Barrick Mining Corporation · TSX:ABX
Barrick Mining — Scotiabank Mining Conference 2013
20 slides from Barrick Mining's conference presentation, Dec 3, 2013
Slide 1: Scotiabank Mining Conference
Scotiabank Mining Conference December 3, 2013 1
Slide 2: Cautionary Statement on Forward-Looking Information
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance constitutes "forward-looking statements”. All statements, ot
Slide 3: Barrick at a Glance
Barrick at a Glance Pascua-Lama suspension reduces Capital 2014 capex guidance by up to $1B discipline Optimizing portfolio: ~$700M of non-core asset sales to date in 2013 +55% of 2013 production from 5 large High quality mines at AISC of ~$700/oz assets Lowest all-in sustaining costs of senior prod
Slide 4: High Quality Portfolio
High Quality Portfolio 5 mines contributed ~55% of production in first nine months 2013 at AISC of ~$660/oz(1) 9 months ended Sept. 30, 2013 CORTEZ GOLDSTRIKE LAGUNAS NORTE VELADERO PUEBLO VIEJO TOTAL/AVG Production(2) 1,093 Koz 650 Koz 411 Koz 499 Koz 331 Koz 2,984 Koz AISC $416/oz $955/oz $633/o
Slide 5: Pueblo Viejo: Ramping Up
Pueblo Viejo: Ramping Up 2013E production: ~500koz(1,2) at AISC of $700-$750/oz(2) Power plant commissioned in Q3 on schedule Full capacity expected in H1 2014 Revised SLA finalized and ratified by Congress (1) Barrick’s 60% share. (2) Actual results will vary depending on how the ramp up pr
Slide 6: Plans to Maximize Cash Flow
Plans to Maximize Cash Flow ASSET THIRD QUARTER 2013 PROGRESS Bald Mountain Implementing mine plan changes Yilgarn South mines Sold Plutonic Sale process underway for Plutonic and Kanowna Pierina Initiated closure Deferred open pit expansion; evaluating changes to Hemlo underground mine pl
Slide 7: Pascua-Lama: Decision to Suspend
Pascua-Lama: Decision to Suspend Decision to suspend in light of: – prolonged lower metal prices – continued uncertainty and risks facing the project today A new phased approach to development Aligns with disciplined capital allocation framework and improves near term cash flow – 2014 capex gu
Slide 8: Pascua-Lama: Phased Approach
Pascua-Lama: Phased Approach To resume construction under a phased approach when conditions warrant Benefits: Synchronize Renegotiate Further spending More Improved contracts life-of-mine with permit flexibility cost control and reduce plan approvals overhead optimization More information/clarit
Slide 9: Pascua-Lama: Ramp-down
Pascua-Lama: Ramp-down Ramp-down to be carried out for an efficient re-start when conditions warrant 2014 estimated costs of $0.25-$0.30B(1) Actual 2014 expenditures will be dependent on a number of factors, including regulatory requirements (1) ~50% expected to be capitalized 9
Slide 10: Third Quarter Results
Third Quarter Results Adjusted net earnings of Gold AISC(1) ($US/oz) Copper C1 Costs(1) ($US/lb) $0.58B ($0.58/sh)(1) 1,010 2.01 -9% Net earnings of $0.17B ($0.17/sh) -16% Operating cash flow (OCF) of $1.23B 916 Adjusted OCF of $1.30B(1) 1.69 Gold production of 1.85 Moz Copper production
Slide 11: 2013 Guidance Improvements
2013 Guidance Improvements Gold AISC(1) ($/oz) Gold Adjusted Total Capex(1) ($B) Operating Costs(1,2) 1,000- ~11% ($/oz) 1,100 900- 975 5.7- ~21% 6.3 ~7% 4.5- 5.0 610- 660 575- 600 Original Current Original Current Original Current 400 400 2.0 (1) Percentages calculated based on mid-point of guidanc
Slide 12: Lowest Cost Senior Producer
Lowest Cost Senior Producer 2013e All-In Sustaining Costs (US$/oz) Senior Peers Weighted Avg(1) 1,150-1,225 Barrick High quality portfolio 900-975 Successful cost reduction and portfolio optimization efforts 500 (1) See final slide #2. 12
Slide 13: Lumwana Performance Improvements
Lumwana Performance Improvements 193 Mlbs of copper Production (Mlb) C1 Costs ($/lb) 80 $4.00 production in first nine New mine plan months of 2013 adopted 70 $3.50 – C1 cash costs: $2.34/lb – C3 fully allocated costs: 60 $3.00 $3.04/lb(1) New leadership appointed Significant cost reductions: 50
Slide 14: Improved 2013 Copper Guidance
Improved 2013 Copper Guidance Production(1) (Mlbs) C1 Cash Costs(1) C3 Fully Allocated ($US/lb) Costs(1) ($US/lb) 520- ~8% ~5% 550 2.60- 2.85 480- 2.40- 540 2.60 ~11% 2.10- 2.30 1.90- 2.00 Original Current Original Current Original Current 400 1.0 1.0 (1) Percentages calculated based on mid-point of
Slide 15: Cost Reduction Initiatives
Cost Reduction Initiatives Total annual savings target − $500M Annual Savings Targets ($M) Cost reduction programs well 500 underway All costs under review 150 Specific savings targets established Majority of 1,850 identified positions eliminated 250 New operating model being phased in Focus
Slide 16: New Operating Reporting Structure
New Operating Reporting Structure COO Lagunas Pueblo North Australia Global Veladero Goldstrike America Cortez Pacific Norte Viejo JV Copper Oper. Head Oper. Head 7 Other 5 Other 2 Copper Mines Mines(1) Mines Core mines will report directly to COO Brings senior management closer to mines Allow
Slide 17: Financial Position and Liquidity
Financial Position and Liquidity Generated $3.2B of operating cash flow in first nine months of 2013 ~$2.0B of reductions to 2013 budgeted costs and capex; $0.5B of targeted future annual cost savings $4.0B undrawn credit facility extended to 2019 Lower 2014 cash outlay for Pascua-Lama Ter
Slide 18: Improved Financial Flexibility
Improved Financial Flexibility Reduces net debt by ~21%(1) Eliminates ~$2.5B of debt repayments over next 5 years Post-Offering Scheduled Debt Repayments(2) 7.0 6.0 5.0 4.0 $0.8B 3.0 2.0 $0.2B 1.0 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023+ (1) Based on debt outstanding as of Sept. 30,
Slide 19: Barrick's Framework for Returns
Barrick’s Framework for Returns Disciplined Capital Allocation 2014 capex guidance reduced by up to $1B with Pascua-Lama suspension Portfolio optimization: non-core asset sales High Quality Asset Base 5 mines to contribute ~55% of production at AISC of ~$700/oz in 2013E On track with 2013E p
Slide 20: Footnotes
Footnotes 1. Adjusted net earnings, adjusted net earnings per share, adjusted operating cash flow, all-in sustaining costs per ounce (“AISC”), adjusted operating costs per ounce, C1 cash costs per pound and C3 fully allocated cash costs per pound are non-GAAP financial performance measures with no s