  1. Slide 1: WaterCharger Battery Storage Project

    WaterCharger Battery Storage Project Online Public Meeting October 26, 2021

  2. Slide 2: Land Acknowledgment

    Land Acknowledgment In the spirit of reconciliation, we acknowledge that this project and where we live, work and play is on the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Stoney Nakoda Nations, the Métis Nation (Region 3), and all people who

  3. Slide 3: Introductions

    Introductions Aleta Corbet – Environmental Specialist Rhonda Cummings – Hydro Stakeholder Relations Chelsea Donelon – Commercial Lead Trevor Joyal – Engagement Lead, Maskwa Environmental Richard Leeming – IT Specialist Cheryl McNeil – Stakeholder & Indigenous Relations Bryan Miller – Hydro Operation

  4. Slide 4: Agenda

    Agenda • TransAlta overview • Project Overview • Project Schedule • Project Map • Battery Energy Storage System • Regulatory Requirements • Questions from Participants 4

  5. Slide 5: TransAlta Overview

    TransAlta Overview • 110 years of generation experience • 74 generating facilities in Canada, the United States and Australia • Expertise in six fuel types: gas, coal, hydro, solar, storage and wind • Owned capacity of approximately 7,300 MW • Accelerating our clean growth strategy in renewable gene

  6. Slide 6: WindCharger – TransAlta's Pilot Battery Storage Facility

    WindCharger – TransAlta’s Pilot Battery Storage Facility WindCharger - 10 megawatt battery storage facility located near Pincher Creek, Alberta, adjacent to TransAlta’s Summerview Wind Farm 6

  7. Slide 7: WaterCharger Battery Storage Project

    WaterCharger Battery Storage Project WaterCharger is a proposed battery energy storage project located on the south side of the Ghost Hydro-electric facility. WaterCharger is designed to provide reliable electricity service to the Alberta electrical grid and support the development of additional ren

  8. Slide 8: WaterCharger Project Overview

    WaterCharger Project Overview Facts & Figures Location: Ghost Hydro-electric facility -- Rocky View County, AB (about 18 km. west of Cochrane, Alberta Fuel: Energy storage Capacity: (megawatts): 180 MW - (Phase 1 – 80-100 MW) First on-stream: 2023 Builder: TransAlta 8

  9. Slide 9: Project Schedule

    Project Schedule Preliminary Project Schedule (Subject to Change) | Q2/Q3 2021 Q4 2021 2022 2023 2025 Environmental assessments Stakeholder & Indigenous engagement AUC application submission Receipt of Q2/Q3 approvals & permits 1* Phase Q2/Q3 Construction 1* Phase Q4 Commissioning 2™ Phase Construct

  10. Slide 10: Project Map

    EXISTING FACILITIES GHOST DAM HYDRO POWER PLANT [3] 138kv SUBSTATION fa] OFFICE/ADMIN BUILDING [5] WORKSHOP BUILDING [6] OFFICE TRAILERS. WAREHOUSE PHASE 1 BATTERY ENERGY STORAGE SYSTEM PHASE 2 BATTERY ENERGY STORAGE SYSTEM ‘TEMP. CONSTRUCTION FACILITIES AREA POTENTIAL DISTRIBUTION CONNECTION AREA T

  11. Slide 11: Battery Energy Storage System

    Battery Energy Storage System • TransAlta continues to review different battery manufacturers to select a battery that utilizes industry-leading technology taking into consideration safety, reliability and performance. • The modules that house the battery can vary in size depending on the manufactur

  12. Slide 12: Environmental Assessments

    Environmental Assessments The following field surveys were completed from The following assessments are planned for the spring to the fall of 2021: completion in the fall of 2021: • Amphibian surveys • Historical Resources Impact Assessment • Wildlife sweep; including raptors • Noise Impact Assessme

  13. Slide 13: Regulatory Requirements

    Regulatory Requirements • TransAlta is planning to file its Facility Application to the Alberta Utilities Commission in December 2021 • TransAlta is seeking feedback related to the Project from Indigenous groups and stakeholders • We are working with Rocky View County to receive the appropriate perm

  14. Slide 14: Questions That We've Heard

    Questions That We’ve Heard • Battery storage technology • Contracting • Flood mitigation / dam relocation • Project benefits • Visual impact • Water management 14

  15. Slide 15: Project Contact Information

    Project Contact Information Project web link: https://transalta.com/plants-operation/watercharger/ 15