American Electric Power Company, Inc. · NASDAQ:AEP
American Electric Power — EEI International Utility Conference 2010
27 slides from American Electric Power's conference presentation, March 2010
Slide 1: European Investor Roadshow
European Investor Roadshow EEI International Utility Conference March 9-16, 2010 DC Cook Nuclear Plant (Michigan) 345-kV Transmission Line
Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995
“Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are
Slide 3: AEP Participants
AEP Participants Mike Morris – Chairman, President & CEO Brian Tierney – EVP and CFO Susan Tomasky – President, AEP Transmission Chuck Zebula – Treasurer & SVP Investor Relations 3
Slide 4: AEP Value Proposition
AEP Value Proposition Regulated Utility Platform ― Diversified service territory ― Successful regulatory track record ― Value compared to regulated peer group Earnings Growth Prospects ― Investment in utility platform greater than depreciation level (2 - 4%) ― With transmission opportunities (4
Slide 5: Highly Diversified Regulated Utility Platform
Highly Diversified Regulated Utility Platform 2009 Earnings Contribution Kentucky Public Power Service of Southwestern 2% Oklahoma Electric 5% Power Ohio 9% Power Texas 22% 7% All Others Columbus 6% Southern Power 20% Indiana & Michigan Appalachian 16% Power 13% 2009 Retail Load Fuel Mix** Wholesale
Slide 6: Transmission Investment Opportunities
Transmission Investment Opportunities ETT: Projects in Texas ERCOT jurisdiction ― $600MM of projects est. in service 2010- 2013 ― ETT’s opportunity could reach $3.0B in this decade Transco: Within our existing footprint ― Provides opportunity to: ― Develop new AEP-only projects ― Reduce regulatory l
Slide 7: JV Strategy – Nationwide Grid Expansion
JV Strategy – Nationwide Grid Expansion SPP ERCOT PJM PJM/MISO Prairie Wind COD: 2013-14 ETT COD: 2010-2017 PATH-WV COD: 2014 Pioneer COD: 2015 110 miles of 765 kV 345 kV ERCOT Expansion 275 miles of 765 kV 240 miles of 765 kV Partners: Westar (50%) & Electric Partner: MidAmerican Energy
Slide 8: A Portfolio Approach: AEP's Long-Term CO2 Reduction Commitment
A Portfolio Approach: AEP’s Long-Term CO2 Reduction Commitment Existing Programs New Additions (by 2012) — Existing Plant Efficiency Gains — 2000 MW Wind PPAs — Renewable Energy — Domestic Offsets — 1400 MW wind — Methane, Forestry — 300+ MW hydro — Fleet Vehicle/Aviation Offsets — Domestic Offsets
Slide 9: AEP Leadership in New Technology: Chilled Ammonia CCS
AEP Leadership in New Technology: Chilled Ammonia CCS Phase 1 Phase 2 Captured CO2 first time on Awarded $334MM DOE Funding; 09/01/09; Injected CO2 first Expected Commercial Operation: 2015 time on 10/1/2009 Chilled Ammonia Chilled Ammonia Mountaineer 20MWe scale Mountaineer ~235MWe scale Plant (WV)
Slide 10: AEP Renewable Footprint
AEP Renewable Footprint New 10 MW Solar PPA with juwi Solar Inc. Renewables Portfolio* Wind PSO – 5 PPAs 591MW SWEPCo – 1 PPA 79MW APCo – 4 PPAs 376MW I&M – 2 PPAs 150MW KPCo – 1 PPA 100MW AEP Ohio – 2 PPAs 110MW Total Regulated 1406MW AEPEP – owned 311MW AEPEP – 2 PPAs 177MW Non-regulated 487 MW Hy
Slide 11: AEP gridSMART Deployment Status
AEP gridSMART Deployment Status Indiana Michigan Power (AEP) – Implementation in process • 10,000 AMI pilot program (GE meters) • Distribution automation • Programmable communicating thermostats • Enhanced time-of-use tariffs • Customer web portal for monitoring & management AEP Ohio – APPROVED BY P
Slide 12: Utility Operations Capital Expenditures
Utility Operations Capital Expenditures $4,500 $3,914 $3,852 $4,000 AMI/gridSMART $28 $3,522 $3,500 Environm ental $994 $887 New Generation $3,000 $2,783 $1,366 $525 $2,393 Corporate/Other $ in millions $2,500 $891 $811 $149 $30 $90 Nuclear $146 $457 $2,044 $1,961 $2,000 $95 Generation $114 $133 $59
Slide 13: Multi-Year Capital Investment Funding Plan
Multi-Year Capital Investment Funding Plan Actual Projection 2009 2010 Capital Expenditures (Excluding AFUDC) $ (2,791) $ (2,310) Transmission Initiatives (JV Equity Contributions) (43) (89) Dividend on Common Stock (759) (786) Cash Sources (Uses) Cash from Operations 2,484 3,775 Proceeds from Sale
Slide 14: Traditional Rate Making Environment
Traditional Rate Making Environment Growth in Net PP&E Track Record of Rate Relief $40.0 $800 .9% Secured 6 Pending/Future $700 $35.0 R =~ $36.3 G $35.3 E CA $34.3 $600 PP& $33.0 011 $500 $ in billions $30.0 2 $ in millions - 2 005 $29.9 $400 $26.8 $320 $340 $25.0 $659 $300 $24.3 $527 $153 $450
Slide 15: Appendix
13 AMERICAN’ ELECTRIC POWER Append ix 15
Slide 16: 2010 Ongoing Earnings Guidance
2010 Ongoing Earnings Guidance 2009A: $2.97 2010E: $2.80-$3.20 Utility Operations $ 2.87 $ 3.01 Transmission Operations $ 0.01 $ 0.02 Nonutility Operations $ 0.19 $ 0.09 Parent & Other $(0.10) $(0.12) $2.97 0.45 $3.00 $3 0.29 (0.14) (0.17) (0.03) 0.12 (0.36) $2 • Other Revenue (0.13) • D&A • Other T
Slide 17: Detailed Ongoing Earnings Guidance
Detailed Ongoing Earnings Guidance 2009A: $2.97 American Electric Power 2010E: $2.80 - $3.20 2009 Actual vs. 2010 Guidance 2009 Actual 2010 Guidance Performance Driver ($ millions) Performance Driver ($ millions) UTILITY OPERATIONS: Gross Margin: 1 East Regulated Integrated Utilities 66,976 GWh @ $
Slide 18: Normalized Load Trends
Normalized Load Trends AEP Residential Normalized GWh Growth AEP Commercial Normalized GWh Growth %Change vs. Prior Year %Change vs. Prior Year 5% 5% 3% 1.1% 1.0% 2.4% 3% 0% 0% -3% -0.9% -0.7% -0.8% -0.7% -0.5% -0.8% -1.8% -1.4% -3% -1.3% -5% -5% -8% -8% -10% -10% 1Q09 2Q09 3Q09 4Q09 YTD09 2010E 1Q0
Slide 19: Additional 2010 Earnings Drivers
Additional 2010 Earnings Drivers 2010 Guidance: $2.80 - $3.20 O&M Assumptions Rate Relief Assumptions $23MM increase over 2009, net of $320MM, net of trackers revenue offsets $167MM secured Includes $80MM increase in AR, OH, OK, VA, WV employee and operational expenses Active or pending
Slide 20: Capitalization & Liquidity
Capitalization & Liquidity 70% Total Debt/Capitalization Current Liquidity Summary Liquidity Summary Actual 65% (unaudited) 12/31/09 62.5% ($ in millions) Amount Maturity 60.7% Revolving Credit Facility $1,500 Mar-11 60% 59.1% 59.1% Revolving Credit Facility 1,454 Apr-12 57.2% 57.2% Revolving Credit
Slide 21: AEP Credit Ratings
AEP Credit Ratings Current Ratings for AEP, Inc. & Subsidiaries Moody's S&P Fitch Senior Senior Senior Company Unsecured Outlook Unsecured Outlook Unsecured Outlook American Electric Power Company Inc. Baa2 N BBB S BBB S AEP, Inc. Short Term Rating P2 N A2 S F2 S AEP Texas Central Company Baa2 S BBB
Slide 22: Long-term Debt Maturity Profile
Long-term Debt Maturity Profile ($ in millions) Year 2010 2011 2012 AEP, Inc. $ 490 $ - $ - AEP Generating Company $ - $ 130 $ - Appalachian Power $ 200 $ 250 $ 250 Columbus Southern Power $ 150 $ - $ 45 Indiana Michigan Power $ - $ - $ 100 Kentucky Power $ - $ - $ - Ohio Power $ 679 $ - $ - Public
Slide 23: Summary Rate Case Information
Summary Rate Case Information APCo Virginia General Rate Case – Docket #PUE-2009-00030 On August 14, 2009, APCo filed an update to its pre-biennial base rate case, originally filed July 15, 2009 with the Virginia SCC, per the statute, for recovery of generation and distribution costs requesting an i
Slide 24: Summary Rate Case Information
Summary Rate Case Information SWEPCO Texas General Rate Case – Docket #37364 On August 28, 2009, SWEPCO filed a base rate case with the Public Utility Commission of Texas requesting an increase of $75 million to cover costs related to the construction of the Stall and Turk plants as well as enhanced
Slide 25: Summary Rate Case Information
Summary Rate Case Information Kentucky General Rate Case – Docket #2009-00459 On December 29, 2009, KPCo filed a base rate case with the Kentucky Public Service Commission requesting an increase of $123.6 million to cover costs related to enhanced distribution reliability spending, depreciation of c
Slide 26: Summary Rate Case Information
Summary Rate Case Information I&M Michigan General Rate Case – Docket #U-16180 On January 27, 2010, I&M filed a base rate case with the Michigan Public Service Commission requesting an increase of $62.5 million to cover increased costs related to distribution O&M, taxes, interest and employee relate
Slide 27: Coal Procurement – 2010 Projected
Coal Procurement – 2010 Projected AEP East Total AEP System Colorado/Utah 2% Illinois Basin 2% Central Northern Northern Appalachian Appalachia Powder River Appalachia Basin 26% 41% 33% 39% Illinois Basin 1% Powder River Basin Colorado/Utah 1% 29% Lignite 5% Central Appalachia AEP West 21% Lignite 2