Vestas Wind Systems A/S · OMXCOP:VWS

Vestas Wind Systems A/S — Q3 2004 Earnings Presentation

8 slides from Vestas Wind Systems A/S's earnings presentation, Nov 26, 2004

  1. Slide 1: 3rd Quarter Information 2004

    Slide 1: 3rd Quarter Information 2004

    3rd Quarter Information 2004 Vestas Wind Systems A/S 26 November, 2004

  2. Slide 2: Market situation

    Slide 2: Market situation

    Market situation • Continued positive expectations for the global market for wind power • USA – PTC extended • PTC-extension – end 2005 • Growth at a slower pace • Weak USD exchange rate • Increasing steel prices • Canada – stable growth • Political initiatives support stable growth • Continuously,

  3. Slide 3: Market situation (2)

    Slide 3: Market situation (2)

    Market situation (2) • The European markets are still dominated by Germany and Spain • Germany – decreasing market size in 2004 • Authorisation procedures more complex and time consuming • Pressure on the installation capacity during fourth quarter 2004 • Increasing risk of projects being postponed

  4. Slide 4: Market situation (3)

    Slide 4: Market situation (3)

    Market situation (3) • Great Britain • Continued positive outlook • Vestas is supplier for the first four large offshore projects • 30 V80’s at North Hoyle and at Scroby Sands • 30 V90’s at Kentish Flats and at Barrow • Other European markets • Two new Danish offshore projects each of 200 MW • Posit

  5. Slide 5: Market situation (4)

    Slide 5: Market situation (4)

    Market situation (4) • Oceania and Asia • Growth prospects remain positive • Continued strong focus on renewable energy in Australia, China and India • Large projects in Australia awarded to Vestas • Larger projects starting to materialise in China • India is the fastest growing market in 2004 • In

  6. Slide 6: Products and production

    Slide 6: Products and production

    Products and production • Technological leadership • V90-2.0 MW – a winner on low and medium wind sites • V100-3.0 MW prototype installed • Further development of the NM110-4.2 MW into V120- 4.5 MW • Strong focus on global sourcing and production • Lowering the dependency on the USD and AUD exchange

  7. Slide 7: Vestas' expectations

    Slide 7: Vestas' expectations

    Vestas’ expectations • 2004 – expectations maintained • Turnover of approximately bnEUR 2.6 • EBIT-margin* of approximately 4% after integration and restructuring costs • Net working capital below 35% by the end of 2004 • 2005 – increased price competition • Declining USD exchange rate in combinatio

  8. Slide 8: With quality and care we use the wind to create competitive, clean and renewable energy

    Slide 8: With quality and care we use the wind to create competitive, clean and renewable energy

    With quality and care we use the wind to create competitive, clean and renewable energy With quality and care we use the wind to create Withcompetitive, quality and care cleanwe use and the wind energy renewable to create competitive, clean and renewable energy 8

Source: Internet Archive copy of vestas.com

More decks from Vestas Wind Systems A/S

All 118 Vestas Wind Systems A/S decks