European Resources Limited · ASX:ERE

European Resources — Prospech — Australian Minerals and Energy Investor Conference – Brisbane 2021

34 slides from European Resources's conference presentation, Mar 18, 2021

  1. Slide 1: Positioned for Outstanding Leverage to Gold & Silver Exploration Success

    PROSPECH LIMITED ABN 24 602 043 265 www.prospech.com.au Positioned for Outstanding Leverage to Gold & Silver Exploration Success within the World Class Tethyan Mineral Belt Australian Minerals and Energy Investor Conference – Brisbane 18 March 2021

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation also contains statistics, data and other information relating to markets, market sizes, market shares, market positions and other industry data pertaining to the Company's business and markets. Unless otherwise indicated, such information is based on the Company's analys

  3. Slide 3: Corporate & Capital Structure

    Corporate & Capital Structure Recent IPO: ASX PRS – Listed 16th December 2020. Raised $5m. $3.5m expenditure planned on drilling over next 2 years Shares on Issue: 88.3m Options on Issue: 17.0m Share Price: $0.135 Market Capitalisation (fully Dil.): $14.2m Enterprise Value:$9.2m Experienced Board &

  4. Slide 4: Key Investment Highlights

    Key Investment Highlights • Prospech owns 100% of 204km² of prospective, under explored gold and silver exploration licences • Located in the Tethyan magmatic arc in Slovakia • One of the most prolific global metal belts • Member of the EU and Eurozone - an attractive jurisdiction for foreign invest

  5. Slide 5: Projects Located Within the Tethyan Mineral Belt

    Disclaimer and Competent Person Statemen Projects Located Within the Prolifically Well Endowed Tethyan Mineral Belt 4

  6. Slide 6: Slovakia

    Disclaimer and Competent Person Statement Slovakia A favourable mining jurisdiction within a European Union legal, accounting and political framework ember ➢ Full European Union, EEC and NATO Member ➢ Fastest growing Eurozone member within the last 10 years ➢ Favourable central geographic location ➢

  7. Slide 7: Slovakia

    Disclaimer and Competent Person Statement Slovakia A favourable mining jurisdiction within a European Union legal, accounting and political frameworkember ➢ Known mining history dating to Celtic times and earlier ➢ Major production of metals (primarily copper and silver) occurred during the medieval

  8. Slide 8: Multiple Targets

    Multiple Targets Six 100% owned projects, Hodrusa-Hamre surrounding currently producing high-grade Rozalia Mine 7

  9. Slide 9: Exploration Update

    Naa Ee eee Exploration Update

  10. Slide 10: Zemplin Drilling March 16th 2021

    Drilling planned for 2021 and 2022 Zemplin Drilling March 16th 2021 • Zemplin Silver Base Metals (Cejkov Project) now and Anton gold silver zone (Hodrusa Project) next • 2021 program underway - drill testing multiple gold and silver targets for a minimum 10,000 metres • Drilling planned also on the

  11. Slide 11: Current Exploration Focus: Cejkov-Zemplin Silver Prospect, SE Slovakia

    Current Exploration Focus: Cejkov-Zemplin (“Zemplin”) Silver Prospect, SE Slovakia • New field season (northern hemisphere springtime) recently commenced • Drilling currently underway • Exploration success from first hole drilled : 3m intercept of massive & semi-massive sulphide (Galena rich) veinin

  12. Slide 12: Operations – Currently Drilling Zemplin Silver Base Metals Zone

    Operations – Currently Drilling Zemplin Silver Base Metals Zone 11 12

  13. Slide 13: Operations – Zemplin Silver Base Metals Zone – Plan View

    Operations – Currently Drilling Zemplin Silver Base Metals Zone – Plan View CZ series of three holes over 2019 Ionic Leach Soils sampling anomaly in background showing over 500m strike extent 12 13

  14. Slide 14: Operations – Currently Drilling Zemplin Silver Base Metals Zone

    Operations – Currently Drilling Zemplin Silver Base Metals Zone Significant zones intercepted in hanging and footwall as well as additional hanging wall and footwall zones 13

  15. Slide 15: Hodrusa-Hamre

    Disclaimer and Competent Person Statement Hodrusa-Hamre An underexplored historic multi-million ounce gold and silver field • Hodrusa-Hamre: Top Priority , Primary Exploration Focus • Underexplored: despite substantial historical production over 1,000 years producing an estimated 2.4 Moz Au and 120

  16. Slide 16: Hodrusa-Hamre

    Disclaimer and Competent Person Statement Hodrusa-Hamre An underexplored historic multi-million ounce gold and silver field 15

  17. Slide 17: Hodrusa-Hamre Project – Anton prospect – Next to drill in Pipeline

    Hodrusa-Hamre Project – Anton prospect- Next to drill in Pipeline • Targets preserved with water table noted to have stopped historic production • 17 rock chip samples averaged 8.6 g/t Au and 464 g/t Ag (up to 52.6 g/t Au) • No modern drilling • 20 drill pads permitted, 3D design check completed 16

  18. Slide 18: Drilling to continue while awaiting Zemplin Results – Anton Drill Plan

    Drilling to continue while awaiting Zemplin Results - Anton Drill Plan – High Grade Historic Zones sampled in situ Historical Mine Workings Permitted Drill Pads 5 17

  19. Slide 19: Prospech Growth Pathway – Use of Funds – March to December 2021 Onwards

    Prospech Growth Pathway – Use of Funds – March to December 2021 Onwards Drilling- Zemplin Ag (current) Drilling and Anton Au Ag resource model Krakauer Au Schopfer and LANF Ignac Bauch II Resource Drilling- Jasenie Zemplin Ag Bauch and Ignac III Au Drilling Hodrusa Drilling Ignac Drilling Bauch Scho

  20. Slide 20: Key Summary Investment Highlights

    Key Summary Investment Highlights • Current Enterprise Value only $9M • Company providing excellent leverage investment opportunity in sought after commodities upon exploration success • Multiple gold & silver targets ready to drill in a proven multi million ounce geological belt • Large scale & hig

  21. Slide 21: Contacts

    Contacts Jason Beckton j.beckton@prospech.com Peter Nightingale pnightingale@prospech.com.au Richard Edwards redwards@prospech.com.au Nicholas Downes nicholas.downes@pelotoncapital.com.au Prospech Limited: Phone 02 9300 3333 http://www.geo.sav.sk/en/structure-of-the-institute/laboratories/laboratory

  22. Slide 22: Appendix 1 JORC Table including details of Zemplin Sulphide Intersections

    Appendix 1 JORC Table including details of Zemplin Sulphide Intersections. Competent Person Statement The information in this Report that relates to Exploration Results, Exploration Targets and Mineral Resources is based on information compiled by Mr Jason Beckton, who is a Member of the Australian

  23. Slide 23: JORC Code, 2012 Edition – Table 1 Slovakian Projects

    JORC CODE, 2012 EDITION – TABLE 1 SLOVAKIAN PROJECTS ALL DRILLING ATRIBUTABLE TO PROSPECH LTD SINCE 2015 JASENIE PROJECT – KYSLA MINERAL RESOURCE – PROSPECH and GSSR (Geologicka Sluzba Slovenskej Republiky) Section 1: Reporting of Exploration Results Section 2: Sampling Techniques and Data Section 3

  24. Slide 24: JORC Table 1 – Drilling Techniques

    Criteria JORC Code explanation Commentary Drilling  Drill type (eg core, reverse circulation, open-hole  Diamond Drilling with PQ3, HQ3 and NQ3 core. techniques hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face

  25. Slide 25: JORC Table 1 – Sample Analysis and Quality Control

    Criteria JORC Code explanation Commentary determining the analysis including instrument each element when identified. Reported tungsten assays is assays were carried out by XRF methods – ME- make and model, reading times, calibrations XRF05 (pressed pellet) or ME-XRF12k (fused bead). factors applied

  26. Slide 26: JORC Table 1 – Orientation and Sample Security

    Criteria JORC Code explanation Commentary  Whether the orientation of sampling achieves  No bias is believed to be introduced by the sampling method. Orientation of unbiased sampling of possible structures and the data in relation extent to which this is known, considering the to geological deposi

  27. Slide 27: Section 2 Reporting of Exploration Results

    Section 2 Reporting of Exploration Results Criteria JORC Code explanation Commentary Mineral  Type, reference name/number, location and ownership  Prospech Limited, through subsidiaries and contractual rights, holds 100% rights on the Hodrusa-Hamre tenement including agreements or material issues

  28. Slide 28: JORC Table 1 – Drill Hole Information

    Criteria JORC Code explanation Commentary Schopfer Mine. The sample of amethyst stockwork (EMR_L02921) returned 0.07 g/t Au and 4.4 g/t Ag however, the sample was taken from hanging wall of Schopfer vein exposed in cave-in and the vein was not mined in this part of the mine.  Rozalia style - Ignac

  29. Slide 29: Drill Hole Survey and Intercept Information

    Criteria JORC Code explanation Commentary VS‐21 0 ‐60 60 0 60 Prospech drilling DH_Survey Hole_ID Depth Dip MAG_Azimuth UTM_Grid_ID UTM_Mag_Decl UTM_Azimuth CZDD001 0 ‐75 135 Prospech summary intercept and general sulphide information. Hole ID From To Lith Alteration Remark CZDD001 0 3.5 Soil Ox Soi

  30. Slide 30: CZDD001 Log and Relationship Between Mineralisation Widths

    CZDD001 136.5 151.5 Breccia Sil Moderate to strong sil/py/ill. Weak qz vt with minor sphalerite CZDD001 151.5 158.1 And Sil Medium grained porphyritic and. Weakly pyritized, weak qz/py vt CZDD001 158.1 159.95 Vein Sil Quartz breccia, with strong pyrite (20%), minor sphalerite, galenite, druzy amethy

  31. Slide 31: Section 3 Estimation and Reporting of Mineral Resources

    JORC Code explanation Commentary Criteria commercially sensitive. Section 3 Estimation and Reporting of Mineral Resources Criteria JORC Code explanation Commentary Database  Measures taken to ensure that data has not been  Data used in the Mineral Resource Estimate was provided in a validated Micr

  32. Slide 32: JORC Table 1 – Estimation and Modelling Techniques

    Criteria JORC Code explanation Commentary Estimation and  The nature and appropriateness of the estimation  The Mineral Resource estimate was based on surface diamond drilling, underground diamond drilling modelling technique(s) applied and key assumptions, including and underground channel sampli

  33. Slide 33: JORC Table 1 – Mining Factors or Assumptions

    Criteria JORC Code explanation Commentary Mining factors  Assumptions made regarding possible mining  Underground development of over 5km in cumulative length over the bulk of the orebody has already or assumptions methods, minimum mining dimensions and internal been completed which should result

  34. Slide 34: JORC Table 1 – Bulk Density and Classification

    Criteria JORC Code explanation Commentary Bulk Density  The bulk density for bulk material must have been  Bulk density determinations adopted the weight in air/weight in water method using a suspended or measured by methods that adequately account for hanging scale. The bulk density is calculated

Prospech — Australian Minerals and Energy Investor Conference – Brisbane 2021 on 6ix