Vior Gold Corporation Inc. · TSXV:VIO

Vior Gold — Investor Presentation (February 2026)

20 slides from Vior Gold's investor presentation, February 2026

  1. Slide 1: Corporate Presentation February 2026

    CORPORATE PRESENTATION February 2026 TSXV: VIO ∙ OTCQB: VIORF ∙ FRANKFURT: VL5 1

  2. Slide 2: Forward-Looking Statements & Technical Content

    FORWARD-LOOKING STATEMENTS & Technical Content Statements in this document, to the extent not based on historical events, constitute forward-looking statements. Forward-looking statements include, without limitation, statements evaluating market and general economic conditions in the following secti

  3. Slide 3: Unlocking Value Through Discoveries

    c AN 4g BA UNLOCKING VALUE THROUGH DISCOVERIES

  4. Slide 4: Ligneris Project Highlights & Opportunities

    LIGNERIS PROJECT Highlights & Opportunities • 379 claims covering > 200 km2 • Excellent location and low-cost exploration. • Located 100 km NE of Rouyn-Noranda, Québec. • Orogenic Au and Gold-rich polymetallic VMS- related showings (Bousquet-LaRonde type deposits) untested at depth and along strike.

  5. Slide 5: Ligneris Historical Drilling Results

    LIGNERIS Historical Drilling Results • Economical drilling intercepts that includes 13.5 g/t Au over 10.6 m. • Very little work carried out oustide known areas. • North and Central zones are dominated by Au-quartz veins (structurally controlled). • South Zone shows similarities with Au-VMS type depo

  6. Slide 6: Comparison with Doyon-Bousquet-LaRonde Camp

    COMPARISON WITH DOYON-BOUSQUET-LARONDE CAMP Composite longitudinal view (looking north) of the Doyon-Bousquet-LaRonde mining camp. The outlines of zones and lenses include production, reserves, and resources, including some historical, non-NI 6 43-101 compliant reserves and resources ( Modified from

  7. Slide 7: Ligneris Project – Long Sections

    LIGNERIS PROJECT – LONG SECTIONS 7

  8. Slide 8: Ligneris Project

    LIGNERIS PROJECT 7 North Zone fon g/t Au over 1.8 m (275-037) ee .0 g/t Au over 0.6 m (275-278) | eae A Central Zone =] 0.91 g/t Au over 24.9 m including | 5.72 g/t Au over 3.4m (275-053) 4.92 g/t Au over 5.4m (L-84-4) Se / South Zone; 515 g/t Au over 5.9 m {LS-05) Géologie d’aprés le SIGEOM Voleani

  9. Slide 9: Belleterre Project Highlights & Opportunities

    BELLETERRE PROJECT Highlights & Opportunities • 1,225 claims covering > 680 km2 • Historic high-grade Belleterre mine produced over 750,000 oz Au at 10.7 g/t (MERN). • Gold system untested at depth and along strike. • Excellent location and low-cost exploration. • District scale with multi-deposit p

  10. Slide 10: Belleterre Mine

    BELLETERRE MINE From 1939 to 1957, Belleterre Mine produced 2.18 M tons @ 10.73 g/t Au (~750,000 oz Au) 10

  11. Slide 11: Belleterre Project District-Scale Gold Project

    BELLETERRE PROJECT DISTRICT-SCALE GOLD PROJECT 1,225 claims over 700 km2 11

  12. Slide 12: Belleterre Project Longitudinal Drilling Results

    BELLETERRE PROJECT Longitudinal - Drilling Results Vior Trace DDH Published results Historical Workings Épaisseur: 2500 m BV24-047 7.93 g/t Au over 0.5 m BV25-104 7.84 g/t Au over 1.5 m BV24-028 15.9 g/t Au over 1.2 m BV24-023 PAQUIN ZONE 6.75 g/t Au over 1.6 m CONWAY ZONE AUBELLE ZONE BELLETERRE MI

  13. Slide 13: Belleterre Mine Trend

    BV25-076 BV25-073 5.01 g/t Au HOSKIN ZONE 11.6 g/t Au over 0.5 m over 0.3 m BV24-033 BV25-088 BELLETERRE MINE TREND BV25-085 6.6 g/t Au BV25-143 27.5 g/t Au 4.76 g/t Au over 3. 0m 3.0 g/t Au over 4.3 m over 0.5 m over 2.6 m Including including Plan Map - Assay Results 23.5 g/t Au 21.9 g/t Au over 0.

  14. Slide 14: New Mineralization Style

    NEW MINERALIZATION STYLE Mineralization Associated with the Devlin Intrusion (Conway area) Disseminated Pyrite in felsic intrusive BV24-035 – 0.435 g/t Au over 34 m rock croscutted by Qtz Vn 14 BV24-035 – 10.35 g/t Au over 1.2 m

  15. Slide 15: Belleterre Project Next Phase of Drilling

    BELLETERRE PROJECT Next Phase of Drilling 15

  16. Slide 16: Corporate Profile

    CORPORATE PROFILE BOARD OF DIRECTORS MANAGEMENT MATHIEU SAVARD CHARLES-OLIVIER TARTE MATHIEU SAVARD, President & CEO President & CEO PASCAL SIMARD, Vice President Exploration INGRID MARTIN, Chief Financial Officer SHAYAAN BELLUZZO, Corporate Secretary MARK FEDOSIEWICH ANDRE LE BEL Chairman TECHNICAL

  17. Slide 17: Corporate Structure

    CORPORATE STRUCTURE + WORKING CAPITAL $46M(1) Adjusted Working Capital 415M Shares Outstanding $49.8M Market Capitalization ($0.12/share) Note 1: : The "adjusted working capital“ on September 30, 2025 is a non-IFRS measure that includes cash and non-current investments (GIC ) and excludes listed sha

  18. Slide 18: Corporate Profile

    SAFE JURISDICTION TEAM WITH PROVEN Québec TRACK RECORD Amongst world’s top mining Management and Technical Team jurisdictions Track record of World Class Gold Discoveries CORPORATE PROFILE VALUE BASED ON STRONG FUNDAMENTALS Unlocking Value STRONG FINANCIALS AND DISTRICT SCALE Through Discoveries TEC

  19. Slide 19: 2026 Catalysts

    2026 CATALYSTS Unlocking Value Through Discoveries ✓ 20,000 metres of drilling at Ligneris. ✓ Completion of drilling program at Belleterre in Q1-2026. ✓ Addition of district scale projects to the portfolio. 19

  20. Slide 20: Contact Us

    vior.ca CONTACT US Mathieu Savard President and CEO msavard@vior.ca TSXV: VIO OTCQB: VIORF FRANKFURT: VL5 20

Vior Gold — Investor Presentation (February 2026) on 6ix