Lundin Mining Corporation · TSX:LUN

Lundin Mining — Investor Presentation (August 2015)

25 slides from Lundin Mining's investor presentation, August 2015

  1. Slide 1: Corporate Update

    TSX: LUN OMX: LUMI Corporate Update August 2015

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward-Looking Information This presentation contains forward-looking information, including, but not limited to, guidance on estimated annual production and cash costs. This forward-looking information is not based on historical facts, but rather on current

  3. Slide 3: Diversified Assets: Americas, Europe and Africa

    Diversified Assets: Americas, Europe and Africa Zinkgruvan (100%) Freeport Cobalt (24%) Zinc-Lead-Copper (Sweden) Cobalt Refinery (Finland) Eagle (100%) Nickel-Copper (USA) Neves-Corvo (100%) Aguablanca (100%) Nickel-Copper Copper-Zinc (Spain) (Portugal) Candelaria (80%) Copper-Gold-Silver Tenke Fun

  4. Slide 4: Q2 2015 Operating Highlights

    Q2 2015 Operating Highlights Operations Performed Well – meeting or exceeding expectations Copper Zinc Nickel (Cu) (Zn) (Ni) • Increased production • Largely met • Continued excellent guidance and lowered expectations with production performance cost outlook at strong results at at Eagle and Aguabla

  5. Slide 5: Q2 2015 Revenue Breakdown by Mine and Metal

    Q2 2015 Revenue Breakdown by Mine and Metal 68% of sales were from Candelaria and Eagle 66% of sales were from copper Sales Breakdown by Mine Sales Breakdown by Metal 5

  6. Slide 6: YTD Cash Costs – Very Competitive

    YTD Cash Costs – Very Competitive Source: Cost curves from Wood Mackenzie as of Q2 2015. * Cash cost curves are based on the expected annual costs for 2015, whereas YTD costs have been highlighted for LUN assets for illustrative purposes. 6

  7. Slide 7: Strong Financial Position

    Strong Financial Position US$ M June 30, 2015 Cash and Cash Equivalents $507 Net Debt1 $497 Available Credit Facilities $360 Cash and Cash Equivalents 600 $507 400 $355 $US M 200 $175 - Q4/14 Q1/15 Q2/15 • Cash balance grew by over $300M in the last six months • Net debt has improved from $829M at y

  8. Slide 8: 2015 Outlook – Guidance Improved

    2015 Outlook – Guidance Improved • Raising copper and lead (contained tonnes) Revised Guidancea Tonnes Cash Costsb production guidance and Candelaria (80%) 135,000 – 140,000 $1.35/lb lowering copper cost outlook Eagle 20,000 – 23,000 Neves-Corvo 50,000 – 55,000 $1.55/lb • Zinkgruvan outperforming, C

  9. Slide 9: Operational Overview and Outlook

    Operational Overview and Outlook Candelaria (80%) Neves-Corvo (100%) Eagle (100%) Zinkgruvan (100%) Tenke Fungurume Aguablanca (100%) (24%) 9

  10. Slide 10: Candelaria (Cu/Au/Ag), Chile

    Candelaria (Cu/Au/Ag), Chile Atacama Province, Region III, approximately 20 km south of Copiapó 10

  11. Slide 11: Candelaria Q2 2015 Results and Outlook

    Candelaria Q2 2015 Results and Outlook • Production (100% basis) of 46.7 kt exceeded Location Chile expectations as a result of higher Ownership 80% throughput and recoveries 2015 Production 135,000-140,000 t Cu • Cash costs averaged $1.21/lb due to lower Guidance (80%) mine/mill costs, FX and highe

  12. Slide 12: Candelaria New Mine Plan

    Candelaria New Mine Plan • Improved production and operating cost profile expected Production & C1 Costs: 2016E 2017E 2018E 2019E over next 5 years Copper Production kt 154 156 144 161 Cash Costs $/lb Cu 1.58 1.57 1.82 1.71 • Annual Cu production for 2016- (after precious metal stream) 2019 expected

  13. Slide 13: Eagle Mine (Ni/Cu), Michigan, U.S.A.

    Eagle Mine (Ni/Cu), Michigan, U.S.A. 50 km northwest of Marquette in the Upper Peninsula of Michigan 13

  14. Slide 14: Eagle Q2 2015 Results and Outlook

    Eagle Q2 2015 Results and Outlook • Nickel production of 6.3 kt in-line, with Location Michigan, USA slightly lower throughput offset by Ownership 100% higher recoveries 2015 25,000–28,000 t Ni • Copper production of 5.4 kt benefitted Production Guidance 20,000–23,000 t Cu from higher grades and rec

  15. Slide 15: Neves-Corvo (Cu/Zn), Portugal

    Neves-Corvo (Cu/Zn), Portugal Situated 220 km southeast of Lisbon 15

  16. Slide 16: Neves-Corvo Q2 2015 Results and Outlook

    Neves-Corvo Q2 2015 Results and Outlook • Strong copper production (15.3 kt) Location Portugal reflects higher throughput and grades Ownership 100% 50,000–55,000 t Cu › Increased use of productive bulk 2015 Production 60,000–65,000 t Zn Guidance mining method resulted in more 4,000-5,000 t Pb copper

  17. Slide 17: Zinc Expansion Project – Neves-Corvo

    Zinc Expansion Project – Neves-Corvo • Feasibility Study for expansion of zinc substantially complete • Scope covers underground development of lower Lombador Zn deposits › Expansion of shaft capacity to 5.6 Mtpa › Zinc plant expansion to 2.5 Mtpa of ore throughput › Maximum zinc production nominall

  18. Slide 18: Zinkgruvan (Zn/Pb/Cu), Sweden

    Zinkgruvan (Zn/Pb/Cu), Sweden Situated 200 km southwest of Stockholm 18

  19. Slide 19: Zinkgruvan Q2 2015 Results and Outlook

    Zinkgruvan Q2 2015 Results and Outlook • Zinc production of 21.2 kt strong due to Location Sweden higher grades and recoveries Ownership 100% 80,000–85,000 t Zn › Record amount of ore mined 2015 Production 30,000–33,000 t Pb Guidance 2,000–3,000 t Cu • Lead production of 7.4 kt was impacted 2015 Cos

  20. Slide 20: Aguablanca (Ni/Cu), Spain

    Aguablanca (Ni/Cu), Spain Situated 80 km north of Seville 20

  21. Slide 21: Aguablanca Q2 2015 Results and Outlook

    Aguablanca Q2 2015 Results and Outlook • Nickel production (2.2 kt) and copper Location Spain production (2.0 kt) benefitted from Ownership 100% higher grades – outperforming YTD 2015 Production 7,000–7,500 t Ni Guidance 5,500–6,000 t Cu • Open pit mining completed in April, 2015 Cost Guidance $3.75

  22. Slide 22: Tenke Fungurume (Cu/Co), DRC

    Tenke Fungurume (Cu/Co), DRC Situated 175 km northwest of Lubumbashi 22

  23. Slide 23: Tenke Q2 2015 Results and Outlook

    Tenke Q2 2015 Results and Outlook • Copper production (100% basis) of Location Democratic Republic 52.3 kt was stronger due to higher of Congo throughput and recoveries Ownership 24% 2015 Production Guidance 50,000 t Cu • Cobalt production of 4.1 kt (attributable share) benefitted from higher grades

  24. Slide 24: Well Positioned in Any Market

    Well Positioned in Any Market  High quality, diversified asset base  Diversified metals exposure  Meaningful production scale  Strong free cash flow and good margins  Conservative balance sheet 24

  25. Slide 25: TSX: LUN OMX: LUMI

    TSX: LUN OMX: LUMI