flexibility

    Significant expansion potential and execution flexibility Phase 1 Phase 2 Future phases • Southern Oyu Deposit: • Hugo North Deposit : • Hugo North (Lift 2)  1.0bt reserve  0.5bt reserve • Hugo South Deposit:  0.8bt Inferred resource  1.3bt M&I resource  0.9bt M&I resource • Heruga Deposit:  0

  10. Slide 10: Oyu Tolgoi long section

    Oyu Tolgoi long section Source: 2013 Oyu Tolgoi technical report. 10

  11. Slide 11: Multiple development options are available

    Multiple development options are available  All options to be evaluated to ensure optimum development pathway  Actual operating performance to be evaluated prior to committing to expansions  A decision to expand the concentrator not required before 2015 OYU TOLGOI DEVELOPMENT OPTIONS Plant Expans

  12. Slide 12: Landmark project financing well advanced

    Landmark project financing well advanced  Largest ever project financing in the mining sector  Strong project economics supported by low operating costs, significant production and Key highlights attractive market fundamentals  Debt ceiling agreed above $3-4 billion, providing financial flexibili

  13. Slide 13: Turquoise Hill investment proposition

    Turquoise Hill investment proposition  Unique pure copper and gold exposure with attractive industry fundamentals  World class asset, located 80 km from the world’s largest copper market  Attractive growth profile with further expansion options and execution flexibility  Landmark project financi

  14. Slide 14: Appendix

    Appendix 14

  15. Slide 15: Long-term copper demand drivers remain positive

    Long-term copper demand drivers remain positive Electrification of large emerging markets will While sectors such as automotive have significant further support demand further potential growth Per capita electricity consumption (GWh/capita) 1970-2010 Passenger vehicle ownership/1000 people* UK USA C

  16. Slide 16: While supply side faces increasing constraints

    While supply side faces increasing constraints Copper prices have been supported by the high YoY production losses remain to be a concern cost of incentivising new projects Greenfield project capital intensity to increase from Escondida ~$8,000/t Cu Eq. to ~$17,000/t Cu Eq.by 2025 Chuquicamata Grasb

  17. Slide 17: Oyu Tolgoi and Turquoise Hill ownership structure

    Oyu Tolgoi and Turquoise Hill ownership structure Rio Tinto OT Project Manager(1) 51% Turquoise Hill Resources Government of Mongolia 66% 34% Oyu Tolgoi LLC (1) Rio Tinto was appointed as the exclusive project manager for Oyu Tolgoi project under 2010 Heads of Agreement with Ivanhoe Mines. 17

  18. Slide 18: Updated Technical Report highlights

    Updated Technical Report highlights  Phase-two capital estimate of $5.1 billion based on 100kt per day concentrator capacity and purchased power  Increased peak underground production rate from 85kt per day to 95kt per day  Projected operating unit costs in first quartile for first 10 years  Min

  19. Slide 19: Project economics are highly attractive

    Project economics are highly attractive Description Units 2013 Reserve Case Total Processed Billion tonnes 1.5 Copper Grade % 0.89 Gold Grade g/t 0.34 Silver Grade g/t 2.03 Copper Recoverable Billion pounds 26.5 Gold Recoverable Million ounces 12.9 Silver Recoverable Million ounces 83.0 Mine Life (o

  20. Slide 20: Other assets update

    Other assets update • Operations at Ovoot Tolgoi mine resumed on March 22, 2013 • Target production of 3.2 million tonnes of semi-soft coking coal over the remainder of 2013 • 2013 target mill throughput: 1.4 -1.6 million tonnes at 1.3 – 1.5% copper and 0.8 – 1.0 g/t gold • Production commenced at S

Turquoise Hill Resources — Non-Deal Roadshow (April 2013) on 6ix