Slide 1: Developing the World's Next Great Copper-Gold Mine
AN HOE Developing the World's Next Great per-Gold Mine www.ivanhoemines.com
Slide 2: Forward-looking statements
Forward-looking statements This presentation includes certain “forward-looking statements.” All statements, other than statements of historical fact, are forward-looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate and a
Slide 3: Ivanhoe already is an international miner
Ivanhoe already is an international miner ¾ Annual revenues of approximately US$100 million. ¾ Expanding copper production from Monywa joint venture in Myanmar. ¾ Iron ore production from Savage River mine in Australia. • (Both mines are generating strong positive cash flow) ¾ Developing the world-s
Slide 4: Financial and operating highlights
Financial and operating highlights First nine months of 2004 • Revenue – US$88.8 million • Operating profit – US$19.2 million • Exploration expenses – US$73.9 million Operating Projections • 2004E Copper production – 35.2 million pounds • 2004E Iron Ore production – 2.3 million tonnes
Slide 5: Operations
Operations Monywa Copper Savage River Project JV Iron Ore Project • Operations are cash-flow positive on backs of strong performance and commodity prices. • Both projects have operating costs within the lowest quartile of comparable operations by other companies.
Slide 6: Monywa Copper Project, Myanmar
Monywa Copper Project, Myanmar Phase 1 S&K Mine: Crusher, Sabetaung pit & leach pads
Slide 7: Monywa's total measured, indicated & inferred resource
Monywa’s total measured, indicated & inferred resource: 1.3 billion tonnes (0.15% cut-off) containing 11.5 billion pounds of copper • Cathode copper production expanding to 39,000 tonnes/year in Q4 of 2004. • Projected cash flow @ $1.20/lb.: approx. US$60 million/year. • Significant production expan
Slide 8: New high-grade zone at Monywa's Sabetaung Pit
New high-grade zone at Monywa’s Sabetaung Pit estimated to contain 240,000 tonnes grading 18.7% copper Core from high-grade zone, Sabetaung − 31% copper
Slide 9: Monywa's growth plan will make it Asia's largest SX-EW copper producer
Monywa’s growth plan will make it Asia’s largest SX-EW copper producer Revised 4-year annual copper target now 200,000 tonnes • Approx. 50,000 to 80,000 tonnes from the Sabetaung and Kyisintaung (S&K) deposits; PLUS • 125,000 to 150,000 tonnes from the Letpadaung deposit. Fast-track financing option
Slide 10: "We're making money in the copper business now in Myanmar"
“We’re making money in the copper business now in Myanmar” – Robert Friedland, Chairman, Ivanhoe Mines, August 16, 2004 We’re one of the world’s lowest-cost primary copper producers. We engineered, designed, constructed and financed (the S&K Mine) with Asian money and now we’re just going to do it i
Slide 11: Savage River Iron Ore Mine
Savage River Iron Ore Mine • Q3, 2004 ― operating profit from the Savage River Project totalled $1.5 million, compared to an operating profit of $0.8 million in Q3, 2003. • Total pellet production for 2004 estimated to be approximately 2.3 million tonnes.
Slide 12: Developing the World's Next Great Copper-Gold Mine – Oyu Tolgoi
Developing the World’s Next Great Copper-Gold Mine ― Oyu Tolgoi ― In Mongolia’s South Gobi
Slide 13: MONGOLIA: Asia's new mineral trove
MONGOLIA: Asia’s new mineral trove
Slide 14: "Oyu Tolgoi is the largest greenfields copper development in the world"
“Oyu Tolgoi is the largest greenfields copper development in the world. And it gets bigger every day” ― Robert Friedland, Chairman, Ivanhoe Mines, August 16, 2004 I don’t know of any mining enterprise that has delineated a resource this large, from initial discovery to measured and indicated resourc
Slide 15: The New York Times: Finding a Mother Lode in Mongolia
...560 billion worth of copper and gold, one of the five largest copper deposits known in the world. | THURSDAY, OCTOBER 14, 2004 Ehe New York Eimes World Business Finding a Mother Lode in Mongolia Close to Mineral-Hungry China, Big Veins of Copper and Gold By JAMES BROOKE YU TOLGOI, Mongolia -- In
Slide 16: Financial Times: Ivanhoe puts Mongolia on mining map
FINANCIAL TIMES :tonvon Ivanhoe puts Mongolia on mining map Flamboyant chairman Robert Friedland has plans for a US$1bn gold and copper mine in the Gobi Desert. Sweeping his arms over a giant map of Mongolia in his Ulan Bator office, Rob- ert Friedland barely pauses for breath as he reels off a voll
Slide 17: Ivanhoe's Gobi discovery hub puts Mongolian mining on world stage
Ivanhoe’s Gobi discovery hub puts Mongolian mining on world stage 2001 Discovery base camp… …three years later: 2004 Oyu Tolgoi City, South Gobi, Mongolia.
Slide 18: A growing 5.6-km 'string of pearls'
A growing 5.6-km ‘string of pearls’ Hugo North SOUTHERN OYU DEPOSITS HUGO DUMMETT DEPOSIT Measured & Indicated Resource* Inferred Resource* 1.06 billion tonnes @ 0.48% Cu / 0.36 g/t Au 1.16 billion tonnes @ 1.29% Cu / 0.23 g/t Au • 11.2 billion pounds of copper • 33 billion pounds of copper • 12.4 m
Slide 19: Hugo North now the world's highest-grade copper porphyry deposit
Hugo North now the world’s highest-grade copper porphyry deposit
Slide 20: Among the world's highest-grade copper and gold deposits
Copper Equivalent G rade (%) 0.0% 0.2% 0.4% 0.6% 0.8% 1.0% 1.2% 1.4% 1.6% Cadia Hill Batu Hijau Pelambres Collahuasi Veladero Alumbrera Escondida Spence Resource Copper Equivalent Grade Telfer Among the world’s Sossego Pascua O yu Tolgoi G rasberg highest-grade copper and gold deposits
Slide 21: Oyu Tolgoi Project (August 2004)
Oyu Tolgoi Project (August 2004) Current mine-planning resource
Slide 22: Headframe on bulk-sampling shaft
November 2004: Headframe on bulk-sampling shaft into Southwest Oyu deposit
Slide 23: Building a cash-flow engine
Building a cash-flow engine • Initial mining rate of 70,000 – 90,000 tpd in open pit could generate production in excess of 500,000 ounces of gold and 350 to 450 million pounds of copper. o Annual revenues projected to be in the range of $550 to $650 million. • Subsequent development of Hugo block c
Slide 24: Milestones
MILESTONES • Stability agreement o sets fiscal parameters as well as clarifying permitting issues such as land use, water, import of power. • Infrastructure development o access to power, transportation and labour. • Feasibility studies • Ongoing financing • Management in place • Commodity price sta
Slide 25: Technical Summary
Technical Summary Major mine in a world league • President John Macken is leading team of Ivanhoe Mines’ staff and consultants conducting a feasibility study on open-pit operations and a pre-feasibility study on underground options. • Integrated mine development study (open pit and underground) due
Slide 26: Road and rail links – present & future
Road and rail links – present & future
Slide 27: China/Mongolia infrastructure pact
China/Mongolia infrastructure pact June 2003 Mongolia-China Presidents’ Summit agreed to major investments to develop Mongolia’s resources. • China pledged US$300 million for highway and rail links with Mongolia’s South Gobi and other border regions. • Ivanhoe’s Oyu Tolgoi copper and gold will help
Slide 28: Road transport options
Road transport options CONCENTRATE ROAD TRAIN, AUSTRALIA NEWLY UPGRADED HIGHWAY IN CHINA CONNECTS MONGOLIA’S GOBI REGION TO CHINA’S ROAD AND RAIL NETWORKS
Slide 29: Cross-border highway connections
Cross-border highway connections
Slide 30: Mongolia-China trade booms at border
Mongolia-China trade booms at border Busy Mongolia-China border crossing at Gashuun Suhait, 80 kilometres (50 miles) southeast of Ivanhoe’s Oyu Tolgoi mine project. Crossing, opened in 1991, is one of Mongolia’s major export corridors.
Slide 31: Mongolian scrap feeds China's furnaces
Mongolian scrap feeds China’s furnaces Up to 1,000 trucks carrying scrap bound for steel mills as close as Baotou, in China’s northern industrial belt, crossed the South Gobi border at Gashuun Suhait in April, 2004.
Slide 32: Power: Mongolia is the Saudi Arabia of steam and met. coal
POWER Mongolia is the Saudi Arabia of steam and met. coal Coal mining at Tavan Tolgoi, 130 km northwest of Ivanhoe’s Oyu Tolgoi
Slide 33: Ivanhoe holds coal rights adjoining Nariin Sukhait coal mine
Ivanhoe holds coal rights on block adjoining Nariin Sukhait coal mine in South Gobi
Slide 34: Nariin Sukhait coal mine in South Gobi
Nariin Sukhait coal mine in South Gobi
Slide 35: Water
WATER • Large-volume storage aquifers identified. • Program of sustained pump tests underway. • Separate, secure supplies assured for Gobi residents and livestock.
Slide 36: Model of bedrock topography shows potential water supply reservoirs
Model of bedrock topography shows potential water supply reservoirs under Gobi
Slide 37: Artesian wells drilled by Ivanhoe
Artesian wells drilled by Ivanhoe in vicinity of Oyu Tolgoi
Slide 38: Commercial Challenges
Commercial Challenges • Discussions continuing with potential industry and financial partners to provide project financing. • Potential partners include consortiums of end-users/off-take buyers, mining companies and financial groups. • Development of Oyu Tolgoi – and related infrastructure. • Oyu To
Slide 39: "There are enormous quantities of Asian capital looking to finance Oyu Tolgoi"
“There are enormous quantities of Asian capital looking to finance Oyu Tolgoi” ― Robert Friedland, Chairman, Ivanhoe Mines, August 16, 2004 We are playing primarily with the consumers of copper metal to be financed rather than the producers. But we’re not ignoring some very interesting discussions w
Slide 40: Why are consumers of copper interested in Oyu Tolgoi?
Why are consumers of copper interested in Oyu Tolgoi? Ask Toyota: its hot-selling Prius hybrid gasoline-electric car contains about 100 lbs. of copper – twice as much as a gasoline-engined Toyota Corolla.
Slide 41: Toyota Prius taxi covered 332,000 KM
Toyota Prius taxi covered 332,000 KM (207,000 miles) in 14 months in Vancouver, Canada – with flawless running of hybrid gasoline- electric powertrain.
Slide 42: Mongolia's political leaders have expressed welcome support
Mongolia’s political leaders have expressed welcome support for Oyu Tolgoi • Late-stage negotiations are continuing with a formally designated working group of the Mongolian government for a long-term stability agreement • Agreement is expected to establish the critical terms and conditions that wil
Slide 43: Building relationships in China
Building relationships in China Chinese Premier Wen Jiabao was formerly an exploration geologist who spent 30 years searching for nickel and copper in Inner Mongolia and Gansu Province.
Slide 44: Ivanhoe/CITIC alliance
Ivanhoe/CITIC alliance — April 23, 2003 Central Oyu Chalcocite Blanket Wang Jun, Chairman of CITIC, and Robert Friedland, Chairman of Ivanhoe Mines, form a strategic alliance in mineral exploration, development and production throughout the world.
Slide 45: "Rome wasn't built in a day ― and neither was Grasberg"
“Rome wasn’t built in a day ― and neither was Grasberg” ― Robert Friedland, Chairman, Ivanhoe Mines, August 16, 2004 We’re not in a race. We’re in a long-term effort to get it right. What is very important is that the right people and the right financial package and the right governmental structure,
Slide 46: Enhancing Value
ENHANCING VALUE 1. Development of currently-owned assets. 2. Greenfields exploration. ¾ Bakyrchik Gold Mine, Kazakhstan • Large underground gold resource. • 43-101 Scoping Study completed. • Exploring options to maximize value o Initial public offering o Joint venture Bakyrchik’s gold resource o Sal
Slide 47: Bakyrchik Gold Mine, Kazakhstan
Bakyrchik Gold Mine, Kazakhstan • Total measured, indicated & inferred resource: 62.5 million tonnes @ 6.6 grams/tonne gold based on a 3 g/t gold cut-off. • Estimated contained gold: 13.2 million ounces. • New mining scoping study completed January, 2004, by Aker Kvaerner E&C. • Ivanhoe holds 70% st
Slide 48: Bakyrchik's estimated operating parameters
Bakyrchik’s estimated operating parameters • Average annual gold production: 180,000 ounces. • Total ore production: 24 million tonnes at 8.0 g/t gold. • Average operating unit cost: US$182 per ounce. • Metallurgical recovery: 86% for rotary kiln roasting.
Slide 49: Cloncurry Copper Project, Australia
Cloncurry Copper Project, Australia • Ivanhoe acquired Cloncurry copper-gold mining and exploration leases, 160 km southeast of Mount Isa, a major regional mining centre in northwestern Queensland, Australia, in September, 2003. • Substantial existing resource of 75 million tonnes grading 0.52% copp
Slide 50: Cloncurry's Mt. Dore Deposit, NW Queensland
Cloncurry’s Mt. Dore Deposit, NW Queensland Chalcocite Cuprite Chrysocolla in breccias 50 km
Slide 51: Cracking rocks to find the future in the past
Cracking rocks to find the future in the past “Somebody has to go out in the dark and cold in the far regions of the earth and actually crack the rocks and discover what’s there.” ― Robert Friedland, Chairman, Ivanhoe Mines
Slide 52: International discovery of the year
International discovery of the year Ivanhoe’s geologists who found the Hugo Dummett copper-gold deposit at Oyu Tolgoi received the PDAC’s inaugural Thayer Lindsley award for the international discovery of the year at North America’s largest mining conference in Toronto, March, 2004
Slide 53: Tien Shan Belt's exploration potential
Tien Shan Belt’s exploration potential Southern Tien Shan Northern and middle Tien Shan Boroo Major mesothermal-type gold deposits 10.7 Mt at 3.3 g/t Au in production or development Erdenet 1.78 Bt at 0.62% Cu 0 250 500 km Other significant gold deposits and 0.025% Mo Taseevskoye-Baley Porphyry Copp
Slide 54: New Horizons for exploration (Mongolia and China)
New Horizons for exploration (Mongolia and China)
Slide 55: Inner Mongolia region of China
Inner Mongolia region of China • Ivanhoe is continuing its extensive reconnaissance programs to identify high-priority targets. • Ivanhoe has obtained business licences for two Inner Mongolia joint ventures. Both ventures will focus on exploring for, and developing, gold, copper, silver, molybdenum
Slide 56: Defining value. Delivering on commitments.
Defining value. Delivering on commitments. • World-scale, long-life mining projects in Mongolia and Myanmar. • Positioned to be a key supplier of metals to China and other Asian economic powerhouses for many years to come. • Decades of Asian experience and unique exploration “know how” being used in
Slide 57: Shares outstanding and market capitalization
November 23, 2004 Shares outstanding 292 Million Current Price C$ 8.50 / US$ 7.18 Market capitalization C$ 2.5 Billion US$ 2.1 Billion 52-week range C$ 12.66 / C$ 4.85 TSX & ASX - IVN NASDAQ - HUGO
Slide 58: ivanhoemines.com
ivanhoemines.com
Ivanhoe Mines — Investor Presentation (November 2004) on 6ix